(accountability)
e.g. AMSE CODE The Code contains mandatory requirements, specific prohibitions, and mandatory guidance for construction activities. The Code does not address all aspects of these activities and those aspects which are not specifically addressed should not be considered prohibited. The Code is not a handbook and can not replace education, experience, and the use of engineering judgment. The phrase engineering judgment refers to technical judgments made by knowledgeable designers experienced in the application of the Code. Engineering judgment must be consistent with Code philosophy and such judgment must never be used to overrule mandatory requirements or specific prohibition of the code. Code The Code does not address all aspects Code ASME Code ASME Code Code Committee Code
Code ASME does not approve rate, or endorse any item, construction, proprietary device, or activity. Users of a code or standard are expressly advised that determination of the validity of any such patent rights, and the risk of infringement of such right, is their own responsibility Code Code Code Symbol Code Code Committee Code Symbol ANI A/E Uniform Commercial Code UCC UCC LILCO EDG A/E BOT Proposal
expressed Wallace Certificate Holder
ANI A/E A/E A/E A/E A/E A/E A/E Code Code 1. 2.
I have to ask the vendor 1. FWCV 2. 1. 2. GE dwell pinpin hole Pin/pin hole 0.1880 /0.1875 pin GE Pin/pin hole 0.1887 /0.1870 pin GE 0.0017 interference GE GEGE pin hole GE
MSR Heater Drain Pump AMF N-Stamp N-Stamp 1. CCW Hx 2. Procedure Qualification Test N-stamp NQA Cycle of learning Time cycle 1.RCP
2. Performance-based engineering compliance-based Performance-basedCompliance / Cycle Time NEI 100MWe 2080 1
300MWe 3000 100MWe 1000 Mochovce 2 880MWe 2300 100MWe 260 4 514 2000 100MWe 60 100 100MWe 50-60
UCC The Act should be construed in accordance with its underlying purpose and policies. The text of each section should be read in the light of the purpose and policies of the rule or principle in question, as also of the Act as a whole, and the application of the language should be constructed narrowly or broadly, as the case may be, in conformity with the purposes and policies involved. Regulatory guide, Code 1. Code 2. Compliance-based Non-functional requirement
RTUTVT 60 100 waiting hour travel hour 50% SNUPPS 90% 70% SNUPPS 5 2 A/E
NRC NRC NRC PERT PERT 8 PERT PERT PERT PERT 1969
Prestige Cycle Time INPO NQA Procedure non-value added steps.
Flushing 8 sole plate (straight edge) 2 optical level 7 sling A/E A/E site manager - A/E
Polar Crane (Kori) 45
BOT cycle time cycle time cycle time non-value added control
CWP Shaft Sleeve 2.5
29 (Vender) Vender Vender Bypass
242 d05401@taipower.com.tw