1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP704 V1 World Bank Financed Project Jiangsu Province Water and Wastewater Project Resettlement Action Plan Executive Summary National Research Center for Resettlement HoHai University September 2008

2 Check & Ratify: Emendator: Director: Report Compilers: Wang Xiang Chen Yaocai Yang Bingshou Dong Weigang Shi Guoqing Shi Guoqing Chen Xiaonan Zhou Jian Lian Huan Yu Fangmei Wang Huijuan Jia Yongfei Sun Zhonggen Address: HoHai University, No.1 Xikang Road, Nanjing, Jiangsu Province P.R.C. Post Code: Tel: Fax: Website:

3 ABBREVIATIONS APs Affected Persons WB World Bank RAP Resettlement Action Plan PMO Project Management Office EA Executive Agency FSR Feasibility Study Report PLA Permanent Land Acquisition TLO Temporary Land Occupation BD Building Demolition IA Implementation Agency IR Involuntary Resettlement LRMB Land Resource Management Bureau AAOV Average Annual of Value VC Villagers Committee NWTPSC Nanjing Wastewater Treatment Plant and Sewerage Component ZJWIC Zhenjiang Jinshan Waterworks Improvement Component ZWTPSC Zhenjiang Wastewater Treatment Plant and Sewerage Component DRWSC Danyang Regional Water Supply Component DSSIC Danyang Shicheng Sewerage Improvement Component TRWSWTC Taixing Regional Water Supply and Wastewater Treatment Component YRWSC Yancheng Regional Water Supply Component CSIS Chengbei Sewerage Improvement Subcomponent QWTPSS Qiaobei Wastewater Treatment Plant and Sewerage Subcomponent TWTPSS Tiebei Wastewater Treatment Plant and Sewerage Subcomponent ZJWIS Zhenjiang Jinshan Waterworks Improvement Subcomponent DWTPSS Dingmao Wastewater Treatment Plant and Sewerage Subcomponent JWTPSS Jianbi Wastewater Treatment Plant and Sewerage Subcomponent ZSIS Zhengrunzhou Sewerage Improvement Subcomponent DRWSS Danyang Regional Water Supply Subcomponent DSSIS Danyang Shicheng Sewerage Improvement Subcomponent HWTPSS Huangqiao Wastewater Treatment Plant and Sewerage Subcomponent TRWSS Taixing Regional Water Supply Subcomponent YRWSS Yancheng Regional Water Supply Subcomponent UNITS mu area; 15 mu = 1 ha ha area; 1 ha = 15 mu m 2 square meter

4 Contents 1 INTRODUCTION BACKGROUND OBJECTIVES OF THE RESETTLEMENT ACTION PLAN AIMS OF THE RAP SCOPE OF THE RAP RELEVANT TERMS AND DEFINITIONS Relevant Terms and Definitions in World Bank Operational Policies Relevant Definitions in the RAP PROJECT DESCRIPTION PROJECT OVERVIEW PROJECT COMPONENTS PROJECT AFFECTED AREAS Project Benefited Areas Project Affected Areas LOCAL SOCIO-ECONOMIC PROFILE Jiangsu Province Nanjing Municipality Zhenjiang Municipality Taizhou Municipality Yancheng Municipality Affected County Level Cities and Districts PROGRAM OF PROJECT IMPLEMENTATION LINKED PROJECTS FINDINGS MEASURES FOR MINIMIZING PROJECT IMPACTS Planning and Design Phase Construction Phase Preparation and Implementation of the RAP PROJECT IMPACTS SOCIO-ECONOMIC PROFILE OF AFFECTED TOWNS AND VILLAGES GENERAL IMPACTS OF THE PROJECT AFFECTED LAND Permanent Land Acquisition Temporary Land Occupation Land Occupation for Pipelines along Planned Roads AFFECTED RESIDENTIAL HOUSES Residential Houses in Rural Area Residential Houses in Urban Area... 35

5 3.4.3 Temporary and Illegal Structures AFFECTED INSTITUTIONS AND ENTERPRISES Nanjing City Zhenjiang City AFFECTED SHOPS AFFECTED PERSONS SOCIO-ECONOMIC BASELINE OF AFFECTED HHS Population Profile Summary of Employment Area of Residential House Annual Income and Expenditure AFFECTED VULNERABLE GROUPS ETHNIC MINORITIES AFFECTED PUBLIC UTILITIES AND INFRASTRUCTURE REGULATION FRAMEWORK POLICY OBJECTIVE PRINCIPLES LAWS AND POLICIES National laws and regulations Regulations and Policies of Jiangsu Province World Bank Policy KEY SPECIFICATIONS OF REGULATIONS COMPENSATION STANDARDS PERMANENT ACQUISITION OF COLLECTIVE LAND PERMANENT ACQUISITION OF STATE-OWNED LAND TEMPORARY LAND OCCUPATION Temporary Occupation for Collectively-owned Land Temporary Occupation for State-owned Land RESIDENTIAL-HOUSE DEMOLITION Residential Houses in Rural Area Residential Houses in Urban Areas NON-RESIDENTIAL HOUSES DEMOLITION Demolition of Enterprises and Institutions Shops Demolition ILLEGAL STRUCTURES DEMOLITION GROUND ASSETS AND INFRASTRUCTURE RESTORATION AND REHABILITATION OBJECTIVES AND PRINCIPLES LAND ACQUISITION AND OCCUPATION Impact Analysis for Permanent Land Acquisition and Related Resettlement Plan Livelihood Restoration for the APs by PLA of Collectively-owned Land... 65

6 6.2.3 Impact Analysis for Temporary Land Occupation and Relevant Resettlement Plan DWELLING HOUSES Rural Dwelling Houses Urban Dwelling Houses NON-DWELLING STRUCTURES Resettlement Plan for Demolished Institutions and Enterprises Resettlement Plan for Shops Demolition ILLEGAL STRUCTURES DEMOLITION TRANSIENT POPULATION AND VULNERABLE GROUPS AFFECTED INFRASTRUCTURE AND ANCILLARY STRUCTURES OF FARMING ACTIVITIES PREDICTION ON THE ACHIEVEMENTS OF THE RESETTLEMENT PLAN PARTICIPATION CONSULTATION AND GRIEVANCE REDRESS MECHANISMS OBJECTIVES SURVEY FOR PUBLIC WILLINGNESS PUBLIC CONSULTATION AND INFORMATION DISCLOSURE Participation Plan during Implementation Phase Policy Disclosure GRIEVANCE REDRESS MECHANISMS ORGANIZATIONAL STRUCTURE INTRODUCTION OF RELATED ORGANIZATIONS ORGANIZATIONAL STRUCTURE RESPONSIBILITIES OF EACH ORGANIZATION The PMO of Jiangsu Province The PMO of Project Cities Project Implementation Unit Agency Responsible for House Demolition Appraisal Agency Responsible for House Demolition Implementation Project Design Institute (DI) NRCR of Hohai University STAFFING AND QUALIFICATION OF EACH ORGANIZATION RECOMMENDATIONS FOR CAPACITY BUILDING PROJECT EXECUTIVE SCHEDULE PRINCIPLES FOR LINKING UP RESETTLEMENT WITH DESIGN AND CONSTRUCTION Key Tasks of the Resettlement for Permanent Land Acquisition Key Tasks of the Resettlement for Temporary Land Occupation Key Tasks of the Resettlement for Dwelling Houses Demolition Key Tasks of the Resettlement for Institutions and Enterprises Demolition KEY MILESTONES OF RESETTLEMENT IMPLEMENTATION The Principles for Scheduling Land Acquisition and Resettlement Schedule of Land Prejudication Overall Timetable of Land Acquisition and Resettlement

7 9.3 OVERALL SCHEDULE OF LAND ACQUISITION AND RESETTLEMENT MONITORING & EVALUATION INTRODUCTION INTERNAL M&E Procedures Content of Internal M&E Reporting EXTERNAL M&E FOR RESETTLEMENT IMPLEMENTATION External M&E Institution Procedures and Contents of the External M&E Indicators of External M&E POST-RESETTLEMENT ASSESSMENT BUDGETING AND FUNDING TOTAL COST ANNUAL EXPENSES FUNDING PLAN FOR CASH FLOW MANAGEMENT Cash Flow Resettlement Fund Payment and Management MATRIX FOR ELIGIBILITY APPENDIX 1 RESETTLEMENT POLICY FRAMEWORK FOR JIANGSU PROVINCE WATER SUPPLY AND WASTEWATER TREATMENT PROJECT A BRIEF INTRODUCTION B SCOPE OF THE RPF C OBJECTIVES, PRINCIPLES AND RELEVANT TERMS OF THE RPF D PREPARATION AND APPROVAL OF THE RAP E FRAMEWORK OF RELEVANT LAWS AND REGULATION F ORGANIZATION ARRANGEMENT AND IMPLEMENTATION G FUNDING ARRANGEMENT H PUBLIC PARTICIPATION AND INFORMATION DISCLOSURE I GRIEVANCE PROCEDURES J MONITORING AND EVALUATION APPENDIX 2 SITUATION OF THE LINKED PROJECTS A LINKAGE PROJECTS FINDING B CONSTRUCTED LINKAGE PROJECTS RESETTLEMENT APPRAISAL C NON-CONSTRUCTED LINKED PROJECTS RESETTLEMENT APPENDIX 3 ANALYSIS OF RESETTLEMENT POLICY ON PLA...152

8 List of Tables Table 2-1 Category and Loans for Investment of the Project... 6 Table 2-2 Components and Subcomponents of the Project... 9 Table 2-3 Construction Description and Impact Type of the Project Table 2-4 Social Benefits of the Project Table 2-5 Socio-economic Profile of the Municipalities within the Project in Table 2-6 Project County-level Cities/Districts Socio-economic Indicators Table 2-7 Each Component Design Procedure Table 2-8 Linked Projects Finding from Components Table 2-9 Principal Measures Taken to Minimi 2 Resettlement Impacts and Related Effects Table 3-1 Socio-economic Profiles of the Streets/Towns within Project in Table 3-2 Socio-economic Profiles of affected Villages/Communities within Project in Table 3-3 General Resettlement Impacts of the Project Table 3-4 The Quality of Land Permanently Acquired by the Project Table 3-5 Situation of the PLA among all Components Table 3-6 Situation of TLO among all the Components Table 3-9 Situation of Residential House Demolition in Urban Area Table 3-10 Situation of Illegal Structures among all the Components Table 3-12 Situation of Enterprise and Institution Demolition in Nanjing City Table 3-13 Situation of Enterprise Demolition in Zhenjiang City Table 3-14 Situation of Shop Demolition of the Project Table 3-15 Situation of APs of the Project Table 3-16 Distribution of the Sample Table 3-17 Labor and Employment Situation of the Sample Table 3-18 Annual Income and Expenditure of the Sample HHs Table 3-20 Situation of the Vulnerable Groups Table 3-21 Affected Public Utilities and Infrastructure... 46

9 Table 4-1 Key Specifications and Regulations Applied in the Project IR Table 5-1 Compensation Standards for the Permanent Acquisition of Collectivelyowned Land Table 5-2 Administrative Fees for the Permanent Acquisition of Collectively-owned Land Table 5-3 Administrative Fees of Permanent State-owned Land Acquisition Table 5-4 Compensation Standard for TLO Table 5-5 Compensation Standard for Rural Residential House Demolition Table 5-6 Compensation standard for Urban Residential House Demolition Table 5-7 Compensation standard for Non-residential Building Demolition Table 5-8 Compensation Standard for Illegal Buildings Table 5-9 Compensation for Ground Assets and Infrastructure Table 6-1 Impact Analysis of Permanent Collectively-Owned Land Acquisition Table 6-2 Compensation Analysis of Permanent Collective Land Acquisition Table 6-3 Restoration Plan for Land-loss Farmers Table 6-4 Basic Living Security Standard for Land-loss Farmers Table 6-5 Rehabilitation of Rural Residential Houses Table 6-6 Analysis of the Allocation House Rehabilitation Table 6-7 Rehabilitation for Affected Enterprises and Institutions Table 6-8 Rehabilitation of Affected Shops Table 6-9 Restoration Measures for Vulnerable Groups Table 6-10 Prediction on the Achievements of the Resettlement Plan Table 7-1 Summary of Public Opinion and Psychological Questionnaire Table 7-2 Participation of the Project Table 7-3 Participation Plan of the Project Table 7-4 Channel of Grievance Redress Mechanisms for APs Table 8-1 Organization of PIUs and Reports Compilation Agencies Table 8-2 Staffing of the Resettlement Institutions Involved in the Project Table 8-3 Principals of the Resettlement Institutions Table 9-1 The Status of Land Prejudication among Subcomponents

10 Table 9-2 Overall Timetable of the Project in Resettlement Implementation Table 10-1 Sampling Ratio for IR in External M&E Table 10-2 Proposed Schedule of External M&E Report Table 11-1 Estimated Gross Budget on the Resettlement of the PROJECT Table 11-2 Estimated Cost on the Identified IR of the Components Table 11-3 Annual Expenses Plan of the Identified IR Table 11-4 Funding Resource of the PROJECT

11 List of Figures Figure 2-1 Distribution Map of the Project 8 Figure 3-1 Age Structure of Sampled Persons 41 Figure 3-2 Education Degree Distribution of Sampled Persons 42 Figure 3-3 Employment Structure of Sampled Labors 42 Figure 3-4 Income Resources and Expenditure Structure of the Sampled HHs 44 Figure 6-1 Flow Chart of the Appraisal on the Building in Urban Area 70 Figure 7-1 Schematic of Grievance Redress Mechanisms 89 Figure 9-1 Implementation Schedule of Resettlement Tasks 111 Figure 11-1 Cash Flow Chart 121

12 Introduction Background 1. With the aim of improving the quality of life and the productivity level of the people of Jiangsu Province, and further promoting the development of the local economy through providing an improved water supply and wastewater system, the Construction Department of Jiangsu Province organized for the relevant water supply and wastewater treatment service and implementation agencies in Nanjing Municipality, Zhenjiang Municipality, Taizhou Municipality and Yancheng Municipality to adopt loans from The World Bank to participate in a project entitled The Jiangsu Province of China Water Supply and Wastewater Treatment Project, financed by The World Bank (P096296). 2. Upon project completion, a complete and comprehensive urban wastewater treatment system will be operated in Jiangsu Province, for which a system comprising wastewater collection, drainage, treatment, re-use and sludge utilization will be completely built and implemented, and through which the quality of the surface water of the urban area will be improved, the underground water will be effectively protected and, ultimately, the sustainable socio-economic development of the urban area will be further accelerated. Objectives of the Resettlement Action Plan 3. The experience of The World Bank indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social and environmental risks, for example: production systems are dismantled; the affected persons (the APs) face impoverishment when their productive assets or income sources are lost; the APs are relocated to environments where their productive skills may be less applicable and the competition for resources greater; community institutions and social networks are weakened; kin groups are dispersed; and cultural identity, traditional authority, and the potential for mutual help are diminished or lost. 4. The Resettlement Action Plan (RAP) is designed according to the PRC s national and local laws and regulations and a series of provisions in the World Bank s operational policies OP4.12 Involuntary Resettlement. The objective of compiling this document is to set out an Action Plan to help APs improve their livelihoods and living standards, or at least to restore them to a relatively higher standard than pre-relocation or pre-project commencement levels, and make sure that the project will be beneficial to them. 1

13 Aims of the RAP 5. The objective of the RAP is to provide the APs with a resettlement restoration plan, to ensure that any losses they incur can be compensated for and that their living standards shall be improved or at least maintained at pre-project levels. A further aim is that any affected profitable production resources (including business shops and stores, enterprises and institutions), public property, infrastructure and cultural property, will also be improved or at least restored to pre-project levels. Scope of the RAP 6. The resettlement impacts caused by land acquisition and the demolition required by project construction have been identified. This RAP focuses on the plans for restoration and reconstruction. Those project-related resettlement impacts, which have been identified, are included in the body of the RAP. Those which have yet to be identified will be addressed in accordance with the policy procedures of Appendix 1 RPF for Jiangsu Province Water Supply and Wastewater Treatment Project. 7. The specific scope of the RAP includes the water supply or wastewater services construction of those cities and counties which have applied for World Bank loan projects in Nanjing Municipality, Zhenjiang Municipality, Taizhou Municipality and Yancheng Municipality, and Huangqiao Town Wastewater Treatment Systems Project. As the project design for the supporting facilities construction of the pipe networks within the towns or townships is not yet defined, the resettlement impacts are not yet clear. Since the caliber is small, the laying and construction activities can be flexible, and only involve temporary land occupation; therefore, the impacts of land acquisition and house demolition are minimal, and the compensation for resettlement has been included in the RPF. In respect of implemented and uncompleted associated projects,, the review appraisal for resettlement and rehabilitation shall be carried out; for projects which are not yet implemented, the resettlement impacts shall be included in the scope of the RAP, and the resettlement impacts of all associated projects will be included in the scope of the monitoring and evaluation tasks. Relevant Terms and Definitions Relevant Terms and Definitions in World Bank Operational Policies Eligibility for Benefits 8. Criteria for Eligibility. Displaced persons may be classified in one of the following three groups: 9. (a) those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country); 2

14 10. (b) those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan (c) those who have no recognizable legal right or claim to the land they are occupying. 12. Persons covered under (a) and (b) are compensated for the land they lose and given other assistance. Persons who come under category (c) are provided with resettlement assistance 2 in lieu of compensation for the land they occupy, and other assistance, as necessary, to achieve the objectives set out in this policy. All persons included in (a), (b) or (c) are provided compensation for the loss of assets other than land. Compensation and Resettlement Measures 13. (a) The resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are: 14. (i) informed about their options and rights pertaining to resettlement; 15. (ii) consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; and 16. (iii) provided prompt and effective compensation at full replacement cost 3 for losses of assets 4 attributable directly to the project. 17. (b) If the impacts include physical relocation, the resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are: 1 Such claims could be derived from adverse possession, from continued possession of public lands without government action for eviction (that is, with the implicit leave of the government), or from customary and traditional law and usage, and so on. 2 Resettlement assistance may consist of land, other assets, cash, employment, and so on, as appropriate. 3 "Replacement cost" is the method of valuation of assets that helps determine the amount sufficient to replace lost assets and cover transaction costs. In applying this method of valuation, depreciation of structures and assets should not be taken into account (for a detailed definition of replacement cost, see Annex A, footnote 1). For losses that cannot easily be valued or compensated for in monetary terms (e.g., access to public services, customers, and suppliers; or to fishing, grazing, or forest areas), attempts are made to establish access to equivalent and culturally acceptable resources and earning opportunities. Where domestic law does not meet the standard of compensation at full replacement cost, compensation under domestic law is supplemented by additional measures necessary to meet the replacement cost standard. Such additional assistance is distinct from resettlement assistance to be provided under the other clauses of para If the residual of the asset being taken is not economically viable, compensation and other resettlement assistance are provided as if the entire asset had been taken. 3

15 18. (i) provided assistance (such as moving allowances) during relocation; and 19. (ii) provided with residential housing, or housing sites, or, as required, agricultural sites for which a combination of productive potential, local advantages, and other factors is at least equivalent to the advantages of the old site (c) Where necessary to achieve the objectives of the policy, the resettlement plan or resettlement policy framework also includes measures to ensure that displaced persons are: 21. (i) offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living; 6 and 22. (ii) provided with development assistance in addition to compensation measures described in (a) (iii), such as land preparation, credit facilities, training, or job opportunities. Relevant Definitions in the RAP 23. (i) The demolition body is the qualified unit that implements the demolition activities for the project, and which should been granted a license for house demolition before the implementation; 24. (ii) The demolition-subjected person is the owner of a house which is (to be) demolished; 25. (iii) The housed tenant is the unit or individual who has a legal rental relationship with a demolition-subjected person; 26. (iv) The demolition scope is the scope of the housing demolition that is determined by the housing demolition administrative department according to the license for the planned use of the land for construction and the documents of approval for state-owned land use rights; 27. (v) The demolition period is a deadline determined by the housing demolition license during which the demolition body must conduct and complete the demolition activities; 28. (vi) The removal period is a deadline during which the relocation of the demolition-affected people must be completed, which is agreed upon or adjudicated in the agreement of compensation and resettlement for demolition by the demolitionaffected people and the demolition body; 5 The alternative assets are provided with adequate tenure arrangements. The cost of alternative residential housing, housing sites, business premises, and agricultural sites to be provided can be set off against all or part of the compensation payable for the corresponding asset lost. 6 Such support could take the form of short-term jobs, subsistence support, salary maintenance or similar arrangements. 4

16 29. (vii) The transitional period is a deadline for relocation and rollback, which is agreed upon in the agreement of compensation and resettlement for demolition by the parties involved in the demolition or determined in the demolition bulletin issued by the housing demolition administrative department; 30. (viii) Illegal buildings are structures that are erected within the planned urban areas without a planned construction project permit or those that are not in line with the requirements stated in the permit; 31. (ix) House appendages are the buildings and structures attached to the main houses, such as outdoor toilets, door sockets, chimneys, septic tanks etc. 32. (x) Monetary compensation: during the compensation agreement for the demolition, the demolition-subjected people give up the property rights, and the demolition body pays compensation in the form of a disposable currency payment and according to the real estate market appraisal value of the demolished house. 33. (xi) A property rights transition is an action in which the demolition body assumes ownership of the construction or purchasing property rights of the house to be demolished in exchange for a fee determined by the real estate market appraisal value of subject house and the real estate market price of the exchanged house, which is given as compensation to the demolition-subjected people. 34. (xii) Replacement cost is the cost of materials and labor paid for rebuilding a house of an equivalent structure and quality standard as the demolished house over the previous year. 35. (xiii) A house closure notification is the written notice in which the municipal house demolition administrative department instructs other departments such as planning, public security, real estate, land, industry and commerce to suspend relevant procedures in accordance with the determined demolition scope. 5

17 Project Description Project Overview 36. Jiangsu Province of China Water Supply and Wastewater Treatment Project Financed by World Bank contains 3 sub-projects: water supply aggregation, wastewater services in cities and towns, institutional strengthening and capacity building. The main contents are shown as the following: 37. Sub-project 1 Water supply Aggregation: In order to heighten service efficiency and improve the quality and stability of town (or township) tap water, this component would support regional water supply system of cities to cover surrounding towns and townships. The project area includes Taixing City of Taizhou Municipality, Danyang City and urban area of Zhenjaing Municipality, and Yancheng Municipality. 38. Sub-project 2 Wastewater services in cities and towns: This component would support the implementation of wastewater services in several key cities and towns, including Huangqiao Town (in Taixing City), Nanjing Municipality, Zhenjiang Municipality and Danyang City. 39. Sub-project 3 Institutional Strengthening and Capacity Building: This component would support: an information management system; a focused program of institutional strengthening required to assist existing city and township tap water companies merging operations; a series of studies on relevant reformation subject. In addition, project implementation supports would be involved. 40. According to the different entities applying to loans for project, Jiangsu Province of China Water Supply and Wastewater Treatment Project Financed by World Bank can be divided into (i) water supply aggregation and wastewater service; (ii) small loan projects; (iii) project assistance. The total investment of this project is about RMB million, including USD million of World Bank loan. 41. Situation of project categories and loans for investment is shown as Table 0-1. Table Category and Loans for Investment of the Project No Category Sub-project Construction Description Cost (RMB, million) Loan (USD, million) 1 water supply aggregation Plants, PS, pipeline construction in cities and and wastewater service towns Pipeline system improvement and HH configured 2 small loan projects within towns and villages in Zhenjiang and Danyang 3 project assistance Capacity building in Institutional strengthening, financing and management; staff training; 1.8 implementation management Total Cost

18 Project Components 42. This project involves 4 municipalities Nanjing, Zhenjiang, Taizhou, Yancheng, and 7 components: Nanjing Wastewater Treatment Plant and Sewerage Component, Zhenjiang Jinshan Waterworks Improvement Component, Zhenjiang Wastewater Treatment Plant and Sewerage Component, Danyang City Regional Water Supply Component, Danyang Shicheng Sewerage Improvement Component, Taixing Regional Water Supply and Wastewater Treatment Component, Yancheng City Regional Water Supply Component. Distribution of the 7 components is shown as Figure In addition, for pipelines project of within townships and towns, these townships and towns involved and project construction plan are not identified, of which 9 townships and towns will use small loans of WB to construct, the others will finance the construction by themselves. Resettlement for town pipelines projects should be executed in accordance with the RPF for Jiangsu Province Water Supply and Wastewater Treatment Project. 7

19 Figure Distribution Map of the Project 44. According to the types and regions of construction, the 7 components are mainly divided into 12 sub-components, of which 4 regional water supply sub-components and 8 wastewater treatment sub-components. The 12 sub-components are distributed in 5 cities, including Nanjing City, Zhenjiang City, Danyang City, Taixing City and Yancheng City. Although there is difference in administrative rank between the above five cities, they have their own jurisdiction and administrative functions, therefore the texts of following chapters of this report are expressed in the division of Nanjing City, Zhenjiang City, Danyang City, Taixing City and Yancheng City. The situation of project components and construction contents is shown as Table

20 Table Components and Subcomponents of the Project Municipality City Component Subcomponent Nanjing Wastewater Treatment Plant Qiaobei Wastewater Treatment Plant and Sewerage Subcomponent (QWTPSS) Nanjing Nanjing and Sewerage Component Chengbei Sewerage Improvement Subcomponent (CSIS) (NWTPSC) Tiebei Wastewater Treatment Plant and Sewerage Subcomponent (TWTPSS) Sub-total 1 3 Zhenjiang Jinshan Waterworks Improvement Component (ZJWIC) Zhenjiang Jinshan Waterworks Improvement Subcomponent (ZJWIS) Zhenjiang Zhenjiang Wastewater Treatment Plant and Sewerage Component (ZWTPSC) Zhengrunzhou Sewerage Improvement Subcomponent (ZSIS) Jianbi Wastewater Treatment Plant and Sewerage Subcomponent (JWTPSS) Dingmao Wastewater Treatment Plant and Sewerage Subcomponent (DWTPSS) Zhenjiang Sub-total 2 4 Danyang Danyang Regional Water Supply Component (DRWSC) Danyang Regional Water Supply Subcomponent (DRWSS) Danyang Shicheng Sewerage Improvement Component (DSSIC) Danyang Shicheng Sewerage Improvement Subcomponent (DSSIS) Sub-total 2 2 Taixing Regional Water Supply and Taixing Regional Water Supply Subcomponent (TRWSS) Taizhou Taixing Wastewater Treatment Component (TRWSWTC) Huangqiao Wastewater Treatment Plant and Sewerage Subcomponent (HWTPSS) Sub-total 1 2 Yancheng Regional Water Supply Yancheng Yancheng Component (YRWSC) Yancheng Regional Water Supply Subcomponent (YRWSS) Sub-total 1 1 Total

21 45. This project includes the construction or extension of new water purification plants, wastewater treatment plants, drawing water pumping stations and elevation pumping stations, and laying out the supporting muddy water pipelines, clean water pipelines and wastewater pipelines, which involves resettlement impacts like permanent land acquisition, temporary land occupation, house demolition, and the relocation and reconstruction of ancillary structures for farming activities and specific facilities. The construction contents of each sub-component and the main types of resettlement impacts are shown as Error! Not a valid bookmark self-reference.. Table Construction Description and Impact Type of the Project Sub- Component Construction Description component NWTPSC CSIS QWTPSS ❺ 1 pumping station (PS),22,500m 3 /d ❺ sewerage collection network: km (d400- d1500) ❺ WWTP:100,000m 3 /d ❺ sewerage collection network:63.67km (d300-d1800). ❺ 4 PS, total civil works capacity175,000m 3 /d Impact PLA TLO HD PLA TLO HD ZJWIC ZWTPSC TWTPSS ZJWIS DWTPSS JWTPSS ❺ 1 PS, 12,000m 3 /d ❺ WWTP: civil works100,000 m 3 /d; ❺ sewerage collection network:56.25km (d400-d1500). ❺ 300m raw water pipelines (DN1600); ❺ 8600m clean water pipelines ❺ Jinshan water works expansion to 200,000 m 3 /d; ❺ 1 water intake station, 200,000 m 3 /d ❺ construction of 1 PS (25,000 m 3 /d) and rehabilitation of 1 PS (50,000 m 3 /d); ❺ WWTP: 40,000 m 3 /d ❺ sewerage collection network: 11360m (d300-d1500). ❺ 2 PS, total capacity 10,000m 3 /d ❺ WWTP:10,000 m 3 /d ❺ sewerage collection network: 9120m (d300-d900). PLA TLO HD PLA TLO HD PLA TLO PLA TLO HD ZSIS ❺ sewerage collection network:19593m (d500-d1200). TLO DRWSC DRWSS ❺ raw water pipelines: 23.5km (DN1400-DN1500). ❺ Increase water works to 100,000 m 3 /d PLA TLO DSSIC DSSIS ❺ sewerage collection network: 23.47km (d400-d600) TLO TRWSWTC HWTPSS ❺ ❺ ❺ Huangqiao WWTP: total capacity 50,000 m 3 /d; I stage is 25,000 m 3 /d sewerage collection network: 45.58km (d400-d1000). 1 PS, civil works capacity 30,000 m 3 /d; PLA TLO 10

22 Component YRWSC Subcomponent TRWSS YRWSS Construction Description ❺ Baota WS plant (10,000 m 3 /d) expansion and technical innovation ❺ Secondary pipeline (connected to town): 127.3km ❺ Raw water pipeline:28.2km(dn600-dn800) ❺ 4 PS, including construct 2 new PS, renovate Huangqiao PS, expand Heshi PS ❺ 1 PS, 50,000 m 3 /d ❺ 10.5km raw water pipelines (DN1400) ❺ Increase 100,000m 3 /d capacity of water works ❺ 58.2km clean water pipelines (d500-d800) ❺ Increase 100,000 m 3 /d capacity of equipment to water intake Impact PLA TLO PLA TLO HD Project Affected Areas 46. The impacts and service scope of this project are located in Jiangsu Province, mainly in the five cities applying for World Bank loan Components. Jiangsu Province, abbreviated Su, lies on the east coastal center of China s mainland, with the east longitude between ' and121 57' and the north latitude between 30 45' and 35 20', located at the downstream of the Yangtze River and Huai River. It is close to Yellow Sea on the east, adjacent to Zhejiang and Shanghai on the southeast, adjoins to Anhui on the west and meets Shandong on the north. Jiangsu Province has 13 municipal cities. The total area is thousand km 2, accounting for 1.06% of whole county area, and ranking as 24th in China. At the end of 2007, the population is million, ranking as fifth in China. The population density is 743 people/ km 2, ranking as first among various provincial areas of China. Project Benefited Areas 47. The urban zone and Pukou District is the main area benefited from Nanjing Wastewater Treatment Plant and Sewerage Component, especially the North and Northwest part of Nanjing City, and the Tiebei zone in Pukou District. 48. The western region of Zhenjiang is the area benefited from Zhenjiang City Regional Water Supply Component. The area of regional water supply is 900 km 2 ; the people using water will reach to 1.05 million. The areas benefited from Zhenjiang Wastewater Treatment Plant and Sewerage Component are the core area of the main city, Nanxucheng District, Dingmao Area and Jianbi Division Area (excluding Dagang chemical industry area). 49. Various towns and townships of Danyang are the main areas benefited from Danyang City Regional Water Supply Component. Development District of Danyang City is the area benefited from Danyang City Development District Wastewater Collection System Component. The service scope of Danyang Shicheng Sewerage Improvement Component is domestic wastewater and industrial wastewater of the 11

23 region in the west of Jiandu River Xihuan Road, in the north of Danwai Road, in the west of Beijing-Hangzhou Grand Canal and in the south of Beiwaihuan Road. 50. The regional water supply services scope of Taixing Regional Water Supply and Wastewater Treatment Component is the urban zone of Taixing City and various towns and townships in the City. The main service scope of wastewater collection is the area of Huangqiao Town, Taixing City. 51. The service scope of Yancheng City Regional Water Supply First Issue Component includes the core area of the main city and seven towns of Yandu District: Guomeng Town, Qinnan Town, Gewu Town, Panhuang Town, Beijiang Town, Shangzhuang Town and Longgang Town. The service area is 531 km 2, and the serviced people is 990 thousand. 52. Overall, after the construction of the project, the incremental water supply capacity is m 3 /d. The incremental wastewater treatment capacity is m 3 /d. The total service area increases to km 2, and the total serviced people is up to 5.71 million. Social contributions of the project are shown as Table 0-4. Table Social Benefits of the Project Subcomponent Service area Population WW WWTP PS Pipeline (km 2 ) (10 4 pers.) (m 3 /d) (m 3 /d) (unit) (km) Actuality Nanjing CSIS QWTPSS TWTPSS Zhenjiang ZJWIS DWTPSS JWTPSS ZSIS Danyang DRWSS DSSIS Taixing HWTPSS TRWSS Yancheng YRWSS Increase Nanjing CSIS QWTPSS TWTPSS Zhenjiang ZJWIS DWTPSS

24 Subcomponent Service area (km 2 ) Population (10 4 pers.) WW (m 3 /d) WWTP (m 3 /d) PS (unit) Pipeline (km) JWTPSS ZSIS Danyang DRWSS DSSIS Taixing HWTPSS TRWSS Yancheng YRWSS Achievement Nanjing CSIS QWTPSS TWTPSS Zhenjiang ZJWIS DWTPSS JWTPSS ZSIS Danyang DRWSS DSSIS Taixing HWTPSS TRWSS Yancheng YRWSS Project Affected Areas 53. Resettlement impacts of the project include the impacts of permanent land acquisition, temporary land occupation and house demolition, and the impacts of the relocation and reconstruction of ancillary structures for farming activities and specific facilities. 54. The scope affected by Nanjing Wastewater Treatment Plant and Sewerage Component, the Bridge North Wastewater Treatment First Issue Component involves Pukou District; the City North Wastewater Collection System Improvement Component involves three districts: Xiaguan District, Gulou District and Qixia District; Tiebei Wastewater Treatment Systems Component involves Qixia District. 55. The areas affected by Zhenjiang City Regional Water Supply Component mainly involve Yiquan Village in Hepinglu Street, Runzhou District, and Zhenjiang 13

25 City. The areas affected by Zhenjiang Wastewater Treatment Plant and Sewerage Component mainly involve Runzhou District of Zhenjiang City and Xiangshan Town, Jianbi Town in Jingkou District. 56. The impact of Danyang Urban Regional Water Supply Component mainly involves Yunyang Town of Danyang City. The area affected by Danyang City Development District Wastewater Collection System Component is in Development District, and only involves temporary land occupation. The impacts of Danyang Shicheng Sewerage Improvement Component involve Xinfeng Town in Dantu District, Jingkou District and Zhenjiang New District. 57. The impacts of Taixing Regional Water Supply and Wastewater Treatment Component involve Taixing Town, Huangqiao Town, Zhangqiao Town and Gensi Town in Taixing City. 58. The impacts of Yancheng Regional Water Supply Component involve Wuyou Town of Tinghu District and Guomeng Town, Qinnan Town, Gewu Town, Panhuang Town, Beijiang Town, Shangzhuang Town and Longgang Town in Yandu District. Local Socio Economic Profile Jiangsu Province 59. Jiangsu province has 13 municipal cities, 106 counties (cities, districts), incl. 27 county-level cities, 25 counties and 54 municipal districts. By the end of 2006, it has 1103 towns or townships, incl. 994 organic towns and administrative villages. 60. In 2007, the gross domestic product (GDP) of Jiangsu Province was RMB 2, billion and it increased by 14.8% over the previous year. The added value of primary industry in Jiangsu was RMB billion, increasing by 4.0% over the previous year; the added value of secondary industry was RMB 1, billion, increasing by 15.5%, in which the added value of industries was RMB 1, billion, increasing by 16.6%; the added value of tertiary industry was RMB billion, increasing by 15.9%. Per-capita GDP was RMB 33,689, converted into US 4,430 dollars according to the exchange rate of the same year. 61. At the end of 2007 the resident population of Nanjing City was million, accounting for 5.7% of the total population of whole country; the ratio of urban population to rural population was 51.9:48.1, and the ratio of males to females was And the natural increase of population was 2.3. At present, the average area of towns and townships in the Province was km 2, and the average population is 53.5 thousand. At the end of 2007 urban and rural jobholders of whole province was million. The annual per-capita disposable income of urban residents was RMB 16,378, up by 16.3% over the previous year; the annual per-capita net income of rural residents was RMB 6,561, increasing by 12.9% in the last year. 62. The population of Jiangsu is mainly Han and it accounts for 99.64% of the total population in the province. There are not many ethnic minority people, there was

26 thousand persons, made up of 55 ethnic minorities, of which the population of Muslim is the largest, approximately accounting for 52% of the total population of ethnic minorities, other ethnic minorities whose population is larger than ten thousand are Miao, Mongolian, Manchu and Tujia. 63. Through field surveys and interviews within project impact scope, and visiting the local Religious Affairs Bureau, there is no ethnic monitory community in affected areas, and none of APs of ethnic monitories have been found in various cities for the moment. So, the project won t impact on these ethnic monitories. Nanjing Municipality 64. Nanjing (NJ) City, abbreviated Ning, lying in the hilly mountains of Ningzhen on the lower reaches of the Yangtze River, is the capital of Jiangsu Province. It is a famous ancient capital and historic cultural city. Nanjing is the political, cultural and economic center of Jiangsu Province, and it is an important central city on lower reaches of the Yangtze River. The total area of whole municipality is 6516km 2, of which the area of the city is 926 km 2. Its jurisdiction areas cross the north and south both banks of the Yangtze River, including Xuanwu, Baixia, Qinhuai, Jianye, Gulou and Xiaguan six city areas, Yuhuatai, Qixia, Pukou, Liuhe and Jiangning five suburbs, and Lishui and Gaochun two counties. 65. In 2007, the GDP of Nanjing was RMB billion and it increased by 15.6% over the previous year using comparative prices. In its GDP, the added value of primary industry in Nanjing was RMB 8.6 billion, increasing by 2.6% over the previous year; the added value of secondary industry was RMB billion, increasing by 16.0%; the added value of tertiary industry was RMB billion, increasing by 16.0%. The gross financial revenue of Nanjing was RMB billion, up by 27.1% over the previous year with the same requirements. 66. At the end of 2007 the resident population of Nanjing City was million, and the total population of registered permanent Nanjing residents was million, of which million people live in the city. Calculated on the number of the resident population, per-capita GDP was RMB 44,852, up by 11.5% over the last year; per-capita disposable income of urban residents was up to RMB 20,317, up by 15.8% over the previous year; per-capita net income of rural residents reached to RMB 8,020, up by 13.8%; per-capita house building area in the city is 30.03m 2, and the housing area of steel and brick-wood structures per person in the country is 45.8m 2. Zhenjiang Municipality 67. Zhenjiang (ZJ) City lies in the southwest of Jiangsu Province and lies on the south bank of the lower reaches of the Yangtze River, located at the top of Yangtze River Delta. It s adjacent to Nanjing in the west, Changzhou in the southeast, is close to the Yangtze River on the north, and is on the opposite side of the Yangtze River to Yangzhou and Taizhou. Zhenjiang Municipality has three cities: Danyang, Yangzhong and Jurong and four districts: Jingkou, Runzhou, Dantu and Zhenjiang 15

27 New District. The municipality has 41 towns and 10 streets; the total land area of is 3847km 2, incl hm 2 farmland and 132.2km 2 urban constructed areas. 68. In 2007, the GDP of Zhenjiang City was RMB billion and it increased by 15.5% over the previous year. The added value of primary industry in Zhenjiang was RMB 4.5 billion, increasing by 2.1% over the previous year; the added value of secondary industry was RMB 72.6 billion, increasing by 15.9%, of which the added value of industries was RMB 67.0 billion, increasing by 17.0%; the added value of tertiary industry was RMB 44.2 billion, increasing by 16.5%. The gross financial revenue of Zhenjiang was RMB billion, up by 34.4% in the last year. 69. In 2007, the total population of registered permanent Zhenjiang residents was million, increasing by 11.7 thousand in the last year, incl. male million and female million. The urban total population is million, and the natural increase rate of population was Calculated on the number of the resident population, per-capita GDP was RMB 40,333, up by 14.4% over the previous year; per-capita disposable income of urban residents was RMB 16,775, up by 17.4%; per-capita net income of peasants was RMB 8,007, up by 19.2%; per-capita house building area in the city is 32.7m 2, and the housing area of steel and brick-wood structures per person in the country is 46.0m 2. Taizhou Municipality 70. Taizhou (TZ) City is located on the middle of Jiangsu and it lies on the north bank of the Yangtze River. In August, 1996, approved by the State Council, Taizhou Municipality was set up. It has four cities: Jingjiang, Taixing, Jiangyan and Xinghua and two districts: Hailing and Gaogang; the total area is 5,793 km 2. In 2007, the GDP of Taizhou was RMB billion and it increased by 15.7% over the previous year. The added value of primary industry in Taizhou was RMB10.24 billion, increasing by 4.4% over the previous year; the added value of secondary industry was RMB billion, increasing by 17.5%; the added value of tertiary industry was RMB billion, increasing by 16.0%. The gross financial revenue was RMB billion, up by 36.0% in the last year. 71. At the end of 2007 the total population of registered permanent Nanjing residents was million, decreasing by 0.6% over the previous. The urban population was thousand, increasing by 0.8%. The natural increase rate of population was At the end of the year the resident population of Taizhou was million, decreasing by 1.2%. Calculated on the number of resident population, per-capita GDP was RMB 26,093, increasing by 17.0%. The annual per-capita disposable income of urban residents was RMB 14,940, up by 17.8% over the previous year; the annual per-capita net income of rural residents was RMB 6,469, increasing by 13.6%. Per-capita house building area of urban residents is 31.97m 2, and the housing area of steel and brick-wood structures per rural resident is 43.97m 2. 16

28 Yancheng Municipality 72. Yancheng (YC) City is located in the central plains in Northern Jiangsu. It s close to Yellow Sea on the east, adjacent to Huaiyang on the west, adjoins to Nantong City on the south and Lianyungang City on the north. In 1983, Yancheng was changed from district level to city level, and it implements the city-county administrative system. Yancheng City has two county-level cities: Dongtai and Dafeng, and five counties: Jianhu, Sheyang, Funing, Binhai and Xiangshui. The city has two districts: Yandu and Tinghu and Yancheng Development District. The total area of the city is 17 thousand km 2. It is the municipality with the most area and the second largest population in Jiangsu Province. 73. In 2007, the GDP of Yancheng was RMB billion and it increased by 15% over the previous year using comparative prices. The added value of primary industry in Nanjing was RMB 26 billion, increasing by 4% over the previous year; the added value of secondary industry was RMB 64.2 billion, increasing by 19.1%; the added value of tertiary industry was RMB 46.6 billion, increasing by 16.2%. The gross financial revenue of Yancheng was RMB billion, up by % in the last year with the same requirements. 74. At the end of 2007 the total population of registered permanent Yancheng residents was 8.08 million, of which 3.55 million live in urban, and the natural increase rate of population was 2.2. At the end of the year urban jobholders of whole city was million. Calculated on the number of resident population, percapita GDP was RMB 18,000, increasing by 15.2%. The annual per-capita disposable income of urban residents was RMB 13,857, increasing by 15% in the last year; the annual per-capita net income of peasants was RMB 6,030, increasing by 11.8%. Percapita house building area of urban residents is 25.95m 2, and the housing area of steel and brick-wood structures per rural resident is 35.48m The main socio-economic indicators of Jiangsu Province and the four affected municipalities in 2007 see Table 0-5. Table Socio economic Profile of the Municipalities within the Project in Area Unit Jiangsu NJ ZJ TZ YC Land area km Resident population 10 4 pers Disposable income per resident Yuan Net income per peasant Yuan City GDP billion Yuan Per GDP Yuan/pers Source: 2007 National Economy and Social Development Statistical Bulletin of each project city in government website. Affected County Level Cities and Districts 76. The project affected 4 districts in Nanjing City, Taixing City in Taizhou Municipality, Danyang City in Zhenjiang Municipality and 2 districts in Yancheng 17

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [ 第 30 卷 第 12 期 2011 年 12 月 地 理 科 学 进 展 PROGRESS IN GEOGRAPHY Vol.30, No.12 Dec., 2012 中 国 农 村 地 区 住 房 结 构 的 区 域 差 异 及 其 影 响 因 素 1, 2, 李 方 一 3 1,, 高 晓 路 2 2, 王 英 杰 (1. 中 国 科 学 院 区 域 可 持 续 发 展 分 析 与 模 拟 重

More information

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代 Chinese oil import policies and reforms SINOPEC EDRI 2014.8 Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化,

More information

WTO

WTO 10384 200015128 UDC Exploration on Design of CIB s Human Resources System in the New Stage (MBA) 2004 2004 2 3 2004 3 2 0 0 4 2 WTO Abstract Abstract With the rapid development of the high and new technique

More information

MACRO ECONOMY AND MICRO OPERATION 2016 ( 30%~50% ; 1 ) ; : ? 80 : 1993 ; ; ( ) ; 1. ;2014 ( 1 ) ( ) 105

MACRO ECONOMY AND MICRO OPERATION 2016 ( 30%~50% ; 1 ) ; : ? 80 : 1993 ; ; ( ) ; 1. ;2014 ( 1 ) ( ) 105 MACRO ECONOMY AND MICRO OPERATION * The Basic Connotation and Policy Suggestions on the Structural Reform of Agricultural Supply Side : ; 100872 Kong Xiangzhi Abstract: The field of agriculture of supply

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 i ii Abstract The most important task in human resource management is to encourage and help employees to develop their potential so that they can fully contribute to the organization s goals. The main

More information

601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999 2010 20082008 2000 197

601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999 2010 20082008 2000 197 BANK OF CHINA LIMITED 3988 2010 8 26 ** ** *** # Alberto TOGNI # # # * # 1 601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999

More information

1. Since the latest world financial crisis, Chinese government has been implementing expansionary active fiscal policies in response to declining econ

1. Since the latest world financial crisis, Chinese government has been implementing expansionary active fiscal policies in response to declining econ China s Recent Experiences for Fiscal Policy Under Demographic Changes and Uncertainties 1. Since the latest world financial crisis, Chinese government has been implementing expansionary active fiscal

More information

國立中山大學學位論文典藏.PDF

國立中山大學學位論文典藏.PDF The Study on the New Pension Scheme for Civil Servants Evidence from Kaohsiung County I II 1. III Thesis Abstract Title of Thesis The Study on the New Pension Scheme for Civil Servants: Evidence from Kaohsiung

More information

Microsoft PowerPoint - FY Q Results.ppt [互換モード]

Microsoft PowerPoint - FY Q Results.ppt [互換モード] FY3-2012 3 rd Quarter Results Tokyo Stock Exchange / Nagoya Stock Exchange 8593 Results announcement date : February 3, 2012 Inquiries: Corporate Communications Department Tel 81+3-6865-3002, Fax: 81+3-6895-5306

More information

GDP = + + SNA

GDP = + + SNA 许宪春 GDP GDP 0086 4 GDP = + + SNA 993 008 5 03 GDP GDP = + + = + + + + - GDP GDP GDP GDP GDP = + + - + - = + + + 3 6 3 4 5 3 4 5 008 38 0 5 0 3 008 SNA European Commission, International Monetary Fund,

More information

* RRB *

* RRB * *9000000000RRB0010040* *9000000000RRB0020040* *9000000000RRB0030040* *9000000000RRB0040040* *9000000000RRC0010050* *9000000000RRC0020050* *9000000000RRC0030050* *9000000000RRC0040050* *9000000000RRC0050050*

More information

Microsoft Word - 中級會計學--試題.doc

Microsoft Word - 中級會計學--試題.doc 國 立 高 雄 應 用 科 技 大 學 100 學 年 度 碩 士 班 招 生 考 試 會 計 系 准 考 證 號 碼 ( 考 生 必 須 填 寫 ) 中 級 會 計 學 試 題 共 5 頁, 第 1 頁 注 意 :a. 本 試 題 共 題, 每 題 分, 共 100 分 b. 作 答 時 不 必 抄 題 c. 考 生 作 答 前 請 詳 閱 答 案 卷 之 考 生 注 意 事 項 ㄧ 選 擇 題

More information

Corpus Word Parser 183

Corpus Word Parser 183 95 182 2010 1946 5 15 1948 6 15 1949 3 15 8 1 2011 2012 11 8 2015 12 31 Corpus Word Parser 183 2017. 1 ROST Content Mining 2003 20 60 2003 184 2003 20 60 1999 2009 2003 Discourse Analysis 1952 Language

More information

Microsoft PowerPoint - 06. Zhang Guohua.ppt [Compatibility Mode]

Microsoft PowerPoint - 06. Zhang Guohua.ppt [Compatibility Mode] 2015 年 中 欧 城 镇 化 伙 伴 关 系 论 坛 可 持 续 城 市 交 通 规 划 分 论 坛 Synergy of Transport, Industrial & Spatial Planning in the Age of New-type Urbanization 中 国 新 型 城 镇 化 与 交 通 产 业 空 间 协 同 规 划 Zhang Guohua Comprehensive

More information

國立屏東師範學院國民教育研究所碩士論文

國立屏東師範學院國民教育研究所碩士論文 國 立 屏 東 大 學 不 動 產 經 營 學 系 碩 士 班 碩 士 論 文 指 導 教 授 : 鄭 博 文 博 士 台 灣 與 大 陸 住 宅 政 策 之 法 律 保 障 研 究 生 : 呂 芳 雄 撰 中 華 民 國 一 四 年 六 月 台 灣 與 大 陸 住 宅 政 策 之 保 障 謝 誌 名 師 指 導 片 刻, 勝 君 苦 讀 終 日 對 於 離 開 學 校 相 當 多 年 又 坐 五

More information

國立高雄大學數位論文典藏

國立高雄大學數位論文典藏 AfterUse Evaluation and Study of the Student Walking Lanes in Communities of Kaohsiung City under the Subsidies of the Central Government 97 01 IV 30 39 10 19 I An Evaluative Study of the Use of Central-subsidized

More information

2005 3,? :; ;, ;,,,,,,1 % %,,,,, 1 %,,,, : () ;, ;,,,,,,,,,,,,, (2004) ( GBΠT ) 16 (2004), (2004) 47

2005 3,? :; ;, ;,,,,,,1 % %,,,,, 1 %,,,, : () ;, ;,,,,,,,,,,,,, (2004) ( GBΠT ) 16 (2004), (2004) 47 : 3 ( 100836) :,, : :,,,,,,,,,,, ; (),,,,,??,??,,?,? 1982 1995,?,,?, 3 (2004) (Harry X. Wu) ;(:Measuring Output of Service Sector in China ; :16913107) (:; :70273058), 46 2005 3,? :; ;, ;,,,,,,1 % 1987

More information

國立中山大學學位論文典藏.PDF

國立中山大學學位論文典藏.PDF I II III The Study of Factors to the Failure or Success of Applying to Holding International Sport Games Abstract For years, holding international sport games has been Taiwan s goal and we are on the way

More information

第六篇

第六篇 國 家 發 展 前 瞻 規 劃 委 辦 研 究 計 畫 - 產 業 人 力 供 需 評 估 ( 含 模 型 建 立 ) ( 第 二 年 度 計 畫 ) 編 號 : 國 家 發 展 前 瞻 規 劃 委 辦 研 究 計 畫 - 產 業 人 力 供 需 評 估 ( 含 模 型 建 立 ) 委 託 單 位 : 行 政 院 國 家 發 展 委 員 會 執 行 單 位 : 財 團 法 人 台 灣 經 濟 研

More information

國立中山大學學位論文典藏

國立中山大學學位論文典藏 i Examinations have long been adopting for the selection of the public officials and become an essential tradition in our country. For centuries, the examination system, incorporated with fairness, has

More information

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the 中 苗 農 村 再 生 社 區 農 村 建 設 設 施 體 檢 之 評 估 (1) 黃 隆 明 (2) 林 芸 暄 摘 要 (3) 徐 森 彥 本 研 究 蒐 集 民 國 90 年 至 103 年, 中 苗 地 區 88 個 農 再 社 區 中, 以 往 災 害 通 報 較 頻 繁 之 農 村 建 設 設 施, 作 為 辦 理 體 檢 評 估 之 對 象 ; 除 了 運 用 GIS 掌 握 農 村

More information

1 引言

1 引言 中 国 经 济 改 革 研 究 基 金 会 委 托 课 题 能 力 密 集 型 合 作 医 疗 制 度 的 自 动 运 行 机 制 中 国 农 村 基 本 医 疗 保 障 制 度 的 现 状 与 发 展 的 研 究 课 题 主 持 人 程 漱 兰 中 国 人 民 大 学 农 业 与 农 村 发 展 学 院 课 题 组 2004 年 4 月 2005 年 4 月 1 课 题 组 成 员 名 单 主 持

More information

第17期.indd

第17期.indd 2015 第 17 期 重 庆 市 人 民 政 府 关 于 加 快 发 展 服 务 贸 易 服 务 外 包 的 实 施 意 见 发 展 目 标 到 2017 年, 全 市 服 务 贸 易 进 出 口 总 额 突 破 300 亿 美 元, 年 均 增 长 速 度 达 到 30% 离 岸 服 务 外 包 执 行 额 突 破 30 亿 美 元, 年 均 增 长 速 度 达 到 30% 到 2020 年,

More information

4 : ,,,, 2000,, [3 ] [4 ] 1995, [5 ] [6 11 ],,,, 2, : (1) 21,,,, (2), 5, 2000, [12 ] (3),, (4),,,, (5),,, , 86,, 60 86,,,, 17 ( 1)

4 : ,,,, 2000,, [3 ] [4 ] 1995, [5 ] [6 11 ],,,, 2, : (1) 21,,,, (2), 5, 2000, [12 ] (3),, (4),,,, (5),,, , 86,, 60 86,,,, 17 ( 1) 22 4 2003 7 GEO GRAPHICAL RESEARCH Vol. 22, No. 4 J uly, 2003 1, Philip James 2, 3 (11, 200062 ; 21 (University of Salford), Salford, GM, U K; 31, 200062) :,,, 4 7 5,, : ; ; : K92815 ; C91218 ; F06113

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 A feasibility study of the Crisis Management Warning System in the River Example of Keelung River i Recently, because of the over development in the urban area and the natural geological nature, people

More information

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0067 - 06 1 2 ( 1. 苏 州 设 计 研 究 院 股 份 有 限 公 司, 江 苏 苏 州 215021; 2. 苏 州 市 消 防 支 队, 江 苏 苏 州 215021) 1 2 3 4

More information

untitled

untitled 計 畫 編 號 :MOEAWRA0950422 新 店 溪 ( 含 南 北 勢 溪 ) 水 與 綠 生 態 環 境 營 造 先 期 規 劃 研 究 Blueprint for The Development of Green Ecology at The Hsin-Tien Stream (Includes Nan-shin and Pei-shin Stream) 委 託 機 關 : 經 濟 部

More information

輥輯訛 % 2010~ % Northwestern Journal of Ethnology 1. J., 1994, 3 14~ J., ~150.

輥輯訛 % 2010~ % Northwestern Journal of Ethnology 1. J., 1994, 3 14~ J., ~150. 1001-5558 2012 01-0029-11 G75 A 12 BGA070049 07JHQ006 1. 50 J., 1999, 5 46~54. 2. J. 1998, 2 3~24.. J. 2008, 6 2 3~42. N. W. Journal of Ethnology 2012 1 72 2012.No.1 Total No.72 12 34 56 78 910 輥輯訛 2009

More information

中山大學學位論文典藏.pdf

中山大學學位論文典藏.pdf 1999 1992 11 7 1999 8811218 800 150.456 1387 1392 1680 The Research on the Faith in Cheng Hwang Yeh in Kinmen This research is written by a native kinmenese who does a long period of field research and

More information

chr82-06DuanW.hwp

chr82-06DuanW.hwp 上 海 小 三 線 建 設 在 縣 域 分 佈 特 點 的 歷 史 地 理 考 察 - 以 安 徽 省 寧 國 縣 为 例 - 段 偉 ( 中 國 復 旦 大 學 ) Ⅰ. 序 言 Ⅱ. 上 海 小 三 線 建 設 的 選 址 與 寧 國 縣 的 區 位 Ⅲ. 小 三 線 企 事 業 單 位 在 寧 國 縣 的 分 佈 Ⅳ. 改 造 後 的 寧 國 縣 小 三 線 建 設 與 城 鎮 發 展 Ⅴ.

More information

has become a rarity. In other words, the water resources that supply the needs in Taiwan depend crucially on the reservoirs built at least more than t

has become a rarity. In other words, the water resources that supply the needs in Taiwan depend crucially on the reservoirs built at least more than t 臺 灣 水 利 第 64 卷 第 1 期 民 國 105 年 3 月 出 版 Taiwan Water Conservancy Vol. 64, No. 1, March 2016 論 台 灣 水 資 源 開 發 的 必 要 性 The Essentiality of Water Resource Development in Taiwan * 虞 國 興 GWO-HSING YU 淡 江 大 學

More information

http / /yxxy. cbpt. cnki. net / % % %

http / /yxxy. cbpt. cnki. net / % % % 2017 3 Mar. 2017 5 2 Chongqing Higher Education Research Vol. 5 No. 2 DOI 10. 15998 /j. cnki. issn1673-8012. 2017. 02. 006 230039 2011 2015 2016 G649. 21 A 1673-8012 2017 02-0037-11 2017-01-03 2015zdjy024

More information

2015年4月11日雅思阅读预测机经(新东方版)

2015年4月11日雅思阅读预测机经(新东方版) 剑 桥 雅 思 10 第 一 时 间 解 析 阅 读 部 分 1 剑 桥 雅 思 10 整 体 内 容 统 计 2 剑 桥 雅 思 10 话 题 类 型 从 以 上 统 计 可 以 看 出, 雅 思 阅 读 的 考 试 话 题 一 直 广 泛 多 样 而 题 型 则 稳 中 有 变 以 剑 桥 10 的 test 4 为 例 出 现 的 三 篇 文 章 分 别 是 自 然 类, 心 理 研 究 类,

More information

基 本 資 料 - 本 報 告 書 以 環 保 再 生 紙 影 印

基 本 資 料 - 本 報 告 書 以 環 保 再 生 紙 影 印 基 本 資 料 103 年 度 臺 北 市 推 動 資 源 回 收 形 象 改 造 暨 物 業 管 理 工 作 計 畫 基 本 資 料 表 甲 委 辦 單 位 臺 北 市 政 府 環 境 保 護 局 乙 執 行 單 位 綠 信 環 境 科 技 股 份 有 限 公 司 丙 年 度 103 年 計 畫 編 號 103 環 勞 025 號 丁 專 案 性 質 非 屬 財 務 之 工 程 或 勞 務 戊 計

More information

A study on the Fire Safety of Interior Finishes: Residential Buildings in Kaohsiung City taken as Examples between the interior design of safety and skill tests of Scholastic. A Thesis Submitted to Institute

More information

地質調査研究報告/Bulletin of the Geological Survey of Japan

地質調査研究報告/Bulletin of the Geological Survey of Japan Shigeru Suto, Takayuki Inomata, Hisashi Sasaki and Sakae Mukoyama (2007) Data base of the volcanic ash fall distribution map of Japan. Bull. Geol. Surv. Japan, vol. 58(9/10), p.261-321, 8 figs, 2 tables,

More information

学 校 编 码 :10384 分 类 号 密 级 学 号 :X2007155130 UDC 厦 门 怡 福 养 生 健 康 管 理 有 限 公 司 创 业 计 划 王 韬 指 导 教 师 姓 名 : 郭 霖 教 授 厦 门 大 学 硕 士 学 位 论 文 厦 门 怡 福 养 生 健 康 管 理 有 限 公 司 创 业 计 划 A Business Plan for Xiamen Eve Health

More information

% % % % % % ~

% % % % % % ~ 1001-5558 2015 03-0021-16 2010 C91 A 2014 5 2010 N. W. Journal of Ethnology 2015 3 86 2015.No.3 Total No.86 2010 2010 2181.58 882.99 40.47% 1298.59 59.53% 2013 2232.78 847.29 37.95% 1385.49 62.05% 1990

More information

廣州舊城區的保護和發展

廣州舊城區的保護和發展 黄 爲 爲 爲 爲 塲 爲 茘 爲 爲 爲 爲 産 统 装 爲 爲 爲 爲 爲 爲 爲 茘 衞 産 爲 塲 爲 爲 爲 爲 爲 滙 爲 滙 爲 爲 爲 爲 爲麽麽 强 迹 啓 啓 産 産 [1] [2] [3] [4] 20 [5] 2000 [6] [7], 20 [8] http://www.gz.gov.cn2002.7.14 [9] 2000.4 [10] [11] 20 2001.1.29

More information

中国水泥窑协同处置概况

中国水泥窑协同处置概况 中 国 水 泥 窑 协 同 处 置 概 况 Overview on Waste Co-processing in Cement Kilns in China 中 国 水 泥 协 会 孔 祥 忠 KONG Xiangzhong China Cement Association 一 中 国 水 泥 产 能 情 况 Cement Production in China 截 至 2012 年 6 月 底,

More information

1 2 3 GARCH GARCH α > 0 α i > 0 p α i + q β j < 1 i = 1 j = 1 α < 0 β < 0 p α i + q β j < 1 i = 1 j = 1 1. GARCH α + β > 1 α β α > 0 β < 1 α + β > 1 4

1 2 3 GARCH GARCH α > 0 α i > 0 p α i + q β j < 1 i = 1 j = 1 α < 0 β < 0 p α i + q β j < 1 i = 1 j = 1 1. GARCH α + β > 1 α β α > 0 β < 1 α + β > 1 4 27 6 2017 JOURNAL OF UNIVERSITY OF JINANSocial Science Edition Vol. 27 No. 6 2017 GARCH 1 2 2 1. 4750002. 475000 2016 6 6 GARCH GARCH F832. 51 A 1671-3842201706 - 0129-11 GARCH 1 2 EARCH 3 4 17BJY194 1

More information

m m m ~ mm

m m m ~ mm 2011 10 10 157 JOURNAL OF RAILWAY ENGINEERING SOCIETY Oct 2011 NO. 10 Ser. 157 1006-2106 2011 10-0007 - 0124-05 710043 6 TBM TBM U455. 43 A Structural Calculation and Analysis of Transfer Node of Three

More information

%

% 38 1 2014 1 Vol. 38No. 1 January 2014 51 Population Research 2010 2010 2010 65 100028 Changing Lineal Families with Three Generations An Analysis of the 2010 Census Data Wang Yuesheng Abstract In contemporary

More information

國 史 館 館 刊 第 23 期 Chiang Ching-kuo s Educational Innovation in Southern Jiangxi and Its Effects (1941-1943) Abstract Wen-yuan Chu * Chiang Ching-kuo wa

國 史 館 館 刊 第 23 期 Chiang Ching-kuo s Educational Innovation in Southern Jiangxi and Its Effects (1941-1943) Abstract Wen-yuan Chu * Chiang Ching-kuo wa 國 史 館 館 刊 第 二 十 三 期 (2010 年 3 月 ) 119-164 國 史 館 1941-1943 朱 文 原 摘 要 1 關 鍵 詞 : 蔣 經 國 贛 南 學 校 教 育 社 會 教 育 掃 盲 運 動 -119- 國 史 館 館 刊 第 23 期 Chiang Ching-kuo s Educational Innovation in Southern Jiangxi and

More information

a b

a b 38 3 2014 5 Vol. 38 No. 3 May 2014 55 Population Research + + 3 100038 A Study on Implementation of Residence Permit System Based on Three Local Cases of Shanghai Chengdu and Zhengzhou Wang Yang Abstract

More information

Abstract Today, the structures of domestic bus industry have been changed greatly. Many manufacturers enter into the field because of its lower thresh

Abstract Today, the structures of domestic bus industry have been changed greatly. Many manufacturers enter into the field because of its lower thresh SWOT 5 Abstract Today, the structures of domestic bus industry have been changed greatly. Many manufacturers enter into the field because of its lower threshold. All of these lead to aggravate drastically

More information

CIP

CIP 2010 上 海 商 务 发 展 政 策 汇 编 上 海 市 商 务 委 员 会 上 海 科 学 技 术 文 献 出 版 社 CIP 前 言 2010 上 海 商 务 发 展 政 策 汇 编 由 上 海 市 商 务 委 员 会 汇 集 整 理, 收 录 了 近 年 来 上 海 市 政 府 及 其 相 关 职 能 部 门 出 台 的 有 关 商 务 领 域 的 产 业 发 展 产 业 管 理 扩 大

More information

untitled

untitled and Due Diligence M&A in China Prelude and Due Diligence A Case For Proper A Gentleman s Agreement? 1 Respect for the Rule of Law in China mandatory under law? CRITICAL DOCUMENTS is driven by deal structure:

More information

,,,,,,, :,,,,, ;,,,,,, : N = Y pr, dn N = dy Y - dpr pr, Y, N, pr,, (1),, ( : / ) :,, : t pr = e 1980 t = 1,t 9

,,,,,,, :,,,,, ;,,,,,, : N = Y pr, dn N = dy Y - dpr pr, Y, N, pr,, (1),, ( : / ) :,, : t pr = e 1980 t = 1,t 9 () FUDAN JOURNAL (Social Sciences) 2005 5 No. 5 2005 (, 200433) [ ] 2005 2010, :,10-12 %,300 600,, :,;, [] [] C913. 2 ;F127 [] A [ ] 0257 0289 (2005) 05 0202 011,, 1980 1990,1988 2500,1995 8000,2003 9820

More information

Microsoft Word - 刘藤升答辩修改论文.doc

Microsoft Word - 刘藤升答辩修改论文.doc 武 汉 体 育 学 院 硕 士 学 位 论 文 ( 全 日 制 硕 士 ) 社 会 需 求 视 角 下 武 汉 体 院 乒 乓 球 硕 士 研 究 生 就 业 状 况 研 究 研 究 生 : 刘 藤 升 导 师 : 滕 守 刚 副 教 授 专 业 : 体 育 教 育 训 练 学 研 究 方 向 : 乒 乓 球 教 学 训 练 理 论 与 方 法 2015 年 5 月 分 类 号 : G8 学 校 代

More information

硕 士 专 业 学 位 论 文 论 文 题 目 无 锡 市 区 机 关 公 务 员 健 身 锻 炼 现 状 研 究 The Study on Physical Exercises of Civil Servants in Wuxi 研 究 生 姓 名 张 征 指 导 教 师 姓 名 陆 阿 明 教 授 专 业 名 称 研 究 方 向 论 文 提 交 日 期 体 育 教 育 训 练 学 体 育 健 身

More information

104-012-7794 MOTC-IOT-103-H1DB001a 臺 灣 港 務 公 司 之 監 督 與 公 司 治 理 績 效 評 估 研 究 (2/2) 著 者 : 謝 幼 屏 吳 榮 貴 朱 金 元 吳 朝 升 孫 儷 芳 王 克 尹 林 玲 煥 張 淑 滿 陳 銓 楊 世 豪 陳 秋 玲

104-012-7794 MOTC-IOT-103-H1DB001a 臺 灣 港 務 公 司 之 監 督 與 公 司 治 理 績 效 評 估 研 究 (2/2) 著 者 : 謝 幼 屏 吳 榮 貴 朱 金 元 吳 朝 升 孫 儷 芳 王 克 尹 林 玲 煥 張 淑 滿 陳 銓 楊 世 豪 陳 秋 玲 104-012-7794 MOTC-IOT-103-H1DB001a 臺 灣 港 務 公 司 之 監 督 與 公 司 治 理 績 效 評 估 研 究 (2/2) 交 通 部 運 輸 研 究 所 中 華 民 國 104 年 3 月 104-012-7794 MOTC-IOT-103-H1DB001a 臺 灣 港 務 公 司 之 監 督 與 公 司 治 理 績 效 評 估 研 究 (2/2) 著 者 :

More information

東方設計學院文化創意設計研究所

東方設計學院文化創意設計研究所 東 方 設 計 學 院 文 化 創 意 設 計 研 究 所 碩 士 學 位 論 文 應 用 德 爾 菲 法 建 立 社 區 業 餘 油 畫 課 程 之 探 討 - 以 高 雄 市 湖 內 區 為 例 指 導 教 授 : 薛 淞 林 教 授 研 究 生 : 賴 秀 紅 中 華 民 國 一 o 四 年 一 月 東 方 設 計 學 院 文 化 創 意 設 計 研 究 所 碩 士 學 位 論 文 Graduate

More information

be invested on the desilting of water sources and to paved canals with cement mortar while drinking water project can focus on the improvement of wate

be invested on the desilting of water sources and to paved canals with cement mortar while drinking water project can focus on the improvement of wate 2011 9 100101 101 3 2007 2000 10 F303 A 1002-9753 2011 09-0030 - 11 Trends on Public Infrastructure and Public Investment Priority in Rural China LUO Ren - fu ZHANG Lin - xiu ZHAO Qi - ran HUANG Ji - kun

More information

Microsoft Word - 荆红卫 板.doc

Microsoft Word - 荆红卫 板.doc 中 国 环 境 科 学 213,33(2):319~327 China Environmental Science 北 京 北 运 河 水 系 水 质 污 染 特 征 及 污 染 来 源 分 析 荆 红 卫 1*, 张 志 刚 2 1, 郭 婧 (1. 北 京 市 环 境 保 护 监 测 中 心, 北 京 148;2. 核 与 辐 射 安 全 中 心, 北 京 182) 摘 要 : 以 北 运 河

More information

香港藝術發展局委託報告

香港藝術發展局委託報告 香 港 藝 術 發 展 局 委 託 報 告 香 港 藝 團 與 內 地 交 流 資 料 結 集 和 分 析 A STUDY ON CULTURAL EXCHANGE OF LOCAL ARTS GROUPS WITH THE MAINLAND 終 期 報 告 香 港 大 學 文 化 政 策 研 究 中 心 2006 年 12 月 香 港 藝 團 與 內 地 交 流 資 料 結 集 和 分 析 許 焯

More information

厦 门 大 学 学 位 论 文 原 创 性 声 明 本 人 呈 交 的 学 位 论 文 是 本 人 在 导 师 指 导 下, 独 立 完 成 的 研 究 成 果 本 人 在 论 文 写 作 中 参 考 其 他 个 人 或 集 体 已 经 发 表 的 研 究 成 果, 均 在 文 中 以 适 当 方

厦 门 大 学 学 位 论 文 原 创 性 声 明 本 人 呈 交 的 学 位 论 文 是 本 人 在 导 师 指 导 下, 独 立 完 成 的 研 究 成 果 本 人 在 论 文 写 作 中 参 考 其 他 个 人 或 集 体 已 经 发 表 的 研 究 成 果, 均 在 文 中 以 适 当 方 学 校 编 码 :10384 分 类 号 密 级 学 号 : UDC 硕 士 学 位 论 文 浙 江 省 人 事 考 试 突 发 事 件 应 对 策 略 探 析 An Exploration of Zhejiang Province Personnel Examination Emergency Strategy 姜 海 峰 指 导 教 师 姓 名 : 王 玉 琼 教 授 专 业 名 称 : 公 共

More information

untitled

untitled 19932005 1 1993-2005 The Urban Residential Housing System in Shanghai 1993-2005: the Marketization Process and Housing Affordability Jie Chen, Assistant Professor, Management School of Fudan University,

More information

. OER

. OER 20 4 2014 8 Open Education Research Vol. 20 No. 4 Aug. 2014 200062 G72 A 1007-2179 2014 04-0100 - 11 GDP 3000 50% 2014-2020 1978-2013 1. 7 7. 3 17. 9% 53. 7% 1. 02 193 658 2173 2005 1998 20113 53. 73%

More information

2005 Research on the Lucre, Risk, and Development of Native Bankcard Business 2005 3 2003 6.5 45 18, WTO SWOT I Abstract Research on the Lucre, Risk, and Development of Native Bankcard Business Research

More information

Microsoft Word - 刘 慧 板.doc

Microsoft Word - 刘  慧 板.doc 中 国 环 境 科 学 2012,32(5):933~941 China Environmental Science 系 统 动 力 学 在 空 港 区 域 规 划 环 境 影 响 评 价 中 的 应 用 刘 慧 1,2, 郭 怀 成 1*, 盛 虎 1, 都 小 尚 1,3, 李 娜 1 1, 杨 永 辉 (1. 北 京 大 学 环 境 科 学 与 工 程 学 院, 北 京 100871; 2.

More information

LH_Series_Rev2014.pdf

LH_Series_Rev2014.pdf REMINDERS Product information in this catalog is as of October 2013. All of the contents specified herein are subject to change without notice due to technical improvements, etc. Therefore, please check

More information

YANGTZE RIVER ACADEMIC 2013 4 40 2013 No. 4 Serial No. 40 100081 1960 1992 2004 1974 2004 2000 1 27 2013 4 1992 25 27 1983 1 2006 144 145 2000 111 28 2006 144 2007 28 3330 29 30 2013 4 2006 78 2006 174

More information

08陈会广

08陈会广 第 34 卷 第 10 期 2012 年 10 月 2012,34(10):1871-1880 Resources Science Vol.34,No.10 Oct.,2012 文 章 编 号 :1007-7588(2012)10-1871-10 房 地 产 市 场 及 其 细 分 的 调 控 重 点 区 域 划 分 理 论 与 实 证 以 中 国 35 个 大 中 城 市 为 例 陈 会 广 1,

More information

國立中山大學學位論文典藏.PDF

國立中山大學學位論文典藏.PDF 國 立 中 山 大 學 公 共 事 務 管 理 研 究 所 碩 士 在 職 專 班 碩 士 論 文 我 國 鄉 鎮 市 行 政 區 劃 調 整 之 研 究 - 以 屏 東 縣 為 例 研 究 生 : 吳 英 磊 撰 指 導 教 授 : 吳 濟 華 博 士 鄭 博 文 博 士 中 華 民 國 九 十 九 年 八 月 摘 要 世 界 各 國 政 府 為 應 因 全 球 化 的 趨 勢 紛 紛 推 動 政

More information

Microsoft Word - 24217011311120061钟翠翠.doc

Microsoft Word - 24217011311120061钟翠翠.doc HUAZHONG AGRICULTURAL UNIVERSITY 硕 士 学 位 论 文 MASTER S DEGREE DISSERTATION 女 性 主 义 视 角 下 女 大 学 生 就 业 性 别 歧 视 现 状 研 究 以 华 中 农 业 大 学 为 例 RESEARCH ON THE STATUS OF GENDER DISCRIMINATION IN EMPLOYMENT FOR FEMALE

More information

X UDC A Post-Evaluation Research on SINOPEC Refinery Reconstruction and Expanding Project MBA 厦门大学博硕士论文摘要库

X UDC A Post-Evaluation Research on SINOPEC Refinery Reconstruction and Expanding Project MBA 厦门大学博硕士论文摘要库 2003 2 10384 X9915078 UDC A Post-Evaluation Research on SINOPEC Refinery Reconstruction and Expanding Project MBA 2003 2 2003 3 2003 200 / Abstract Post-evaluation is a comprehensive evaluation on an implemented

More information

1505.indd

1505.indd 上 海 市 孙 中 山 宋 庆 龄 文 物 管 理 委 员 会 上 海 宋 庆 龄 研 究 会 主 办 2015.05 总 第 148 期 图 片 新 闻 2015 年 9 月 22 日, 由 上 海 孙 中 山 故 居 纪 念 馆 台 湾 辅 仁 大 学 和 台 湾 图 书 馆 联 合 举 办 的 世 纪 姻 缘 纪 念 孙 中 山 先 生 逝 世 九 十 周 年 及 其 革 命 历 程 特 展

More information

4 51 1 Scoones 1998 20 60 70 2002 2001 20 90 World Bank DFID Sussex IDS 2012 2 2. 1 UNDP CARE DFID DFID DFID 1997 IDS 2009 1 5

4 51 1 Scoones 1998 20 60 70 2002 2001 20 90 World Bank DFID Sussex IDS 2012 2 2. 1 UNDP CARE DFID DFID DFID 1997 IDS 2009 1 5 38 4 2014 7 Vol. 38 No. 4 July 2014 50 Population Research * 30 4 100872 Livelihood and Development Capacity of Families Obeying the Family Planning Policy in Rural China A Sustainable Livelihood Analytical

More information

本 論 文 獲 行 政 院 客 家 委 員 會 一 年 客 家 研 究 優 良 博 碩 士 論 文 獎 助

本 論 文 獲 行 政 院 客 家 委 員 會 一 年 客 家 研 究 優 良 博 碩 士 論 文 獎 助 國 立 中 央 大 學 客 家 社 會 文 化 研 究 所 碩 士 論 文 遠 渡 重 洋 的 美 食 臺 灣 客 家 擂 茶 的 流 變 研 究 生 : 黃 智 絹 指 導 教 授 : 周 錦 宏 博 士 中 華 民 國 一 百 年 六 月 本 論 文 獲 行 政 院 客 家 委 員 會 一 年 客 家 研 究 優 良 博 碩 士 論 文 獎 助 國 立 中 央 大 學 圖 書 館 碩 博 士 論

More information

标题

标题 012 Journal of Library Science in China 嘉 兴 模 式 的 延 伸 与 深 化 : 从 总 分 馆 体 系 到 图 书 馆 服 务 体 系 李 超 平 摘 要 嘉 兴 模 式 包 含 两 个 体 系 : 一 是 以 总 分 馆 为 核 心 的 公 共 图 书 馆 服 务 体 系, 二 是 跨 系 统 的 图 书 馆 服 务 联 盟 体 系 研 究 发 现, 从

More information

内容 Outline 1 中国机动化进程及其影响 Motorization and its effects 2 中国道路交通安全发展及形势 Road traffic development and trends 3 中国客车特大事故特征及政策回顾 Fatal crash analysis and s

内容 Outline 1 中国机动化进程及其影响 Motorization and its effects 2 中国道路交通安全发展及形势 Road traffic development and trends 3 中国客车特大事故特征及政策回顾 Fatal crash analysis and s 城市交通发展中的道路安全研讨会 唐琤琤博士/研究员 张建军副研究员 胡晗副研究员 交通运输部公路科学研究院 交通运输部公路交通安全工程研究中心 交通运输部公路交通安全技术行业重点实验室 2013年12月19日 内容 Outline 1 中国机动化进程及其影响 Motorization and its effects 2 中国道路交通安全发展及形势 Road traffic development and

More information

% % 99% Sautman B. Preferential Policies for Ethnic Minorities in China The Case

% % 99% Sautman B. Preferential Policies for Ethnic Minorities in China The Case 1001-5558 2015 03-0037-11 2000 2010 C95 DOI:10.16486/j.cnki.62-1035/d.2015.03.005 A 1 2014 14CRK014 2013 13SHC012 1 47 2181 N. W. Journal of Ethnology 2015 3 86 2015.No.3 Total No.86 20 70 122000 2007

More information

Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial

Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial Fulfillment of the Requirements For the Degree of Master

More information

吴 郁 玲 等 : 农 户 对 宅 基 地 使 用 权 确 权 效 应 的 认 知 研 究 以 武 汉 市 为 例 29 the paper tried to provide a basis to improve the confirmation policy efficiency and to f

吴 郁 玲 等 : 农 户 对 宅 基 地 使 用 权 确 权 效 应 的 认 知 研 究 以 武 汉 市 为 例 29 the paper tried to provide a basis to improve the confirmation policy efficiency and to f 第 30 卷 第 4 期 2016 年 4 月 中国土地科学 China Land Sciences Vol.30 No.4 Apr.,2016 doi: 10.11994/zgtdkx.20160523.153245 农户对宅基地使用权确权效应的认知研究 以武汉市为例 吴郁玲 1 侯 娇 1 冯忠垒 2 周 勇 1 1. 华中师范大学城环学院 湖北 武汉 430079 2. 中国地质大学 武汉 经济管理学院

More information

Microsoft Word - 0302002

Microsoft Word - 0302002 台 灣 社 區 工 作 與 社 區 研 究 學 刊 2013 年 10 月 頁 25-68 研 究 論 文 第 三 卷 第 二 期 在 稀 少 中 看 見 豐 富 澎 湖 縣 望 安 鄉 社 區 * 資 產 之 探 究 趙 善 如 國 立 屏 東 科 技 大 學 社 會 工 作 系 教 授 ** 王 仕 圖 國 立 屏 東 科 技 大 學 社 會 工 作 系 副 教 授 張 麗 珠 國 立 屏 東

More information

Figure_05Print.pdf

Figure_05Print.pdf F-43 2 Thi Nai Swamp Thuan Hat Weir Railway Br. Thac De Weir Binh Than Weir 15.0 Lao Tam Weir Chan Man Br. National Road Son Cai Br. Chan Nhon Br. F-44 1 5.0 Lao Don Weir Left Bank Lowest river-bed Right

More information

瑏瑠 % 瑏瑡 % % 瑏瑢 19

瑏瑠 % 瑏瑡 % % 瑏瑢 19 * 1961 1963 1 2 3 4 5 1958 1965 200433 chen_xi@ fudan. edu. cn * 2015M570320 1 2 3 4 2000 4 2001 6 1999 1 1999 5 5 1961 1963 2003 2007 7 140 1 2 3 4 5 20 50 20 6 20 50 1957 200 7 1958 11 11 8 9 1958 3

More information

2012 D A % %

2012 D A % % 2012 5 29 3 Journal of Shanghai University Social Sciences May. 2012 Vol. 29 No. 3 doi 10. 3969 /j. issn 1007-6522. 2012. 03. 001 100007 14 2012-04-05 1955-1 2012 D912. 6 A 1007-6522 2012 03-0001-16 20022008

More information

untitled

untitled Abstract Nowadays, more and more countries begin with the development of creative industries as a strategy to revive the economy. It not only strengthens the link between economic development and local

More information

Microsoft Word - bxyj2007_01_zongdi225.doc

Microsoft Word - bxyj2007_01_zongdi225.doc 以 科 学 发 展 观 为 统 领 深 入 贯 彻 落 实 国 务 院 23 号 文 件 全 面 提 高 保 险 业 服 务 社 会 主 义 和 谐 社 会 的 能 力 吴 定 富 ( 中 国 保 险 监 督 管 理 委 员 会, 北 京 100032) [ 摘 要 ]2006 年, 我 国 保 险 业 社 会 地 位 稳 步 提 高, 国 际 影 响 力 不 断 扩 大, 发 展 环 境 日 益

More information

10384 X0115071 UDC The Research For The Actuality And Development Stratagem Of The China Securities Investment Fund (MBA) 2003 11 2003 12 2003 12 2 0 0 3 11 100 1991, WTO Abstract Abstract The Securities

More information

Microsoft Word - 0000000673_4.doc

Microsoft Word - 0000000673_4.doc 香 港 特 別 行 政 區 政 府 知 識 產 權 署 商 標 註 冊 處 Trade Marks Registry, Intellectual Property Department The Government of the Hong Kong Special Administrative Region 在 註 冊 申 請 詳 情 公 布 後 要 求 修 訂 貨 品 / 服 務 說 明 商 標

More information

162 方 忠 明 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 一 香 港 鐵 路 有 限 公 司 (MTR) 與 港 鐵 路 網 1975 年 香 港 政 府 鑑 於 都 市 交 通 的 日 益 繁 忙, 成

162 方 忠 明 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 一 香 港 鐵 路 有 限 公 司 (MTR) 與 港 鐵 路 網 1975 年 香 港 政 府 鑑 於 都 市 交 通 的 日 益 繁 忙, 成 捷 運 技 術 半 年 刊 第 46 期 161 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 1 方 忠 明 摘 要 TOD 模 式 是 捷 運 建 設 開 發 規 劃 的 理 念 趨 勢, 沿 著 捷 運 廊 道 進 行 高 密 度 的 土 地 開 發, 配 合 其 他 大 眾 運 輸 工 具 和 行 人 網

More information

Microsoft Word - Alan Jameson's Master's Thesis.pdf

Microsoft Word - Alan Jameson's Master's Thesis.pdf Obstacles and Opportunities for Microcredit Companies Developing in the Countryside Dissertation Presented in Partial Fulfillment of the Requirements for Master of Arts in the Graduate School of The Ohio

More information

窶ヲX窶ヲ窶ヲ窶コ窶ヲfi窶ヲJ-\窶敞

窶ヲX窶ヲ窶ヲ窶コ窶ヲfi窶ヲJ-\窶敞 8 10 8 30 16 45 Victoria Victoria CEB T.M.S.K.Tilakaratha Chief Engineer of Victoria Hydropower Station Mahaweli Authority S.R.A.Aruppola Chief Enjineer Victoria EML Consultants Kalyani Dias CECB Upul

More information

20-25%,

20-25%, 2011.19 笮 1929 1957 / 361005-8 - 20-25%, http://www.hedb.xmu.edu.cn 1 2000-12000 3500-20000 20 80 4628 1000 600 300-9 - 1 / 3 4 2 1800-4500 2800-20000 1800-20000 3 P

More information

SWOT Abstract Abstract Fuzhou Water & Wastewater Engineering Design Institute is an affiliate project prospecting and designing unit under Fuzhou Water Supply General Company. It engages mainly in the

More information

. STEM OER STEM 600 STEM CCSS STEM CCSS STEM ISTE Indiana Department of STEM Education 2013 STEM STEM STEM STEM STEM 10 STEM 2017 S

. STEM OER STEM 600 STEM CCSS STEM CCSS STEM ISTE Indiana Department of STEM Education 2013 STEM STEM STEM STEM STEM 10 STEM 2017 S 23 3 2017 6 Open Education Research Vol. 23 No. 3 Jun. 2017 STEM 1 2 1 1 1 1. 475004 2. 475004 STEM STEM STEM STEM STEM STEM STEM STEM STEM STEM STEM STEM STEM G443 A 1007-2179 2017 03-0050-12 STEM 2011

More information

東莞工商總會劉百樂中學

東莞工商總會劉百樂中學 /2015/ 頁 (2015 年 版 ) 目 錄 : 中 文 1 English Language 2-3 數 學 4-5 通 識 教 育 6 物 理 7 化 學 8 生 物 9 組 合 科 學 ( 化 學 ) 10 組 合 科 學 ( 生 物 ) 11 企 業 會 計 及 財 務 概 論 12 中 國 歷 史 13 歷 史 14 地 理 15 經 濟 16 資 訊 及 通 訊 科 技 17 視 覺

More information

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 会 密 切 关 联 的 艺 术, 同 时 也 是 建 设 人 类 生 活 的 构 架, 而 这 一 切

More information

% 6 9 [1] % 97% [2] 2 93% 3 4,, 2

% 6 9 [1] % 97% [2] 2 93% 3 4,, 2 1 2 3 (1. 010021;2. 980-8578;3. 980-0845, :, 10, : S288 A,,,,, 2004,,, 1 1 40 47-41 23 110 31-111 53 110 60 50 1 2.4 34.4-37 360.4 81% 6 9 [1] 200 2006 17.3 14.3 84% 97% [2] 2 93% 3 4,, 2 2 3 : 2007 3

More information

m 3 m m 84 m m m m m m m

m 3 m m 84 m m m m m m m 2011 8 8 155 JOURNAL OF RAILWAY ENGINEERING SOCIETY Aug 2011 NO. 8 Ser. 155 1006-2106 2011 08-0096 - 06 430063 1 2 3 U231 +. 4 A Design of Underground Space of Furong Square Station of Urban Rail Transit

More information

窑 374窑 国 际 生 殖 健 康 / 计 划 生 育 杂 志 2013 年 9 月 第 32 卷 第 5 期 JInt Reprod Health 蛐 Fam Plan,September 2013 熏 Vol. 32 熏 No 统 计 学 方 法 数 据 审 核 后 录 入 计

窑 374窑 国 际 生 殖 健 康 / 计 划 生 育 杂 志 2013 年 9 月 第 32 卷 第 5 期 JInt Reprod Health 蛐 Fam Plan,September 2013 熏 Vol. 32 熏 No 统 计 学 方 法 数 据 审 核 后 录 入 计 国 际 生 殖 健 康 / 计 划 生 育 杂 志 2013 年 9 月 第 32 卷 第 5 期 JInt Reprod Health 蛐 Fam Plan,September 2013 熏 Vol. 32 熏 No.5 窑 373窑 生 殖 健 康 与 辅 助 生 殖 技 术 论 著 * 陆 卫 群 朱 江 吟 摘 要 目 的 : 了 解 贵 州 省 少 数 民 族 性 生 活 现 状 并 分

More information

3 : , 2 247,, (, 2004), ( 1), , ; 1997, ( 2) 6 :,, , , % (

3 : , 2 247,, (, 2004), ( 1), , ; 1997, ( 2) 6 :,, , , % ( 26 3 Vol126, No13 2006 8 TROP ICAL GEOGRAPHY Aug., 2006, 3, ( /, 510275) : 20 90,,,,,,, 5, : ; ; ; : K928. 5; C922 : A : 1001-5221 (2006) 03-0248 - 06 20 90,,, ( ),,, [ 1-2 ], 90 [ 3-4 ],, [ 5-9 ], [ 10-11

More information

985 Journal of CUPL No.2 A Bimo nt hly Mar ch 2 0 1 0 ABSTRACTS Getting to the Root and Compromising China with the West: Rebuilding the Chinese Legal System 5 Yu Ronggen /Professor,

More information

59 [1] [2] [3] A A ( 4 ) A A [4]

59 [1] [2] [3] A A ( 4 ) A A [4] 5 1 5 (1): 58 70 2013 3 JOURNAL OF ENGINEERING STUDIES Mar., 2013 DOI: 10.3724/SP.J.1224.2013.00058 100190 20 50 70 2009 60 G301 A 1674-4969(2013)01-0058-13 20 50 1 : 2012 12 25; : 2013 01 18 : (Y250013015)

More information

A Study on the Relationships of the Co-construction Contract A Study on the Relationships of the Co-Construction Contract ( ) ABSTRACT Co-constructio in the real estate development, holds the quite

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 A Study on the Job Stress and the Ways of Coping for the Director of Elementary School in the Middle Area of Taiwan Abstract This study aims at probing the subject current status as related to stress and

More information

二 农 村 社 区 内 生 性 组 织 的 多 重 属 性 1998 2006 2003 2002 2002 2004 2010-13 -

二 农 村 社 区 内 生 性 组 织 的 多 重 属 性 1998 2006 2003 2002 2002 2004 2010-13 - 2012.6 农 村 社 区 内 生 性 组 织 * 及 其 内 卷 化 问 题 探 究 一 引 言 2006 * 11XJC840004 10JD008 2012-12 - 二 农 村 社 区 内 生 性 组 织 的 多 重 属 性 1998 2006 2003 2002 2002 2004 2010-13 - 1999 2010 2010 1998-14 - 2011 2002 三 农 村 社

More information