Analysis of Pile Foundations and Load Tests 桩型选择与试桩设计 Jiangbin Wu, Weidong Wang, Yuting Huang, Xiangjun Wang & Shubo Nie, East China Architectural Des

Size: px
Start display at page:

Download "Analysis of Pile Foundations and Load Tests 桩型选择与试桩设计 Jiangbin Wu, Weidong Wang, Yuting Huang, Xiangjun Wang & Shubo Nie, East China Architectural Des"

Transcription

1 ctbuh.org/papers Title: Authors: Subjects: Analysis of Pile Foundations and Load Tests Jiangbin Wu, East China Architectural Design and Research Weidong Wang, East China Architectural Design and Research Yuting Huang, East China Architectural Design and Research Xiangjun Wang, East China Architectural Design and Research Shubo Nie, East China Architectural Design and Research Building Case Study Geotechnic/Foundation Publication Date: 2014 Original Publication: Paper Type: Suzhou Zhongnan Center: In Detail 1. Book chapter/part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished Council on Tall Buildings and Urban Habitat / Jiangbin Wu; Weidong Wang; Yuting Huang; Xiangjun Wang; Shubo Nie

2 Analysis of Pile Foundations and Load Tests 桩型选择与试桩设计 Jiangbin Wu, Weidong Wang, Yuting Huang, Xiangjun Wang & Shubo Nie, East China Architectural Design & Research Institute Co., Ltd. 吴江斌, 王卫东, 黄昱挺, 王向军 & 聂书博, 华东建筑设计研究总院 This chapter describes the pile design and the static loading tests of the megatall Suzhou Zhongnan Center tower and its deep basement. Large-diameter and super-long bored piles were adopted to support the main tower. Full-scale loading tests of four piles embedded in two different bearing strata were carried out. For the two piles embedded in the 13-2 fine sand layer, the pile toe depth is 110 meters from grade level, and the maximum test load is 40,000 kn. For the other two piles embedded in 13-1 silty sand layer, the pile toe depth is 95 meters. Punching failures were observed after the test loads reached 26,000 kn and 32,000 kn, respectively. Tension piles were used to resist the buoyancy at the podium basement space area. The tension capacity was enhanced by post-shaft grouting. Testing results show that the ultimate tension capacities of three test piles with shaft grouting are 6,600 kn, 7,800 kn and 9,000 kn respectively. The design, construction and loading of test piles provided technical support information and guided the pile foundation design of this project. 主塔楼自重荷载大且风和地震荷载工况复杂, 纯地下室区抗浮突出, 桩基的设计和施工难度大 结合本工程土层性状及及近年来桩基技术发展, 对苏州中南中心大厦桩型选择进行了分析, 主塔楼承压桩采用了大直径超长灌注桩, 试桩桩径为 1100mm, 开展了两种持力层的对比试验共 4 组, 其中 A 型试桩 2 组, 以 13-2 粉细砂层为持力层, 桩端埋深约 110m;B 型试桩 2 组, 以 13-1 粉砂夹为持力层, 桩端埋深约为 95m 试桩采用桩端与桩侧联合后注浆工艺, 桩身混凝土强度达到 C55 试验结果表明,A 型桩在最大加载值 40000kN 作用下并未桩顶沉降并未出现陡降破坏, 而 B 型桩分别在 27000kN 和 32000kN 后出现明显的陡降破坏 纯地下室区域采用了桩侧后注浆抗拔桩, 试桩桩径为 800mm, 有效桩长约 35m, 采用 3 道桩侧后注浆工艺, 共进行 3 组载荷试验, 其极限承载力分别为 6600kN 7800kN 9000kN 为工程桩的设计和施工提供了指南, 为类似超高层建筑桩基选型提供了有益参考 Introduction Suzhou Zhongnan Center has a 5-level basement with an embedment depth of around 35 meters. The structural system of the tower consists of reinforced concrete core-tubes, steelreinforced concrete megacolumns, belt and outrigger trusses, and a composite floor system. The vertical gravity load of the tower is up to 9,300,000 kn, with 50% of the total load resisted by the core-tube. The load in each megacolumn is 360,000 kn and the load in corner column is about 240,000 kn. The projection area of the core-tube in horizontal plan is around 1,250 m 2 and the average sub-grade pressure is 3,270 kpa. The area of the tower raft is 6,460 m 2 and the average sub-grade pressure is 3,270 kpa. Under such a load, the bearing capacity and deformation control of the main tower pile foundation are vitally important. In addition, due to the embedment depth of basement and high phreatic water levels, the foundation endures gigantic buoyancy. Handling buoyancy at the podium basement area is a primary challenge. Considering the pile foundation development in recent years and the soil properties of the site, engineers studied the bearing pile types in the tower area and the tension piles in the podium basement area. Afull-scale field test including the bearing capacity and bearing behavior of test piles was conducted. The test provided reference for the design and construction of engineering piles for the Zhongnan Tower and other similar high-rise building pile foundations. Site Soil Conditions Suzhou Zhongnan Center is located in the Suzhou Industrial CBD. The construction site is in a river delta and a lacustrine deposit plain landform. The grade level is flat and the elevation is around 4.0m (above sea level). From ground surface to 218 meters below grade, soils pertain to quaternary early Pleistocene Q1 and later sedimentary layers, consisting of saturate clay, silt and sand. The soils can be divided into 13 main layers according to sediment age and physical and mechanical properties, shown in Table 4.5. 工程概况 苏州中南中心设置 5 层地下室, 基础埋深约 32m 主塔楼结构体系包含 : 钢筋混凝土核心筒 钢骨混凝土巨柱 环带桁架和组合楼面体系 其中塔楼平面由纵横各五道剪力墙 八个巨柱和四个角柱组成, 如图 1 所示 巨柱, 核心筒, 环带桁架同时为抗侧力体系 对于超高层建筑选用重量相对较轻的组合楼面体系, 该体系由砼板, 压型钢板和钢梁组成 中南中心结构复杂 荷载大, 结构自重约 930 万 kn, 核心筒约占 50%, 单个巨柱荷载约 36 万 kn, 角柱荷载约 24 万 kn 核心筒投影面积约 1250m 2, 平均基底压力达 3270kPa 塔楼厚板面积约 6460m2, 平均基底压力达 1440kPa 如此大的荷载, 对主塔楼基础的承载力和变形控制都提出了较高的要求 此外, 基础埋置深度大 潜水水位高, 基础承受巨大的水浮力, 纯地下室区域抗浮问题突出 结合本工程土层性状及近年来桩基技术发展, 对苏州中南中心大厦塔楼区域承压桩桩型和纯地下室区域抗拔桩桩型选择进行了分析, 开展了现场试桩承载力静载试验, 为桩型的确定 承载力取值, 及承载与变形特性的认识提供了依据 指导了工程桩的设计和施工, 为类似超高层建筑桩基选型提供了有益参考 112 Geotechnical and Sub-Surface Engineering

3 Soil layer name Thickness γ/ c Φ fs fp The soils from grade to a depth of 90 meters below grade are mainly composed of silty clay and silt interbedded with silty clay. Due to the high clay content, those layers are not adequate to be the pile foundation-bearing stratum of the main tower. The dense (13-1) silty sand layer and (13-2) fine sand layers are good bearing strata. Selection of Pile Types Steel-pipe piles have typically been used for such supertall buildings as the 420-meter Jin Mao Tower and the 492-meter high Shanghai World Financial Center in the 1990s. Due to the limitation of construction equipment ability, it is difficult for steel pipe piles to penetrate through the deep and thick sand layers to reach soils of high bearing capacity. Therefore, the ultimate bearing capacity of a single pile used in those two high buildings is not more than 10,000 kn. Moreover, the cost of steel piles is very high. To attain the same capacity as bored piles, the cost of a steel-pipe pile is about 50% more expensive. Compared with the steel-pipe piles, bored piles have the advantages of controlling soil compaction and reducing construction noise. Since 2000, the development and improvement of the design and engineering methods of bored piles with post-grouting has meant that the bored pile has become the most popular pile type used for the supertall buildings. The total load of the Zhongnan Center core required the bearing capacity of a single pile to be more than 15,000 kn. In the history of previous high-rise construction in Suzhou and other areas with similar soil conditions, the diameter of piles had been no more than 1,100 mm and the length had been no more than 90 meters from grade level. Further, the allowable capacity had been no more than 12,000 kn. Although, the large-diameter and super-long bored piles with post-grouting were clearly the necessary choice, the choice of the bearing layer for the bored pile was still difficult. Based on the geological conditions of the site, layer 13-1 and layer 13-2 were possible candidates to be the bearing layer 地质概况 苏州中南中心地位于苏州工业园区金鸡湖湖西 CBD 商圈核心区, 地貌类型为三角洲 湖积平原, 场地内地势较平坦, 场地地面高程约为 4.0m 在 218.7m~250m 范围内为全风化 ~ 强风化基岩,218.7m 深度以上范围的地基土均为第四系早更新世 Q1 及其后期的沉积土层, 主要由粘性土 粉土 砂土组成 根据土层的沉积年代与物理力学性质, 主要分为 13 个层次 场地土层及参数如表 1 所示, 桩基相关土层分布及特点如表 4.5 所示 埋深 90m 范围内为第 4~12 层土, 主要为和粉砂夹, 其粘粒含量高, 不适宜作为本项目主塔楼桩基持力层 其下的 13-1 粉砂层和 13-2 粉砂层皆是较理想的主塔楼桩基持力层 桩型选择 土层名称 (1) fill 填充层 (4) silty clay (5) Sandy silt 砂质粘土 (6) silty clay (8) 1 silty clay (8) 2 silty clay interbeded with silt 与淤泥夹层 (9) Silty sand 粉质砂土 (10) 1 silty clay (10) 2 silty clay (11) Silt interbeded with silty clay 淤泥与夹层 (12) 1 clay 粘土 (12) 2 silty clay (13) 1 Silty sand (13) Interlayersilty clay (13) 2 fine sand 细砂 Table 4.5. Soil properties of the site 表 4.5. 场地地质条件 厚度 /m kn/m 3 /kpa / /kpa /kpa 塔楼承压桩桩型选择上世纪末在上海建设的 420.5m 高层建筑上海金茂大厦和 492m 上海环球金融中心采用了钢管桩 2000 年以来随着施工工艺的成熟, 灌注桩成为超高层建筑的主要桩型, 通常采用后注浆工艺提高承载力并减小沉降 相对钢管桩, 灌注桩回避了噪音 挤土效应等环境影响问题, 且施工工效高, 经济性好 当前国内在建的 600m 超高层建筑皆采用了大直径钻孔灌注桩 苏州已建成的最高建筑苏州东方之门为 71 层, 建筑高 278m, 采用了 1000mm 直径的灌注桩, 以 13-1 粉砂层为持力层, 桩端埋深约 95m, 最大加载至 19300kN 正在建设的苏州国金中心为 92 层, 建筑高约 450m, 采用了 1000mm 直径的灌注 岩土与地下工程 113

4 Double steel sleeve Fill layer, loose silty clayplastic~soft-plastic medium Sandy siltslightly dense,medium Double steel sleeve silty claysoft-plastic medium silty clayplastic medium silty sandslightly dense~dense medium silty clayplastic~soft-plastic medium silty sand interbeded with silty clayslightly dense~densemedium silty clayhard-plastic medium silty sand interbeded with silty clayplastic~hard-plasticmedium fine sanddensemedium~middle Figure Profile of soil and compression pile 图 4.14 土层及试桩剖面图 Basement excavation Grouting section for the bored piles. With a buried depth of about 90 meters, layer 13-1 consists of dense silty sand, and the Pc value of a cone penetration test is about 16 MPa; whereas the standard penetration test value is about 68. Layer 13-1 is a good supporting layer for the pile foundation. Underneath the 13-1 layer is a silty clay layer, whose cone penetration test Pc value is only about 4 MPa, where the standard penetration test value is about 25. The existence of a soft layer brings uncertainty to the choice of 13-1 as a supporting layer for the tower pile foundation. When the layer of 13-1 was chosen to be the supporting layer, according to local experience, the bearing capacity of a single pile with normal diameter would be unlikely to reach 15,000kN. Furthermore, the existing soft substratum will have negative influence on the group piles settlement. The 13-2 layer consists of dense fine sand and the Pc value of its cone penetration test is about 24 MPa. Situated at 105 meters below the grade and with a thickness of about 40 meters, the 13-2 layer is a better bearing layer than the 13-1layer. The disadvantage is that the bored pile would have to be prohibitively long, with a drilling depth of 110 meters from grade level. Based on the above analysis, layers 13-1 and 13-2 are two candidates for pile bearing layers. The pile-loading comparison tests were developed to provide valuable results to help engineer the selection of the supporting layer. Pile Selection of the Podium Region The five-story tall podium has a 30-meter-deep basement. The water table is about 0.5 meters below the ground surface, which necessitates anti-buoyancy structural interventions. It is 桩, 以 13-1 粉细砂层为持力层, 桩端埋深约 90m, 试桩最大加载至 24000kN 本工程主塔楼荷载大, 预估单桩承载力达 15000kN, 根据国内软土地区在建的 600m 超高层建筑并结合苏州本地超高层建筑的经验, 必将采用大直径超长的后注浆灌注桩, 预估桩径不小于 1100mm, 桩端持力层的选择是一个难点 第 13-2 层细砂层分布稳定, 层厚约 40m, 呈密实状态, 静力触探 qc 约 24MPa, 标贯大于 50 击, 是理想的持力层, 但该层层顶埋深达到约 105m 第 13-1 层粉细砂层层顶埋深约 90m, 呈密实状态, 静力触探 qc 约 16MPa, 也是较好的持力层 但该层下卧有可塑至硬塑状的夹层, 静力触探 qc 约 4.0MPa 因此, 桩端进入 13-1 层粉细砂层不能太深, 需离下部软弱夹层不小于 4 倍桩径 由于本工程基础埋深约 35m, 以 13-1 层为持力层时, 桩端埋深约 95m, 实际有效桩长为 60m, 根据实步估算及前述两个以该层为持力层超高层建筑桩基静载试验, 其单桩承载力较难满足 15000kN 特征值的要求 此外,13-1 层以下的夹层也会对群桩沉降带来不利影响 为了进一步探讨 13-1 层为塔楼桩基持力层的可行性, 后续开展了以 13-2 层和 13-1 层分别为持力层的桩基静载试验 纯地下室抗拔桩桩型选择本工程纯地下室区域基础埋置深度约 30m, 苏州地区抗浮水位可取地面以下 0.5m, 因此基底承受巨大的水浮力, 远大于纯地下区域结构自重 据初步估算, 一个 8.4m 见方柱网承受的水浮力达 10000kN 以上 按 4 桩布置方式初步估算, 单桩抗拔承载力特征值约 2500kN 常规的等截面抗拔桩仅靠桩周侧摩阻力提供抗拔力, 且灌注桩成孔施工广泛采用泥浆护壁工艺, 往往形成桩身泥皮降低侧阻及抗拔承载力 本项目纯地下室面积大 埋置深, 抗拔桩的工程量与投资较大, 如何对现有抗拔桩型进行改进, 提高承载力并降低造价是业主迫切关心的问题 扩底抗拔桩通过改变桩端截面提高承载力, 桩侧后注浆抗拔桩则通过注浆改善桩土接触面特性提高承载力, 两者皆以较小的混凝土或水泥浆材料增加获取显著的承载力提高, 已成为桩基础的一个发展方向 114 Geotechnical and Sub-Surface Engineering

5 estimated that uplift force due to buoyancy could reach 10,000 kn for the typical column bay of 8.4 m x 8.4 m. The tension force in single piles is about 2,500 kn when four tension piles are placed in a typical bay. It is known that the tension capacity of a normal bored pile is provided by the skin friction of the pile. Compared with driven prefabricated piles, the tension capacity of bored piles is smaller because of the slurry protection drilling method, in which the mud paste weakens the skin friction. As there will be a large quantity of tension piles, the owner and engineers had an extensive discussion about how to improve the tension pile capacity and reduce the construction cost. The pedestal pile changes the cross-section of the pile tip to increase the tension capacity. The pile with shaft-grouting can increase the tension capacity by changing the interface property between the pile and the soil. Engineering practice has shown that both types of tension piles can increase the uplift bearing capacity significantly with limited construction cost increase. For example, the tension piles with shaft grouting were used in the 606-meter Wuhan Greenland Center. The diameter of the side-grouting uplift piles on that project was 700 mm and the effective pile length was 22 meters. It is estimated that without grouting, the pile length would have to have been more than 29 meters. The savings from pile-length reduction are significant. At the Suzhou Zhongnan Center, the buried depth of the basement is about 30 meters. Experience has shown that, when the pile bearing layer is deep, the pedestal tension pile is not always the best choice, because it is hard to control. The formation of the expanded head is imprecise and the construction efficiency is low. Comparatively, when the pile length is long, it is a better choice to use the tension pile with grouting, because it is more feasible to control construction quality and cost. Consequently, tension piles with side grouting were the better choice for this project. Design of Test Piles Test Piles of Tower Building According to the calculated building loads of the Suzhou Zhongnan Center tower, the required bearing capacity of a single pile is more than 15,000 kn. Whether the supporting layer is 13-1 or 13-2, the bored pile would still have to be very long. Constructors in Suzhou have little experience of bored piles with such high capacities. Therefore, a pile loading test should be done first to test the feasibility. Pile tests may reveal some technical problems, which include the borehole quality. Pile tests also reveal the construction efficiencies of large-diameter and super-long bored piles in the deep and thick sand layers, the quality of high-strength concrete constructed underwater, the technique of toe-shaft post grouting, and the bearing capacities and settlement properties under loading. The diameter of the test piles and reaction piles is 1,100mm. Full-scale loading tests of four piles embedded in two different bearing strata were carried out. Type A piles, labeled SYZA1 and SYZA2, are embedded in the 13-2 fine-sand layer. The pile toe depth is 110 meters. Type B piles labeled SYZB1 and SYZB2 are embedded in the 13-1 silty-sand layer. The pile toe depth is 95 meters. All four test piles are post-grouted, bored piles. The predicted maximum testing load is 40,000 kn. Grade C55 concrete was used first for the test piles to ensure the pile body would not be crushed under such a large testing load. The arrangement of the test piles and reaction pilesis shown in Figure Sections of the soil profile and the test pile are shown in Figure Grade P42.5 fresh Portland cement was used for post-grouting. A total of 3,500 kg of cement was used for toe post-grouting of single piles. The water cement ratio is There were 正在建设的华中第一高楼武汉绿地中心纯地下室区域采用了桩径为 700mm 的桩侧后注浆抗拔桩, 有效桩长为 22m, 比常规抗拔桩减少 7m, 效益明显 据初步估算, 在相同 800mm 桩径下, 常规等截面桩有效桩长约 45m, 而采用扩底抗拔桩和等截面抗拔桩可将桩长减小 10m, 其经济效益明显 由于本工程基础埋置深度达 30m, 采用扩底抗拔桩的桩端埋深约 65m, 扩底施工难度大, 且调换扩底钻头的工效也较低 因此, 本工程采用桩侧后注浆抗拔桩, 由于桩径较大 桩长较长, 其施工可行性和承载力的提高比例都更有保证 试桩设计 承压桩试桩根据苏州中南中心荷载的要求, 单桩极限承载力不小于 30000kN, 必将选择桩端埋深 95~110m 的大直径超长灌注桩 如此高承载力的大直径超长桩在苏州地区没有先例, 需要通过桩型试验论证成桩的可行性和质量的可靠性 包括深厚砂层中大直径超长钻孔桩的成孔质量与工效, 特别是垂直度 沉渣的控制 ; 桩端桩侧联合后注浆工艺参数与可靠性 ; 高强度等级的混凝土在水下浇筑后是否能满足要求 ; 桩基极限承载力取值 以上述主要技术问题为出发点, 从试桩设计 施工 检测等方面进行了精细的桩型试验设计, 解决工程关心的问题 苏州中南中心主塔楼承压桩的试桩及锚桩皆采用直径为 1100mm 的灌注桩 试桩试验分为 4 组, 每组包括 1 根承压试桩和 4 根锚桩 为了减少工程量, 试锚桩的布置如图 4.15 所示, 共 4 根试桩 9 根锚桩 为了进行不同持力层的比较,A 型试桩 2 组, 以 13-2 粉细砂层为持力层, 桩端埋深约 110m ;B 型试桩桩 2 组, 以 13-1 粉砂夹为持力层, 桩端埋深约为 95m 为了得到极限承载力, 本次试桩最大加载能力要求达 40000kN, 为了保证试桩桩身强度不破坏, 首次将试桩桩身混凝土等级设计为 C55, 同时为工程桩采用高标号混凝土提供经验, 锚桩的桩身混凝土设计强度等级为 C35 图 4.15 试桩与锚桩的平面安排 图 4.14 土壤与试桩剖面 岩土与地下工程 115

6 three grouting pipes fixed on the pile reinforcement cage for post-toe grouting. There was one grouting section about 30 meters above pile toe for shaft-side post-grouting. A total of 1,500 kg of cement was used for this shaft-side post-grouting. The water-to-cement ratio used for shaftside post-grouting was Post grouting should be operated after the strength of the pile concrete reaches 70% of the design strength. Pile shaft grouting should be operated earlier than toe post-grouting to prevent the cement slurry from escalating along the shaft and weakening the effect of toe grouting. In order to directly measure the bearing capacity of the pile within the effective length, double steel sleeves were used to separate the pile shaft from the soil above the final excavation elevation of the foundation pit. As shown in Figure 4.14, the diameters of external and internal sleeves were 1,310 mm and 1,200 mm, respectively. The thickness of both the external and internal sleeves was 14 mm. Steel ring ribs were installed every 5 meters along the external surface of the internal sleeve. The net distance between the ring ribs and the internal surface of the external sleeve was about 9 mm. It was necessary to seal the bottom between the external and internal sleeves to keep the slurry out. Test Piles at Podium Basement Area The diameter of the podium tensile pile was 800 mm. There were three test piles and four reaction piles in the loading test. The pile length is about 60 meters, and Grade C35 concrete was used for the test piles. All three test piles were shaft-grouted bored piles. There were three grouting locations along the pile shaft, and the lowest grouting location was 3 meters above the pile tip. The other two grouting locations were spaced at 12 meters. A total of 600 kg of cement was used for each grouting location. The interface between pile and soil is the channel of shaft grouting. Because the pressure of the upper part of the shaft is less than the lower part, the cement slurry will always escalate along the shaft upwards. In order to restrict the extent of 试桩皆采用桩端注浆结合桩侧注浆的联合注浆工艺 桩端注浆采用 P42.5 级新鲜普通硅酸盐水泥配制的浆液, 水泥用量为 3500kg, 水灰比为 0.5~0.6 桩身对称设置 3 根注浆管, 下端与单向阀式注浆器相连, 桩端注浆器应插入孔底以下 0.2~0.5m 本工程有效桩长较长, 根据规范和类似工程经验, 可设置 2~3 道桩侧后注浆以提高承载力 但从便于施工和节约造价的角度, 试桩仅设置一道桩侧注浆断面, 位于桩端以上约 30m 处, 桩侧压浆水泥用量加大至 1500kg 桩身混凝土达到设计强度的 70% 后开始注浆, 先进行桩侧注浆, 再进行桩端注浆, 桩端注浆分二次进行, 第一次注浆水泥用量为 2t, 第二次注浆水泥用量 1.5t 第二次注浆在第一次注浆完成 1~2 小时后进行 试桩采用双套管隔约 35m 开挖段桩身与土体的接触, 以直接测试有效桩长范围内的桩基承载力 如图 4.14 所示, 外套管内径为 1310mm, 内套管内径 1200mm, 壁厚皆为 14mm 内外钢套管之间每隔 5m 设置环形的防失稳支撑肋, 支撑肋与内套管焊接, 支撑肋与外套管内壁的间距为 9mm 为防止混凝土和桩侧注浆的浆液沿内 外套管之间空隙上泛, 需对外套管管底进行封堵, 采取有效措施保证确实隔离 抗拔桩试桩设计抗拔桩试桩皆采用直径为 800mm 的灌注桩, 桩端埋深约 65m, 桩身混凝土设计强度等级为 C35 共设置 3 组试桩, 包括 3 根抗拔试桩和 4 根反力桩 抗拔试桩为桩侧后注浆抗拔桩, 每根试桩设置 3 道桩侧后注浆断面, 最下一道注浆断面离桩端约 3m, 其上每隔 12m 设置一道注浆断面 每道注浆断面的水泥用量为 0.6 吨 桩侧注浆由上而下进行, 桩侧每个断面注浆间隔时间不小于 1 小时 由于纯地下室区域埋置深度达 30m, 而工程桩有效桩长约 30m, 开挖段桩侧摩阻力对整根桩承载力的影响巨大 为了便加精确地通过试桩评价工程桩的承载力, 也采用了长达 30m 的双套管隔离开挖面以上的桩侧摩阻力 外套管内径为 1000mm, 内套管内径 900mm, 壁厚皆为 10mm Figure Arrangement of test piles and reaction piles 图 试锚桩平面布置图 116 Geotechnical and Sub-Surface Engineering

7 Fill layer, loose silty clayplastic~soft-plastic medium Sandy siltslightly dense,medium Double steel sleeve silty claysoft-plastic medium rising cement slurry, the grouting sequence is top-down, because the condensation of upper grouting may prevent the escalation of lower grouting. As with the tower pile tests, double steel sleeves were used in podium pile tests to separate the pile shaft from soil. Above the final excavation elevation was the foundation pit. The external and internal sleeves were 1,000 mm and 900 mm in diameter respectively. The thickness of both the external and internal sleeves was 10 mm. Results and Analysis Construction Implementation The test piles and reaction piles were constructed by a GPS-20 boring machine. The boreholes were formed by a normalcirculation rotary drilling method. The methods to scour the boreholes were pump suction and reverse-circulation washing. During the piles construction, the pile boreholes were supported using high-quality bentonite slurry. In order to maintain the bentonite support capabilities, a decontamination plant was used to filter the silty sand. The sand ratio of the slurry should be lower than 4%. This is beneficial for controlling the whole diameter and feculence. Three-ring and double-waist hoop bits were used to improve the quality of the boreholes. The average construction time to complete one borehole was 70 hours. The average time to place one reinforcement cage of a test pile into the borehole was eight hours. The average time to fill the borehole with concrete was 4.0 hours. The total time to construct one test pile was five days. Concrete consumption of one pile was 70 m 3. The minimum diameters of the piles lay between 1,100 mm and 1,108 mm. The maximum diameters of the piles lay between 1,259 mm and 1,503 mm. The average vertical deviation of the piles was 1/300. The feculence thickness at the bottom of the boreholes lay between 6.0 cm and 10.0 cm with an average of 7.33 cm. The filling coefficients (the ratio of the actual concrete volume to theoretical volume) lay silty clayplastic medium silty sandslightly dense~densemedium silty clayplastic~soft-plastic medium silty sand interbeded with silty clayslightly dense~densemedium Figure 4.16 Profile of soil and tension pile 图 抗拔桩试桩剖面图 静载荷试验结果 施工效果主塔楼承压桩试锚桩施工选用 GPS-20 型工程钻机, 正循环成孔 气举反循环清孔的成孔工艺, 护壁泥浆全部采用优质纳基膨润土人工造浆, 并采用泥浆净化装置过滤泥浆中的粉细砂, 将含砂率控制在 4% 以内, 保证泥浆的持壁性能, 有利于孔径和沉渣的控制 为了保证成孔的稳定性提高垂直度, 钻头采用三翼双腰箍钻头 单桩的平均成孔时间约 70 小时, 锚桩钢筋笼下笼平均时间 8 小时, 试桩钢筋笼下笼平均时间 12 小时, 平均浇灌时间 4.0 小时 一根桩的施工时间总计约 120 小时 桩身最小直径为 1100~1108 mm, 最大直径为 1259~1503 mm; 桩身垂直度平均为 1/300; 沉渣厚度为 6.0~10.0 cm, 平均为 7.33cm; 充盈系数为 1.02~1.05, 平均为 1.03 抗拔桩采用 GPS-15 型钻机, 正循环成孔和清孔的成孔工艺 单桩的平均成孔时间约 50 小时, 成桩时间总计约 80 小时 桩身最小直径为 800 mm, 最大直径为 901~1038 mm; 桩身垂直度平均为 1/400; 充盈系数为 1.07~1.12, 平均为 1.09 承压桩载荷试验结果图 4.17 为各试桩桩顶 工程桩顶 桩中及桩底处的 Q s 曲线 其中, 试桩 SYZA1 SYZA2 的 Q s 曲线为缓变形, 在最大加载值 4000kN 下,SYZA1 累计沉降量 83.17mm,SYZA-2 累计沉降量 mm, 桩端变形分别为 8.4mm 和 11.2mm, 荷载位移曲线均为缓变形, 没有出现陡降破坏 桩顶沉降主要为桩身压缩, 桩身压缩量占桩顶沉降的 80% 以上, 卸载后回弹率皆达 65% 以上 根据规范, 当 Q~S 曲线呈缓变形时, 取桩顶总沉降 S=40mm 所对应的荷载值为极限承载力, 当桩长大于 40m 时应考虑桩身的弹性压缩 对于 SYZA1 来说, 在最大加载值 40000kN 作用下, 试桩顶变形为 83.17mm, 但工程桩顶处的变形为 46.64mm, 虽然大于 40mm 但其对应的有效桩长达到 75m, 桩身压缩约 38mm, 因此, 可将 SYZA1 极限承载力判定为 岩土与地下工程 117

8 Pile number 桩号 Pile toe burying depth 桩端埋深 Effective Pile Length 有效桩长 Maximum load 最大荷载 /kn Pile head movement 桩头弯矩 /mm Pile toe movement 桩端弯矩 /mm resilience 弹性 Resilience ratio 弹性比 Ultimate load 极限荷载 /kn SYZA1 SYZA2 SYZB , % >40, , % 36, , % 32,000 SYZB , % 27,000 Table 4.6. Settlement and resilience of compression piles under the maximum load 表 4.6. 承压桩在最大加载值下的沉降和回弹 between 1.02 and 1.05 with an average of 1.03, which means the drilling hole quality was very good and there was no large-diameter expansion or shrinkage. The tension piles were constructed by a GPS-15 boring machine. The boreholes were formed by the normal-circulation rotary drilling method. The methods to scour the boreholes were pump suction and reverse-circulation washing. The average time was 50 hours to form one borehole. The minimum diameter of the piles was 800 mm. The maximum diameters of the piles lay between 901 mm and 1,038 mm. The average vertical deviation of the piles is 1/400. The filling coefficients lay between 1.07 and 1.12, with an average of Loading Test Results of Tower Compression Bearing Piles Load-settlement curves of the four test piles are shown in Figure With the increase of the test load, the settlements of piles SYZA1 and SYZA2 grew slowly and firmly. Under the load of 40,000 kn on the top of the piles, the pile top of SYZA1 settled mm and the pile bottom settled 8.4 mm. The SYZA2 pile top settled mm and the pile bottom settled 11.2 mm. In each stage of loading, the settlement of the pile top changed smoothly without punching failure. Punching failure occurs when the settlement under the current loading stage is five times that of settlement under the previous loading stage. Both SYZA1 and the SYZA2 did not fail. The pile self-deformation under compression is the chief component of pile-top settlement, and it accounted for more than 80% of total pile-top settlement in this experiment. After unloading the piles, the rebound ratios of both piles were over 65%. According to the specifications, when the Load-Settlement Curve is slowly changing, the bearing capacity of the pile is equal to the test load when the pile-top settlement reaches 40 mm. The elastic compression deformation of piles should be considered when the length of the pile is over 40 meters. Although the settlement of the actual pile top of SYZA1 is under a maximum load of 40,000 kn, it is mm, greater than 40 mm or the effective length of the pile. SYZA1 is 75 meters and pile compression is about 38 mm. Therefore, the ultimate bearing capacity of pile SYZA1 is determined as 40,000 kn. The actual settlement of the pile top of SYZA2, under a maximum load of 40,000 kn, is 63.4 mm, greater than SYZA1. The ultimate bearing capacity of pile SYZA1 was determined to be 36,000 kn kN SYZA2 大最大加载值 40000kN 作用下, 试桩顶变形为 mm, 工程桩顶处的变形为 63.4mm, 明显大于 SYZA1 SYZA2 在 36000kN 作用下试桩顶变形为 85.79mm, 与 SYZA1 相近, 取其极限承载力为 36000kN 如图 4.17(a) (b) 所示, 试桩 SYZB1 SYZB2 在桩顶荷载增加至 30000kN 和 34000kN 时, 桩顶位移急剧增大呈陡降破坏, 且工程桩桩顶 桩中 桩端三个位置沉降量接近, 表明桩体发生刺入破坏, 试桩 SYZB1 刺入变形量约为 45mm, 试桩 SYZB2 刺入变形量约为 78mm, 卸载后回弹率仅为 30%, 表明桩周及桩端土体承载力达到极限 取陡降起始点对应的荷载为极限承载力, 试桩 SYZB1 SYZB2 的极限承载力分别为 27000kN,32000kN 静载试验结果表明,13-2 粉细砂层为持力层的 A 型桩在最大加载 40000kN 没有发生破坏, 按沉降控制其极限承载力不小于 36000kN 以 13-1 粉砂夹为持力层的 B 型桩则皆加载至破坏, 其极限承载力可取 27000kN 可见 A 型桩由于桩端持力层比 B 型桩好, 且有效桩长增加 10m, 其承载力明显更高, 是主塔楼工程桩的主要桩型 在工程桩设计时, 可根据群桩计算结果及变刚度调平设计的理念, 在巨柱外围区域荷载较小的桩基采用 B 型桩 Pile number 桩号 SBZ1 SBZ2 SBZ3 Pile toe burying depth 桩端埋深 Effective Pile Length 有效桩长 Maximum load 最大荷载 /kn Pile head movement 桩头弯矩 /mm Pile toe movement 桩端弯矩 /mm resilience 弹性 Resilience ratio 弹性比 Ultimate load 极限荷载 /kn 30 9, >9, , , , , Displacement corrisponding to Ultimate load 极限荷载对应位移 /mm Table 4.7. Settlement and resilience of tension piles under the maximum load 表 4.7 抗拔桩在最大加载值下的上拔和回弹 118 Geotechnical and Sub-Surface Engineering

9 Figure Q-S curves of compression piles 图 承压桩静载 Q~S 曲线 As shown in Figures 4.17a and b, the load-settlement curves are almost linear before the piles are loaded to reach failure. The settlements of pile SYZB1 and SYZB2 increased rapidly after the failure loads were reached. The settlement values at three locations (the pile top, the middle and the toe) are almost the same. This indicates that punching failures occurred. The punching settlements of pile SYZB1 and SYZB2 are 45 mm and 78 mm, respectively. The rebound ratios are about 30%. The ultimate bearing capacity of piles SYZB1 and SYZB2 were determined as 27,000 kn and 32,000 kn respectively. Test results show that pile A, embedded in layer 13-2, did not fail under the maximum 40,000 kn load and that the ultimate bearing capacity was not less than 36,000 kn, according to deformation control. Pile B, embedded in layer 13-1, failed in the process of loading and the ultimate bearing capacity was 27,000 kn. Because pile A is supported on a better bearing stratum and its effective length is 10 meters longer than pile B, the bearing capacity of pile A is better. Pile A was therefore chosen as the main pile to support the tower. Pile B may be placed in the area where the pile load is relatively small according to foundation analysis at the detailed design stage. Loading Test Results of Tension Piles With the increase of loading, the settlement of pile SBZ1 grows slowly. Under the load of 9,000 kn, the upward movement of SBZ1 is mm, and the the ultimate tension capacity is determined as 9,000 kn. When the load on SBZ2 and SBZ3 grows to 8,400 kn and 7,200 kn, respectively, the upward movements increase sharply and exceed 100 mm. Rebound ratios are 抗拔桩载荷试验结果试桩 SBZ-1 的 Q ~S 曲线为缓变型, 在加载至 9000kN 作用时, 桩顶上拔位移为 42.46mm, 抗拔极限承载力可取为 9000kN 试桩 SBZ-2 SBZ-3 分别加载至 8400kN 7200kN 时, 桩顶上拔量急剧增大, 累计变形量皆超过 100mm, 卸载后回弹率仅为 20% 取 Q ~S 曲线陡降起始点对应的荷载为极限承载力, 试桩 SBZ1 SBZ2 的极限承载力分别为 7800kN 和 6600kN 静载试验结果表明, 桩侧后注浆抗拔桩极限承载力皆能达到 5000kN 预估值的要求 在工程桩设计时, 桩长有进一步优化的空间, 但同时也应看到 3 根试桩承载力的离散性较大, 工程桩施工应重视对质量的控制 岩土与地下工程 119

10 about 20%. The ultimate tension capacities of pile SBZ2 and SBZ3 were determined as 7,800 kn and 6,600 kn. The test results show that the ultimate tension capacity of all bored piles with shaft grouting can meet the requirements of 5,000 kn. The length of a pile can be further optimized at the detailed pile-design stage. The test results of three piles vary greatly. Great attention should be paid to the quality control of shaft grouting during the construction. Conclusion Suzhou Zhongnan Center is one of the tallest buildings under construction in China. The bearing capacity and deformation control of pile foundations are strict because of the large building loads. The buoyancy problem is serious because of the dilemma of having a deep basement and a high water table. It is a difficult task to find the pile foundation solution that is suitable for a site with soft soils highlighted by clay and silty clay. Based on the geological conditions of the site and the local experiences, the large-diameter and superlong bored piles with toe-shaft grouting were used for the tower. The shaft-grouting uplift piles were used in the podium of the underground space region. Static load tests of the piles with diameters of 1,100 mm showed that when the pile with 75 meters effective length is supported on the 13-2 fine sand layer, the ultimate bearing capacity is more than 36,000 kn. When the pile with 65 meters effective length is founded in the 13-1 silty sand layer, the ultimate bearing capacity is about 27,000 kn. The bearing capacity of the pile Figure Q-S curves of tension piles 图 抗拔桩静载 Q~S 曲线 120 Geotechnical and Sub-Surface Engineering

11 is greatly impacted by its supporting soil layer. Further, it is necessary to consider the requirements of the force and deformation control for the selection of the pile bearing stratum. The ultimate bearing capacity of the tension pile can be enhanced significantly by shaft grouting. While the tension pile with shaft grouting is 800 mm in diameter and 30 meters in effective length, the ultimate bearing capacity is more than 6,600 kn. Engineers verified the feasibility of pile construction and acquired the bearing capacity through pile tests. The results provided valuable information for the detailed design and construction of the pile foundation of this project, and can serve as guidelines for other similar high-rise buildings. 结论 苏州中南中心大厦是国内在建的最高建筑之一, 主塔楼荷载大, 桩基础的承载力和变形控制要求高, 基础埋置深度大, 纯地下室抗浮问题突出 场地为深厚的粘土 粉土和砂性土, 桩基的选型与设计难度大 结合本工程土层性状及近年来桩基技术发展, 对苏州中南中心大厦桩型选择进行了分析, 主塔楼采用桩端与桩侧联合后注浆的大直径超长灌注桩, 地下室采用桩侧后注浆抗拔桩 开展了现场单桩承载力静载试验, 试验结果表明, 对于直径为 1100mm 的灌注桩, 当以 13-2 粉细砂层为持力层时, 极限承载力不小于 36000kN; 当以 13-1 粉砂夹为持力层时, 其极限承载力为 27000kN 持力层和桩长对单桩承载力的影响明显, 工程桩设计需根据不同受荷及变形控制要求, 选择不同的持力层 桩侧后注浆可大幅提高单桩抗拔承载力, 对于 800mm 直径, 有效桩长为 30m 的桩侧后注浆抗拔桩, 其极限承载力大于 6600kN 桩型试验验证了施工可行性 桩基承载力及桩身质量, 同时确定了一套指导工程桩大面积施工的标准化指南, 为苏州中心工程桩的设计与施工打下了坚实的基础, 为类似超高层建筑桩基设计提供了有益参考 References ( 参考书目 ): JGJ Technical Code For Testing of Building Foundation Piles. Beijing: China Architecture and Building Press, (in Chinese) Shanghai Jianke Technical Assessment of Construction Co., Ltd. (2013) Bored Piles Test Report of Pile Type Test Project for Suzhou Zhongnan Center Shanghai: Shanghai Jianke Technical Assessment of Construction Co., Ltd. (in Chinese) Wang, W., Wu, J., Li J., et al. (2007) Study on the Pile Bottom Bearing Capacity Character of Post-Grouting Cast-In Pile, China Civil Engineering Journal, vol. 40, no. S1, pp (in Chinese) 岩土与地下工程 121

01-0982.doc

01-0982.doc 第 32 卷 第 7 期 岩 土 工 程 学 报 Vol.32 No.7 2010 年 7 月 Chinese Journal of Geotechnical Engineering July 2010 沿 海 碎 石 回 填 地 基 上 高 能 级 强 夯 系 列 试 验 对 比 研 究 年 廷 凯 1,2, 水 伟 厚 3, 李 鸿 江 4, 杨 庆 1,2, 王 玉 立 (1. 大 连 理 工

More information

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土 第 34 卷 增 刊 岩 土 工 程 学 报 Vol.34 Supp. 202 年. 月 Chinese Journal of Geotechnical Engineering Nov. 202 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 谢 小 林 2 2, 翟 杰 群, 张 羽, 杨 科, 郭 晓 航, 贾 坚 (. 同 济 大 学 建 筑 设 计 研 究 院 (

More information

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5 2011 6 6 153 JOURNAL OF RAILWAY ENGINEERING SOCIETY Jun 2011 NO. 6 Ser. 153 1006-2106 2011 06-0014 - 07 300142 ABAQUS 4. 287 mm 6. 651 mm U455. 43 A Analysis of Impact of Shield Tunneling on Displacement

More information

%

% 38 1 2014 1 Vol. 38No. 1 January 2014 51 Population Research 2010 2010 2010 65 100028 Changing Lineal Families with Three Generations An Analysis of the 2010 Census Data Wang Yuesheng Abstract In contemporary

More information

m K K K K m Fig. 2 The plan layout of K K segment p

m K K K K m Fig. 2 The plan layout of K K segment p 410151 K7 + 914 - K7 + 984 12 5. 3 Midas DOI 10. 7617 /j. issn. 1000-8993. 2013. 09. 020 THE ANALYSIS OF THE DESIGN AND CONSTRUCTION SECURITY OF DEEP FOUNDATION IN PURUI TUNNEL OPEN-CUT SEGMENT Yang Ping

More information

m m m ~ mm

m m m ~ mm 2011 10 10 157 JOURNAL OF RAILWAY ENGINEERING SOCIETY Oct 2011 NO. 10 Ser. 157 1006-2106 2011 10-0007 - 0124-05 710043 6 TBM TBM U455. 43 A Structural Calculation and Analysis of Transfer Node of Three

More information

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315.

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315. 31 5 2011 10 JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct. 2011 1000-1301 2011 05-0075 - 09 510405 1 /35 TU3521 P315. 8 A Earthquake simulation shaking table test and analysis

More information

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel 2011 11 11 158 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2011 NO. 11 Ser. 158 1006-2106 2011 11-0104 - 08 1 2 1. 200048 2. 200002 < 20 mm 2 1 788 TU470 A Design and Construction of Deep Excavation Engineering

More information

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm 33 2 2011 4 ol. 33 No. 2 Apr. 2011 1002-8412 2011 02-0104-08 1 1 1 2 361003 3. 361009 3 1. 361005 2. GB50023-2009 TU746. 3 A Study on Single-span RC Frame Reinforced with Steel Truss System Yuan Xing-ren

More information

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0067 - 06 1 2 ( 1. 苏 州 设 计 研 究 院 股 份 有 限 公 司, 江 苏 苏 州 215021; 2. 苏 州 市 消 防 支 队, 江 苏 苏 州 215021) 1 2 3 4

More information

Settlement Equation " H = CrH 1+ e o log p' o + ( p' p' c o! p' o ) CcH + 1+ e o log p' c + p' f! ( p' p' c c! p' o ) where ΔH = consolidation settlem

Settlement Equation  H = CrH 1+ e o log p' o + ( p' p' c o! p' o ) CcH + 1+ e o log p' c + p' f! ( p' p' c c! p' o ) where ΔH = consolidation settlem Prediction of Compression and Recompression Indices of Texas Overconsolidated Clays Presented By: Sayeed Javed, Ph.D., P.E. Settlement Equation " H = CrH 1+ e o log p' o + ( p' p' c o! p' o ) CcH + 1+

More information

K301Q-D VRT中英文说明书141009

K301Q-D VRT中英文说明书141009 THE INSTALLING INSTRUCTION FOR CONCEALED TANK Important instuction:.. Please confirm the structure and shape before installing the toilet bowl. Meanwhile measure the exact size H between outfall and infall

More information

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal 5.12 5.12 100 cm 60 cm 5.12 TV641.4P631.4 A 10004548(2008)06079507 1962 E-mail: sschen@nhri.cn Analysis of effects of 5.12 Wenchuan Earthquake on Zipingpu Concrete Face Rock-fill Dam CHEN Sheng-shuiHUO

More information

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip * - 1 1 2 3 1. 100124 2. 100124 3. 210018 - ABAQUS - DOI 10. 13204 /j. gyjz201511033 EXPERIMENTAL STUDY AND THEORETICAL MODEL OF A NEW TYPE OF STEEL-LEAD DAMPING Shen Fei 1 Xue Suduo 1 Peng Lingyun 2 Ye

More information

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified 30 1 2013 1 Journal of Highway and Transportation Research and Development Vol. 30 No. 1 Jan. 2013 doi 10. 3969 /j. issn. 1002-0268. 2013. 01. 004 1 2 2 2 2 1. 400074 2. 400067 240 U416. 217 A 1002-0268

More information

地質調査研究報告/Bulletin of the Geological Survey of Japan

地質調査研究報告/Bulletin of the Geological Survey of Japan Shigeru Suto, Takayuki Inomata, Hisashi Sasaki and Sakae Mukoyama (2007) Data base of the volcanic ash fall distribution map of Japan. Bull. Geol. Surv. Japan, vol. 58(9/10), p.261-321, 8 figs, 2 tables,

More information

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec 31 6 2011 12 JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec. 2011 1000-1301 2011 06-0159 - 08 1 1 1 1 2 1. 150080 2. 100124 1 2 3 P315. 93 TU 43 TU41 A Shaking table test

More information

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6 29 1 Vol129, No11 2008 2 Journal of Building Structures Feb1 2008 : 100026869 (2008) 0120075208, (, 350002) :, 3,,, ;, ; : ; ; ; ; : TU39819 TU31711 : A Experimental studies on concrete filled steel tubular

More information

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~ PSB830 365000 32 mm PSB830 PSB830 TG 335 64 A Productive Practition of PSB830 Finishing Rolled Rebars PAN Jianzhou Bar Steel Rolling Minguang Co Ltd of Fujian Sansteel Sanming 365000 China Abstract High

More information

PLAXIS 2D m PLAXIS 3D Foundation mm ~ m ~ mm m m 312 m 200 mm 0. 98

PLAXIS 2D m PLAXIS 3D Foundation mm ~ m ~ mm m m 312 m 200 mm 0. 98 2011 11 11 158 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2011 NO. 11 Ser. 158 1006-2106 2011 11-0052 - 06 200002 6 PLAXIS 3D Foundation HS TU 471 A Design and 3D Numerical Analysis of a Deep Excavation

More information

Soliman Addenbrooke Potts Chehade Shahrour Fig. 1 Plan view for construction site m 2

Soliman Addenbrooke Potts Chehade Shahrour Fig. 1 Plan view for construction site m 2 7 5 Vol. 7 2011 10 Chinese Journal of Underground Space and Engineering Oct. 2011 * 1 1 2 1 1. 200072 2. 200062 U455. 43 A 1673-0836 2011 05-0884 - 06 Numerical Simulation Analysis on Ground Settlements

More information

708 北 京 工 业 大 学 学 报 2011 年 以 往 的 试 验 结 果 进 行 对 比, 选 取 15D 20D 作 为 对 比 参 数, 试 件 参 数 见 表 1. Fig. 1 图 1 试 件 尺 寸 及 配 筋 图 ( mm) Geometry and reinforcement

708 北 京 工 业 大 学 学 报 2011 年 以 往 的 试 验 结 果 进 行 对 比, 选 取 15D 20D 作 为 对 比 参 数, 试 件 参 数 见 表 1. Fig. 1 图 1 试 件 尺 寸 及 配 筋 图 ( mm) Geometry and reinforcement 第 37 卷 第 5 期 2011 年 5 月 北 京 工 业 大 学 学 报 JOURNAL OF BEIJING UNIVERSITY OF TECHNOLOGY Vol. 37 No. 5 May 2011 植 筋 钢 筋 混 凝 土 锚 固 构 件 抗 震 性 能 试 验 研 究 邓 宗 才 1, 钟 林 杭 1, 张 永 方 1, 曾 洪 超 1 2, 范 世 平 ( 1. 北 京 工 业

More information

~ ~

~ ~ * 40 4 2016 7 Vol. 40 No. 4 July 2016 35 Population Research 2014 1 2016 2016 9101. 0 40 49. 6% 2017 ~ 2021 1719. 5 160 ~ 470 100872 Accumulated Couples and Extra Births under the Universal Tw o-child

More information

OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) ( ) CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 (

OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) ( ) CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 ( 35 1 2006 48 35-46 OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) (93 5 28 95 1 9 ) 94 1-2 5-6 8-10 94 7 CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 (A 47.5 ) T2 73 (A 46.6 ) 3 CK2 T1 T2 CK1 2006 8 16

More information

标题

标题 第 48 卷 第 6 期 2 1 6 年 6 月 哈 尔 滨 工 业 大 学 学 报 JOURNAL OF HARBIN INSTITUTE OF TECHNOLOGY Vol 48 No 6 Jun. 216 doi:1.11918 / j.issn.367 6234.216.6.1 大 跨 度 楼 盖 结 构 在 运 动 荷 载 下 的 振 动 性 能 杨 维 国 1, 马 伯 涛 2, 宋 毛

More information

國立中山大學學位論文典藏.PDF

國立中山大學學位論文典藏.PDF I II III The Study of Factors to the Failure or Success of Applying to Holding International Sport Games Abstract For years, holding international sport games has been Taiwan s goal and we are on the way

More information

59 [1] [2] [3] A A ( 4 ) A A [4]

59 [1] [2] [3] A A ( 4 ) A A [4] 5 1 5 (1): 58 70 2013 3 JOURNAL OF ENGINEERING STUDIES Mar., 2013 DOI: 10.3724/SP.J.1224.2013.00058 100190 20 50 70 2009 60 G301 A 1674-4969(2013)01-0058-13 20 50 1 : 2012 12 25; : 2013 01 18 : (Y250013015)

More information

http / /yxxy. cbpt. cnki. net / % % %

http / /yxxy. cbpt. cnki. net / % % % 2017 3 Mar. 2017 5 2 Chongqing Higher Education Research Vol. 5 No. 2 DOI 10. 15998 /j. cnki. issn1673-8012. 2017. 02. 006 230039 2011 2015 2016 G649. 21 A 1673-8012 2017 02-0037-11 2017-01-03 2015zdjy024

More information

压 缩 分 散 型 预 应 力 锚 索 近 年 来 有 了 较 多 的 应 用, 并 取 得 了 良 好 的 加 固 效 果 软 弱 岩 土 体 的 主 要 特 性 是 无 论 其 峰 值 强 度 还 是 残 余 强 度 都 是 很 低 的, 其 承 载 力 低 稳 定 性 差 压 缩 分 散 型

压 缩 分 散 型 预 应 力 锚 索 近 年 来 有 了 较 多 的 应 用, 并 取 得 了 良 好 的 加 固 效 果 软 弱 岩 土 体 的 主 要 特 性 是 无 论 其 峰 值 强 度 还 是 残 余 强 度 都 是 很 低 的, 其 承 载 力 低 稳 定 性 差 压 缩 分 散 型 第 8 卷 第 2 期 中 国 水 利 水 电 科 学 研 究 院 学 报 Vol.8 No.2 年 6 月 Journal of China Institute of Water Resources amd Hydropower Research June, 文 章 编 号 :1672-3031()02-0121-07 压 缩 分 散 型 锚 索 在 软 弱 岩 土 中 的 应 用 与 试 验 研

More information

國 立 屏 東 教 育 大 學 中 國 語 文 學 系 碩 士 班 碩 士 論 文 國 小 國 語 教 科 書 修 辭 格 分 析 以 南 一 版 為 例 指 導 教 授 : 柯 明 傑 博 士 研 究 生 : 鄺 綺 暖 撰 中 華 民 國 一 百 零 二 年 七 月 謝 辭 寫 作 論 文 的 日 子 終 於 畫 下 了 句 點, 三 年 前 懷 著 對 文 學 的 熱 愛, 報 考 了 中

More information

(baking powder) 1 ( ) ( ) 1 10g g (two level design, D-optimal) 32 1/2 fraction Two Level Fractional Factorial Design D-Optimal D

(baking powder) 1 ( ) ( ) 1 10g g (two level design, D-optimal) 32 1/2 fraction Two Level Fractional Factorial Design D-Optimal D ( ) 4 1 1 1 145 1 110 1 (baking powder) 1 ( ) ( ) 1 10g 1 1 2.5g 1 1 1 1 60 10 (two level design, D-optimal) 32 1/2 fraction Two Level Fractional Factorial Design D-Optimal Design 1. 60 120 2. 3. 40 10

More information

a b

a b 38 3 2014 5 Vol. 38 No. 3 May 2014 55 Population Research + + 3 100038 A Study on Implementation of Residence Permit System Based on Three Local Cases of Shanghai Chengdu and Zhengzhou Wang Yang Abstract

More information

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行 火 电 机 组 小 岛 运 行 工 况 分 析 刘 伟 东 方 电 气 股 份 有 限 公 司, 成 都 610036 摘 要 : 目 前 执 行 的 对 外 火 电 工 程 合 同 中, 不 管 装 机 大 小, 大 部 分 都 要 求 机 组 验 收 时 完 成 小 岛 运 行 试 验 ( 即 FCB 或 House load operation), 并 作 为 重 要 的 验 收 条 件 基

More information

2005 5,,,,,,,,,,,,,,,,, , , 2174, 7014 %, % 4, 1961, ,30, 30,, 4,1976,627,,,,, 3 (1993,12 ),, 2

2005 5,,,,,,,,,,,,,,,,, , , 2174, 7014 %, % 4, 1961, ,30, 30,, 4,1976,627,,,,, 3 (1993,12 ),, 2 3,,,,,, 1872,,,, 3 2004 ( 04BZS030),, 1 2005 5,,,,,,,,,,,,,,,,, 1928 716,1935 6 2682 1928 2 1935 6 1966, 2174, 7014 %, 94137 % 4, 1961, 59 1929,30, 30,, 4,1976,627,,,,, 3 (1993,12 ),, 2 , :,,,, :,,,,,,

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 i ii Abstract The most important task in human resource management is to encourage and help employees to develop their potential so that they can fully contribute to the organization s goals. The main

More information

從詩歌的鑒賞談生命價值的建構

從詩歌的鑒賞談生命價值的建構 Viktor E. Frankl (logotherapy) (will-to-meaning) (creative values) Ture (Good) (Beauty) (experiential values) (attitudinal values) 1 2 (logotherapy) (biological) (2) (psychological) (3) (noölogical) (4)

More information

前 言 一 場 交 換 學 生 的 夢, 夢 想 不 只 是 敢 夢, 而 是 也 要 敢 去 實 踐 為 期 一 年 的 交 換 學 生 生 涯, 說 長 不 長, 說 短 不 短 再 長 的 路, 一 步 步 也 能 走 完 ; 再 短 的 路, 不 踏 出 起 步 就 無 法 到 達 這 次

前 言 一 場 交 換 學 生 的 夢, 夢 想 不 只 是 敢 夢, 而 是 也 要 敢 去 實 踐 為 期 一 年 的 交 換 學 生 生 涯, 說 長 不 長, 說 短 不 短 再 長 的 路, 一 步 步 也 能 走 完 ; 再 短 的 路, 不 踏 出 起 步 就 無 法 到 達 這 次 壹 教 育 部 獎 助 國 內 大 學 校 院 選 送 優 秀 學 生 出 國 研 修 之 留 學 生 成 果 報 告 書 奧 地 利 約 翰 克 卜 勒 大 學 (JKU) 留 學 心 得 原 就 讀 學 校 / 科 系 / 年 級 : 長 榮 大 學 / 財 務 金 融 學 系 / 四 年 級 獲 獎 生 姓 名 : 賴 欣 怡 研 修 國 家 : 奧 地 利 研 修 學 校 : 約 翰 克 普

More information

國立中山大學學位論文典藏

國立中山大學學位論文典藏 i Examinations have long been adopting for the selection of the public officials and become an essential tradition in our country. For centuries, the examination system, incorporated with fairness, has

More information

畜牧 动物医学 蚕 蜂

畜牧 动物医学 蚕 蜂 中国农学通报 2015,31(20):181-185 Chinese Agricultural Science Bulletin 老河口市砂梨花期的物候特点分析 邓 环 1 马德栗 1 徐洪海 2 洪国平 1 2 武汉区域气候中心 武汉 430074 老河口气象局 湖北老河口 441800 1 摘 要 为掌握湖北省老河口市砂梨花期的物候规律 利用老河口市 20 年的砂梨裂蕾期 初花期 和盛花期 4

More information

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut 60 2 2016 2 RAILWAY STANDARD DESIGN Vol. 60 No. 2 Feb. 2016 1004-2954201602-0071-06 BIM 1 1 2 2 1 1. 7140992. 710054 BIM BIM 3D 4D nd BIM 1 3D 4D Revit BIM BIM U442. 5TP391. 72 A DOI10. 13238 /j. issn.

More information

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [ 第 30 卷 第 12 期 2011 年 12 月 地 理 科 学 进 展 PROGRESS IN GEOGRAPHY Vol.30, No.12 Dec., 2012 中 国 农 村 地 区 住 房 结 构 的 区 域 差 异 及 其 影 响 因 素 1, 2, 李 方 一 3 1,, 高 晓 路 2 2, 王 英 杰 (1. 中 国 科 学 院 区 域 可 持 续 发 展 分 析 与 模 拟 重

More information

10 3 107 artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti - float and anti - ra

10 3 107 artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti - float and anti - ra 2012 10 10 169 JOURNAL OF RAILWAY ENGINEERING SOCIETY Oct 2012 NO. 10 Ser. 169 1006-2106 2012 10-0106 - 05 3 ( 中 铁 二 院 昆 明 勘 察 设 计 研 究 院 有 限 责 任 公 司, 昆 明 650200) 3 3 1 3 2 3 + 4 U239. 3 TU47 A Geotechnical

More information

标题

标题 第 46 卷 第 12 期 2 0 1 4 年 12 月 哈 尔 滨 工 业 大 学 学 报 JOURNAL OF HARBIN INSTITUTE OF TECHNOLOGY Vol 46 No 12 Dec. 2014 装 配 式 混 凝 土 双 板 短 肢 剪 力 墙 拟 静 力 试 验 肖 全 东, 郭 正 兴 ( 东 南 大 学 土 木 工 程 学 院, 210096 南 京 ) 摘 要

More information

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C Journal of Building Structures 1000-6869 2011 06-0010-08 32 6 2011 6 Vol. 32 No. 6 June 2011 002 200092 14 1 /15 7 7 7 8 MIDAS 7 TU973 TU317. 1 A Seismic performance of multi-tower structure with large

More information

~ a 3 h NCEP ~ 24 3 ~ ~ 8 9 ~ km m ~ 500 m 500 ~ 800 m 800 ~ m a 200

~ a 3 h NCEP ~ 24 3 ~ ~ 8 9 ~ km m ~ 500 m 500 ~ 800 m 800 ~ m a 200 31 1 2013 3 Journal of Arid Meteorology Vol. 31 No. 1 March 2013. J. 2013 31 1 62-69. doi 10. 11755 /j. issn. 1006-7639 2013-01 - 0062 211101 2000 ~ 2010 3 h 2. 5 2. 5 NCEP 2 5 ~ 7 02 11 05 ~ 08 2 ~ 8

More information

附件1:

附件1: 附 件 1: 全 国 优 秀 教 育 硕 士 专 业 学 位 论 文 推 荐 表 单 位 名 称 : 西 南 大 学 论 文 题 目 填 表 日 期 :2014 年 4 月 30 日 数 学 小 组 合 作 学 习 的 课 堂 管 理 攻 硕 期 间 及 获 得 硕 士 学 位 后 一 年 内 获 得 与 硕 士 学 位 论 文 有 关 的 成 果 作 者 姓 名 论 文 答 辩 日 期 学 科 专

More information

東莞工商總會劉百樂中學

東莞工商總會劉百樂中學 /2015/ 頁 (2015 年 版 ) 目 錄 : 中 文 1 English Language 2-3 數 學 4-5 通 識 教 育 6 物 理 7 化 學 8 生 物 9 組 合 科 學 ( 化 學 ) 10 組 合 科 學 ( 生 物 ) 11 企 業 會 計 及 財 務 概 論 12 中 國 歷 史 13 歷 史 14 地 理 15 經 濟 16 資 訊 及 通 訊 科 技 17 視 覺

More information

KJWJ01 Fig. 1 Geological map of the Kajiwa landslide PDH01 60 ~ 70m 80 ~ 90m 80m 2 930m 556m 641m 598m m m 3 2 Ⅰ m 2

KJWJ01 Fig. 1 Geological map of the Kajiwa landslide PDH01 60 ~ 70m 80 ~ 90m 80m 2 930m 556m 641m 598m m m 3 2 Ⅰ m 2 Vol. 39 No. 1 Jan. 2012 HYDROGEOLOGY & ENGINEERING GEOLOGY 39 1 2012 1-621701 - - P642. 2 A 1000-3665 2012 01-0058-07 2 ~ 4 2 r 3 3 1 col + dl 500 ~ 1 050m Q 4 2 Q del 4 3 8 ~ 50 ~ 60m 10 r 4 1 2 1 2 2.

More information

168 健 等 木醋对几种小浆果扦插繁殖的影响 第1期 the view of the comprehensive rooting quality, spraying wood vinegar can change rooting situation, and the optimal concent

168 健 等 木醋对几种小浆果扦插繁殖的影响 第1期 the view of the comprehensive rooting quality, spraying wood vinegar can change rooting situation, and the optimal concent 第 31 卷 第 1 期 2013 年 3 月 经 济 林 研 究 Nonwood Forest Research Vol. 31 No.1 Mar. 2013 木醋对几种小浆果扦插繁殖的影响 健 1,2 杨国亭 1 刘德江 2 (1. 东北林业大学 生态研究中心 黑龙江 哈尔滨 150040 2. 佳木斯大学 生命科学学院 黑龙江 佳木斯 154007) 摘 要 为了解决小浆果扦插繁殖中生根率及成活率低等问题

More information

33 4-67 Fig. 1 1 Plan of typical floor 2 Fig. 2 Analysis model - 1 0. 85 4 1 Table 1 Period results s SATWE ETABS SAP2000 ABAQUS T 1 4. 681 4. 679 4.

33 4-67 Fig. 1 1 Plan of typical floor 2 Fig. 2 Analysis model - 1 0. 85 4 1 Table 1 Period results s SATWE ETABS SAP2000 ABAQUS T 1 4. 681 4. 679 4. 33 4 2011 8 Earthquake Resistant Engineering and Retrofitting Vol. 33 No. 4 Aug. 2011 1002-8412 2011 04-0066-07-1 2 2 2 3 1. 100084 2. 518029 3 523808-215m 11. 2 - TU973 +. 17 A Summarization of Structural

More information

- 3 University of Bristol 1.1 FLAC 3D 1 FLAC 3D FLAC 3D 1

- 3 University of Bristol 1.1 FLAC 3D 1 FLAC 3D FLAC 3D 1 /3 NSC 9-11-E-011-0 9 08 01 93 07 31 aspects of the problem involved, including constitutive modeling, model testing, and numerical simulation. Then, the algorithm developed will be verified with field

More information

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D>

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D> 企 业 及 产 品 简 介 COMPANY & PRODUCTS INTRODUCTION 山 东 泗 水 康 得 新 复 合 材 料 有 限 公 司 SHANDONG SISHUI KANGDE XIN COMPOSITE MATERIAL CO., LTD. 集 团 概 况 KDXGROUP OVERVIEW 1 拥 有 两 大 产 业 群 : 预 涂 膜 和 光 学 膜 1. GROUP HAS

More information

Microsoft Word - 01李惠玲ok.doc

Microsoft Word - 01李惠玲ok.doc 康 寧 學 報 11:1-20(2009) 1 數 位 學 習 於 護 理 技 術 課 程 之 運 用 與 評 值 * 李 惠 玲 ** 高 清 華 *** 呂 莉 婷 摘 要 背 景 : 網 路 科 技 在 教 育 的 使 用 已 成 為 一 種 有 利 的 教 學 輔 助 工 具 網 路 教 學 的 特 性, 在 使 學 習 可 不 分 時 間 與 空 間 不 同 進 度 把 握 即 時 性 資

More information

Microsoft Word - 論文封面-980103修.doc

Microsoft Word - 論文封面-980103修.doc 淡 江 大 學 中 國 文 學 學 系 碩 士 在 職 專 班 碩 士 論 文 指 導 教 授 : 呂 正 惠 蘇 敏 逸 博 士 博 士 倚 天 屠 龍 記 愛 情 敘 事 之 研 究 研 究 生 : 陳 麗 淑 撰 中 華 民 國 98 年 1 月 淡 江 大 學 研 究 生 中 文 論 文 提 要 論 文 名 稱 : 倚 天 屠 龍 記 愛 情 敘 事 之 研 究 頁 數 :128 校 系 (

More information

A VALIDATION STUDY OF THE ACHIEVEMENT TEST OF TEACHING CHINESE AS THE SECOND LANGUAGE by Chen Wei A Thesis Submitted to the Graduate School and Colleg

A VALIDATION STUDY OF THE ACHIEVEMENT TEST OF TEACHING CHINESE AS THE SECOND LANGUAGE by Chen Wei A Thesis Submitted to the Graduate School and Colleg 上 海 外 国 语 大 学 SHANGHAI INTERNATIONAL STUDIES UNIVERSITY 硕 士 学 位 论 文 MASTER DISSERTATION 学 院 国 际 文 化 交 流 学 院 专 业 汉 语 国 际 教 育 硕 士 题 目 届 别 2010 届 学 生 陈 炜 导 师 张 艳 莉 副 教 授 日 期 2010 年 4 月 A VALIDATION STUDY

More information

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代 Chinese oil import policies and reforms SINOPEC EDRI 2014.8 Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化,

More information

WTO

WTO 10384 200015128 UDC Exploration on Design of CIB s Human Resources System in the New Stage (MBA) 2004 2004 2 3 2004 3 2 0 0 4 2 WTO Abstract Abstract With the rapid development of the high and new technique

More information

A Community Guide to Environmental Health

A Community Guide to Environmental Health 102 7 建 造 厕 所 本 章 内 容 宣 传 推 广 卫 生 设 施 104 人 们 需 要 什 么 样 的 厕 所 105 规 划 厕 所 106 男 女 对 厕 所 的 不 同 需 求 108 活 动 : 给 妇 女 带 来 方 便 110 让 厕 所 更 便 于 使 用 111 儿 童 厕 所 112 应 急 厕 所 113 城 镇 公 共 卫 生 设 施 114 故 事 : 城 市 社

More information

ANSYS WF 1 WF 2 2 SP 1 SP 2 1 NBF 1 1 Fig. 1 1 Connection details of specimens 1 Table 1 Specimen s

ANSYS WF 1 WF 2 2 SP 1 SP 2 1 NBF 1 1 Fig. 1 1 Connection details of specimens 1 Table 1 Specimen s 27 4 2011 12 WORLD EARTHQUAKE ENGINEERING Vol. 27 No. 4 Dec. 2011 1007 6069 2011 04 0102 07 1 2 2 1. 710055 2. 266033 4 1 2 ANSYS 2 U442. 5 + 5 A Study on seismic behavior of widened beam flange connections

More information

Microsoft PowerPoint _代工實例-1

Microsoft PowerPoint _代工實例-1 4302 動態光散射儀 (Dynamic Light Scattering) 代工實例與結果解析 生醫暨非破壞性分析團隊 2016.10 updated Which Size to Measure? Diameter Many techniques make the useful and convenient assumption that every particle is a sphere. The

More information

南華大學數位論文

南華大學數位論文 -- Managing Traditional Temples A Case Study of Representative Temples in CHIA-YI i Abstract This research used the methodology of field study historical comparative research, and qualitative interview

More information

1 Fig. 1 Perspective view of New CCTV Building 13008mm 2, 2811% ( ) 6, HRB400, 1187mm 2, 216% C60, 32095mm 2, Q345, 2 4,, Q345, Q390C, 2, 1 Q235, 5mm

1 Fig. 1 Perspective view of New CCTV Building 13008mm 2, 2811% ( ) 6, HRB400, 1187mm 2, 216% C60, 32095mm 2, Q345, 2 4,, Q345, Q390C, 2, 1 Q235, 5mm 29 3 Vol129, No13 2008 6 Journal of Building Structures June 2008 : 100026869 (2008) 0320031209 SRC 1, 1, 1, 1, 2, 2, 2 (1., 200092; 2., 200002) : SRC 30%, SRC 9,, N P 2M P SRC, SRC ; N P 2M P SRC : ;

More information

T R 1 t z v 4z 2 + x 2 t = 2 槡 v t z 200 m/s x v ~

T R 1 t z v 4z 2 + x 2 t = 2 槡 v t z 200 m/s x v ~ 2011 10 10 157 JOURNAL OF RAILWAY ENGINEERING SOCIETY Qct 2011 NO. 10 Ser. 157 1006-2106 2011 10-0072 - 06 430063 CMP P631. 325 A Experimental Study on Geophysical Prospecting Method for Subsidence of

More information

Microsoft Word - 11--方刚_new_.doc

Microsoft Word - 11--方刚_new_.doc 第 44 卷 第 3 期 煤 田 地 质 与 勘 探 Vol. 44 No.3 2016 年 6 月 COAL GEOLOGY & EXPLORATION Jun. 2016 文 章 编 号 : 1001-1986(2016)03-0057-08 铜 川 玉 华 煤 矿 顶 板 离 层 水 突 水 机 理 与 防 治 方 刚 1,2,3, 靳 德 武 (1. 中 煤 科 工 集 团 西 安 研 究

More information

% % % % % % ~

% % % % % % ~ 1001-5558 2015 03-0021-16 2010 C91 A 2014 5 2010 N. W. Journal of Ethnology 2015 3 86 2015.No.3 Total No.86 2010 2010 2181.58 882.99 40.47% 1298.59 59.53% 2013 2232.78 847.29 37.95% 1385.49 62.05% 1990

More information

A Study on the Relationships of the Co-construction Contract A Study on the Relationships of the Co-Construction Contract ( ) ABSTRACT Co-constructio in the real estate development, holds the quite

More information

Microsoft Word - TIP006SCH Uni-edit Writing Tip - Presentperfecttenseandpasttenseinyourintroduction readytopublish

Microsoft Word - TIP006SCH Uni-edit Writing Tip - Presentperfecttenseandpasttenseinyourintroduction readytopublish 我 难 度 : 高 级 对 们 现 不 在 知 仍 道 有 听 影 过 响 多 少 那 次 么 : 研 英 究 过 文 论 去 写 文 时 作 的 表 技 引 示 巧 言 事 : 部 情 引 分 发 言 该 生 使 在 中 用 过 去, 而 现 在 完 成 时 仅 表 示 事 情 发 生 在 过 去, 并 的 哪 现 种 在 时 完 态 成 呢 时? 和 难 过 道 去 不 时 相 关? 是 所 有

More information

Shanghai International Studies University A STUDY ON SYNERGY BUYING PRACTICE IN ABC COMPANY A Thesis Submitted to the Graduate School and MBA Center I

Shanghai International Studies University A STUDY ON SYNERGY BUYING PRACTICE IN ABC COMPANY A Thesis Submitted to the Graduate School and MBA Center I 上 海 外 国 语 大 学 工 商 管 理 硕 士 学 位 论 文 ABC 中 国 食 品 公 司 的 整 合 采 购 研 究 学 科 专 业 : 工 商 管 理 硕 士 (MBA) 作 者 姓 名 :0113700719 指 导 教 师 : 答 辩 日 期 : 2013 年 12 月 上 海 外 国 语 大 学 二 一 四 年 一 月 Shanghai International Studies

More information

Microsoft Word doc

Microsoft Word doc 中 考 英 语 科 考 试 标 准 及 试 卷 结 构 技 术 指 标 构 想 1 王 后 雄 童 祥 林 ( 华 中 师 范 大 学 考 试 研 究 院, 武 汉,430079, 湖 北 ) 提 要 : 本 文 从 结 构 模 式 内 容 要 素 能 力 要 素 题 型 要 素 难 度 要 素 分 数 要 素 时 限 要 素 等 方 面 细 致 分 析 了 中 考 英 语 科 试 卷 结 构 的

More information

Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song

Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song I ABSTRACT They are very necessary and important to carry on the research on the welding residual

More information

一次辽宁暴雨过程的诊断及风场反演分析

一次辽宁暴雨过程的诊断及风场反演分析 Climate Change Research Letters 气 候 变 化 研 究 快 报, 2013, 2, 139-146 http://dx.doi.org/10.12677/ccrl.2013.24024 Published Online October 2013 (http://www.hanspub.org/journal/ccrl.html) Analysis of the Diagnosis

More information

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva 39 6 2011 12 Journal of Fuzhou University Natural Science Edition Vol 39 No 6 Dec 2011 DOI CNKI 35-1117 /N 20111220 0901 002 1000-2243 2011 06-0923 - 07 350108 105 m 14 69% TU311 3 A Seismic analysis of

More information

Fig. 1 Geographical position of the Baidu site Fig. 2 2 Geomorphological map and distribution of the excavation squares m 150m

Fig. 1 Geographical position of the Baidu site Fig. 2 2 Geomorphological map and distribution of the excavation squares m 150m 29 4 Vol. 29 No. 4 2010 11 ACTA ANTHROPOLOGICA SINICA Nov. 2010 1 1 2 1. 530022 2. 533000 2002 700m 2 1500 4 K871. 11 A 1000-3193 2010 04-355-17 1 1km 10km 20km 23 36 42 N 107 01 36 E 1 10000m 2 2002 700m

More information

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378>

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378> 高 拱 坝 坝 踵 应 力 实 测 与 计 算 结 果 差 异 原 因 分 析 张 国 新 周 秋 景 ( 中 国 水 利 水 电 科 学 研 究 院, 北 京 100038) 摘 要 : 坝 踵 应 力 是 关 系 到 混 凝 土 坝 是 否 开 裂 和 安 全 的 一 个 重 要 指 标, 不 管 是 用 结 构 力 学 法 还 是 有 限 元 法 都 能 计 算 出 坝 踵 有 一 定 的 拉

More information

Abstract Due to the improving of living standards, people gradually seek lighting quality from capacityto quality. And color temperature is the important subject of it. According to the research from aboard,

More information

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y * 35 4 2011 7 Vol. 35 No. 4 July 2011 3 Population Research 1950 ~ 1981 The Estimation Method and Its Application of Cohort Age - specific Fertility Rates Wang Gongzhou Hu Yaoling Abstract Based on the

More information

4 155 earthquake resilient structure 1 Yahya Kurama 2 Bulent Erkmen 3 Jose Restrepo 4 Brian Smith C40 HRB mm mm 125 mm 2

4 155 earthquake resilient structure 1 Yahya Kurama 2 Bulent Erkmen 3 Jose Restrepo 4 Brian Smith C40 HRB mm mm 125 mm 2 34 4 2014 8 EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS Vol. 34 No. 4 Aug. 2014 1000-1301 2014 04-0154 - 08 DOI 10. 13197 /j. eeev. 2014. 04. 154. dangxl. 020 200092 TU375 P315. 92 A Experimental study

More information

Oates U

Oates U 2018 3 94 233030 30 20002015 F061. 5 F062. 1 A 1671-9301 2018 03-0053-11 DOI:10.13269/j.cnki.ier.2018.03.005 1 1994 2018-02-22 2018-04-26 1981 13&ZD025 1708085MG172 KJ2018A0442 2017ZD003 53 2 3 4 5 Oates

More information

入學考試網上報名指南

入學考試網上報名指南 入 學 考 試 網 上 報 名 指 南 On-line Application Guide for Admission Examination 16/01/2015 University of Macau Table of Contents Table of Contents... 1 A. 新 申 請 網 上 登 記 帳 戶 /Register for New Account... 2 B. 填

More information

<4D6963726F736F667420576F7264202D20C8EDCDC1B5D8BBF9CDB2BBF9CAD4B2C9C6BDCCA8B5C4CACAD3C3D0D4B7D6CEF6>

<4D6963726F736F667420576F7264202D20C8EDCDC1B5D8BBF9CDB2BBF9CAD4B2C9C6BDCCA8B5C4CACAD3C3D0D4B7D6CEF6> 第 47 卷 第 2 期 西 安 建 筑 科 技 大 学 学 报 ( 自 然 科 学 版 ) Vol. 47 No.2 2015 年 4 月 J. Xi'an Univ. of Arch. & Tech. (Natural Science Edition) Apr. 2015 DOI:10.15986/j.1006-7930.2015.02.016 软 土 地 基 筒 基 试 采 平 台 的 适 用

More information

,20,, ; ;,,,,,,,, 20 30,,,,,, ( 2000 ) ( 2002 ) ( ) ( ) ( ), ( ) :, ;:, ; 20 ( ) (181 ) 185

,20,, ; ;,,,,,,,, 20 30,,,,,, ( 2000 ) ( 2002 ) ( ) ( ) ( ), ( ) :, ;:, ; 20 ( ) (181 ) 185 20 (1900 1930) 20,,,,,, 20,,20, (,50 ),, 90, 184 ,20,, ; ;,,,,,,,, 20 30,,,,,, ( 2000 ) ( 2002 ) ( 2002 6 ) 20 20 40 ( 2002 4 ) ( 2000 2 ), ( 2002 4 ) :, 1995 2 ;:, 1997 3 ; 20 ( 2003 4 ) (181 ) 185 2004

More information

Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditio

Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditio Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditioning Initial situation Passive House Technology Experience

More information

SHIMPO_表1-表4

SHIMPO_表1-表4 For servo motor ABLEREDUCER SSeries Coaxial shaft series Features S series Standard backlash is 3 arc-min, ideal for precision control. High rigidity & high torque were achived by uncaged needle roller

More information

4 51 1 Scoones 1998 20 60 70 2002 2001 20 90 World Bank DFID Sussex IDS 2012 2 2. 1 UNDP CARE DFID DFID DFID 1997 IDS 2009 1 5

4 51 1 Scoones 1998 20 60 70 2002 2001 20 90 World Bank DFID Sussex IDS 2012 2 2. 1 UNDP CARE DFID DFID DFID 1997 IDS 2009 1 5 38 4 2014 7 Vol. 38 No. 4 July 2014 50 Population Research * 30 4 100872 Livelihood and Development Capacity of Families Obeying the Family Planning Policy in Rural China A Sustainable Livelihood Analytical

More information

10384 X0115071 UDC The Research For The Actuality And Development Stratagem Of The China Securities Investment Fund (MBA) 2003 11 2003 12 2003 12 2 0 0 3 11 100 1991, WTO Abstract Abstract The Securities

More information

cm hpa hpa 2 45 N hpa ~ 12 Fig. 1 The observed rainfall distribution of Shanxi

cm hpa hpa 2 45 N hpa ~ 12 Fig. 1 The observed rainfall distribution of Shanxi 28 3 2010 9 1006-7639 2010-03 - 0332-06 Journal of Arid Meteorology Vol. 28 No. 3 Sept 2010 1 1 2 1 3 1. 046000 2. 030404 3. 034000 2009 11 10 ~ 12 1 10 11 2300 hpa 3500 hpa 41 500 m 2 850 hpa 5FY - 2C

More information

43 14. 45 3 7 220 1 2 cm /s 2 1. 5 3 1 4 c d 1 /40 1 /4 1 /9 600 0. 129 6 7 1 /6 400 1 /256 000 1. 5 2 2 2. 1 /m /Hz /kn / kn m 6 6 0. 1 ~ 50 600 1 80

43 14. 45 3 7 220 1 2 cm /s 2 1. 5 3 1 4 c d 1 /40 1 /4 1 /9 600 0. 129 6 7 1 /6 400 1 /256 000 1. 5 2 2 2. 1 /m /Hz /kn / kn m 6 6 0. 1 ~ 50 600 1 80 43 14 2013 7 Building Structure Vol. 43 No. 14 Jul. 2013 * 1 1 1 2 3 3 3 2 2 1 100013 2 430022 3 200002 1 40 ETABS ABAQUS TU355 TU317 +. 1 A 1002-848X 2013 14-0044-04 Compairion study between the shaking

More information

31 17 www. watergasheat. com km 2 17 km 15 km hm % mm Fig. 1 Technical route of p

31 17 www. watergasheat. com km 2 17 km 15 km hm % mm Fig. 1 Technical route of p 31 17 215 9 CHINA WATER & WASTEWATER Vol. 31 No. 17 Sep. 215 < > 232 SUSTAIN BMP SUSTAIN TU992 C 1-462 215 17-111 - 8 Planning and Design of Sponge City Case Study of Beijing Yongding River Ecological

More information

Shanghai International Studies University THE STUDY AND PRACTICE OF SITUATIONAL LANGUAGE TEACHING OF ADVERB AT BEGINNING AND INTERMEDIATE LEVEL A Thes

Shanghai International Studies University THE STUDY AND PRACTICE OF SITUATIONAL LANGUAGE TEACHING OF ADVERB AT BEGINNING AND INTERMEDIATE LEVEL A Thes 上 海 外 国 语 大 学 硕 士 学 位 论 文 对 外 汉 语 初 中 级 副 词 情 境 教 学 研 究 与 实 践 院 系 : 国 际 文 化 交 流 学 院 学 科 专 业 : 汉 语 国 际 教 育 姓 名 : 顾 妍 指 导 教 师 : 缪 俊 2016 年 5 月 Shanghai International Studies University THE STUDY AND PRACTICE

More information

3 (s05q6) The diagram shows the velocity-time graph for a lift moving between floors in a building. The graph consists of straight line segments. In t

3 (s05q6) The diagram shows the velocity-time graph for a lift moving between floors in a building. The graph consists of straight line segments. In t Mechnics (9709) M1 Topic 1 : s-t and v-t graph(9) Name: Score: Time: 1 (s03q3) The diagram shows the velocity-time graphs for the motion of two cyclists P and Q, whotravel in the same direction along a

More information

硕 士 学 位 论 文 论 文 题 目 : 北 岛 诗 歌 创 作 的 双 重 困 境 专 业 名 称 : 中 国 现 当 代 文 学 研 究 方 向 : 中 国 新 诗 研 究 论 文 作 者 : 奚 荣 荣 指 导 老 师 : 姜 玉 琴 2014 年 12 月

硕 士 学 位 论 文 论 文 题 目 : 北 岛 诗 歌 创 作 的 双 重 困 境 专 业 名 称 : 中 国 现 当 代 文 学 研 究 方 向 : 中 国 新 诗 研 究 论 文 作 者 : 奚 荣 荣 指 导 老 师 : 姜 玉 琴 2014 年 12 月 硕 士 学 位 论 文 论 文 题 目 : 北 岛 诗 歌 创 作 的 双 重 困 境 专 业 名 称 : 中 国 现 当 代 文 学 研 究 方 向 : 中 国 新 诗 研 究 论 文 作 者 : 奚 荣 荣 指 导 老 师 : 姜 玉 琴 2014 年 12 月 致 谢 文 学 是 我 们 人 类 宝 贵 的 精 神 财 富 两 年 半 的 硕 士 学 习 让 我 进 一 步 接 近 文 学,

More information

SHIMPO_表1-表4

SHIMPO_表1-表4 For servo motor ABLEREDUCER L Series Features Coaxial shaft series L series Helical gears contribute to reduce vibration and noise. Standard backlash is 5 arc-min, ideal for precision control. High rigidity

More information

03施琅「棄留臺灣議」探索.doc

03施琅「棄留臺灣議」探索.doc 38 93 43 59 43 44 1 2 1621 1645 1646 3 1647 1649 4 1 1996 12 121 2 1988 1 54---79 3 1990 2 39 4 1987 8 16 19 1649 27---28 45 1651 5 1656 1662 1664 1667 1668 6 1681 1683 7 13 1958 2 1651 2002 11 67 1961

More information

廣州舊城區的保護和發展

廣州舊城區的保護和發展 黄 爲 爲 爲 爲 塲 爲 茘 爲 爲 爲 爲 産 统 装 爲 爲 爲 爲 爲 爲 爲 茘 衞 産 爲 塲 爲 爲 爲 爲 爲 滙 爲 滙 爲 爲 爲 爲 爲麽麽 强 迹 啓 啓 産 産 [1] [2] [3] [4] 20 [5] 2000 [6] [7], 20 [8] http://www.gz.gov.cn2002.7.14 [9] 2000.4 [10] [11] 20 2001.1.29

More information

我国原奶及乳制品安全生产和质量安全管理研究

我国原奶及乳制品安全生产和质量安全管理研究 密 级 论 文 编 号 中 国 农 业 科 学 院 硕 士 学 位 论 文 我 国 原 奶 及 乳 制 品 质 量 安 全 管 理 研 究 Study on Quality and Safety Management of Raw Milk and Dairy Products in China 申 请 人 : 段 成 立 指 导 教 师 : 叶 志 华 研 究 员 张 蕙 杰 研 究 员 申 请

More information

124 第十三期 Conflicts in the Takeover of the Land in Taiwan after the Sino-Japanese War A Case in the Change of the Japanese Names of the Taiwanese Peopl

124 第十三期 Conflicts in the Takeover of the Land in Taiwan after the Sino-Japanese War A Case in the Change of the Japanese Names of the Taiwanese Peopl 123 戰後初期臺灣土地接收的糾紛 以更改日式姓名的臺人遭遇為例 124 第十三期 Conflicts in the Takeover of the Land in Taiwan after the Sino-Japanese War A Case in the Change of the Japanese Names of the Taiwanese People Abstract By Ho Fung-jiao

More information

% GIS / / Fig. 1 Characteristics of flood disaster variation in suburbs of Shang

% GIS / / Fig. 1 Characteristics of flood disaster variation in suburbs of Shang 20 6 2011 12 JOURNAL OF NATURAL DISASTERS Vol. 20 No. 6 Dec. 2011 1004-4574 2011 06-0094 - 05 200062 1949-1990 1949 1977 0. 8 0. 03345 0. 01243 30 100 P426. 616 A Risk analysis of flood disaster in Shanghai

More information

10 2011 7 Loess. And a suitable construction process on high energy level dynamic compaction combined with humidification operation in the northwest a

10 2011 7 Loess. And a suitable construction process on high energy level dynamic compaction combined with humidification operation in the northwest a 2011 7 7 154 JOURNAL OF RAILWAY ENGINEERING SOCIETY Jul 2011 NO. 7 Ser. 154 1006-2106 2011 07-0009 - 07 1 1 2 1 2 2 2 1. 102600 2. 730060 3% ~ 8% 8 500 kn m 10 000 kn m 15 000 kn m 15 000 kn m 15 000 kn

More information

THE APPLICATION OF ISOTOPE RATIO ANALYSIS BY INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER A Dissertation Presented By Chaoyong YANG Supervisor: Prof.D

THE APPLICATION OF ISOTOPE RATIO ANALYSIS BY INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER A Dissertation Presented By Chaoyong YANG Supervisor: Prof.D 10384 070302 9825042 UDC 2001.6. 2001.7. 20016 THE APPLICATION OF ISOTOPE RATIO ANALYSIS BY INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER A Dissertation Presented By Chaoyong YANG Supervisor: Prof.Dr. Xiaoru

More information

spss.doc

spss.doc SPSS 8 8.1 K-Means Cluster [ 8-1] 1962 1988 8-1 2 5 31 3 7 20 F2-F3 2 3 F3-F4 3 4 109 8 8-1 2 3 2 3 F2-F3 F3-F4 1962 344 3333 29 9 9.69 1.91 1963 121 1497 27 19 12.37 1.34 1964 187 1813 32 18 9.70 1.06

More information