1 Hans Journal of Civil Engineering 土木工程, 2014, 3, Published Online September 2014 in Hans. A Static Load Test of Bixi Bridge in Changshu Shijin Zhong 1, Jie Yu 2*, Wen Sun 3 1 Department of Civil Engineering, Xi an Jiaotong-Liverpool University, Suzhou 2 School of Civil Engineering, Southeast University, Nanjing 3 Jiangsu Fasten Material Analysis & Inspecting Co., Ltd., Jiangyin * @qq.com Received: Jul. 10 th, 2014; revised: Aug. 13 th, 2014; accepted: Aug. 22 nd, 2014 Copyright 2014 by authors and Hans Publishers Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). Abstract In order to test whether the construction quality of Bixi Bridge in Changshu meets the design requirements, and to ensure the safety of the bridge, the structure was analyzed and a static load test program was developed according to the design loads and the relevant specifications. Then the test data were analyzed. Test results showed that: the actual capacity and deformation of the bridge are consistent with the theoretical results. The strength and stiffness of the structure meet the design requirements. The stress moves back to zero well after unloading and the structure works are in an elastic state. The performance of the bridge meets the requirements of design and security operations. Keywords Bixi Bridge, Static Load Test, Stress, Displacement, Calibration Coefficient 常熟碧溪大桥静力荷载试验 仲时进 1, 于杰 2* 3, 孙文 1 西交利物浦大学土木工程系, 苏州 2 东南大学土木工程学院, 南京 3 江苏法尔胜材料分析测试有限公司, 江阴 * @qq.com 收稿日期 :2014 年 7 月 10 日 ; 修回日期 :2014 年 8 月 13 日 ; 录用日期 :2014 年 8 月 22 日 * 通讯作者 148

2 摘要 为了检验常熟碧溪大桥施工质量是否符合设计要求, 保证桥梁使用的安全性, 根据设计荷载和有关规范进行了结构分析, 制定了静载试验方案, 并对试验数据进行了分析 试验结果显示 : 大桥实际承载力及变形状态与理论计算基本吻合, 结构的强度和刚度满足设计要求, 卸载后回零良好, 结构工作时处于弹性状态, 桥梁工作性能满足设计和安全运营要求 关键词 碧溪大桥, 静载试验, 应力, 位移, 校验系数 1. 引言预应力混凝土矮塔斜拉桥是介于连续梁与斜拉桥之间的一种新桥型 与普通连续梁相比, 该桥型增加了斜拉索参与全桥受力 ; 但与一般斜拉桥不同, 其是主梁参与主要受力 [1]-[2] 为了掌握该类桥梁结构的承载能力及评价桥梁的运营质量, 有必要在通车前进行了荷载试验, 对桥塔 主梁及拉索进行全面检查 检验桥梁结构设计与施工质量 ; 验证桥梁结构设计理论和计算方法 ; 直接了解桥梁结构承载情况, 借以判断桥梁结构实际的承载能力 ; 积累科学技术资料, 充实与发展桥梁计算理论和施工技术 [3]-[6] 本文以常熟市碧溪大桥为工程背景, 通过静载试验结果分析, 确定试验桥的实际承载能力 2. 工程背景位于江苏省常熟市境内的碧溪大桥, 主桥为双塔双索面混凝土梁矮塔斜拉桥, 跨径布置为 m, 桥面宽 32 m 索塔为矩形截面, 索塔下部尺寸为 cm, 上部尺寸从 cm 变化到 cm, 为现浇钢筋混凝土结构 主塔为塔梁墩固接, 副塔为塔梁固接梁底设支座 主塔高从主梁顶面起算为 15.8 m, 主塔下部为等截面上部为变截面的现浇钢筋混凝土结构 主梁为双肋板式截面, 纵梁为 cm 现浇后张拉预应力混凝土结构 ; 横梁为变截面后张预应力混凝土结构, 两塔下部各集中设置三道, 其余部位每隔 5 m 设置一道 ; 桥面板为横向预应力混凝土板式结构, 分为机动车道板和非机动车道板, 机动车道板厚 30 cm, 非动车道板厚 15~40 cm 桥塔和主梁材料均为 C50 混凝土 斜拉索采用双索面扇形布置, 每个塔 7 对索, 全桥共 28 对 ; 斜拉索在梁底锚固, 在塔上采用分丝管型索鞍贯通 ; 斜拉索由环氧喷涂钢绞线组成, 单根钢绞线直径为 15.2 mm, 应力幅 250 Mpa, 标准强度为 1860 Mpa 大桥荷载等级 : 公路 -A 级, 人群荷载为 3.6kN/m2; 结构立面图如图 1 所示 3. 结构有限元分析计算在荷载试验前应用 MIDAS/CIVIL010 建立碧溪大桥空间杆系有限元模型 主塔和主梁采用空间梁单 Figure 1. The main bridge elevation of Bixi bridge 图 1. 碧溪大桥主桥立面图 149

3 元模拟, 主梁按照横截面面积和主梁纵向抗弯刚度等效原则等效到两个矩形主梁上, 以共节点的方式组成空间平面框架 斜拉索采用桁架单元进行模拟, 应用 Ernst 公式换算拉索弹性模量来考虑拉索的垂度效应影响 塔墩梁固结处采用梁单元共节点方式处理, 塔底固结处理, 塔梁固结 梁底设支座采用节点弹性连接方式模拟, 连接刚度按照支座实际约束刚度数据进行模拟 全桥计算模型共划分 365 个单元, 其中梁单元 309 个, 桁架单元 56 个 全桥整体分析主要材料计算参数根据实际情况采用表 1 中数据取值 全桥空间有限元模型如图 2 所示 根据设计荷载, 对于大桥进行了最不利荷载作用下的结构影响线分析 4. 主要测试项目与测点布置 为了测定大桥在最不利设计荷载作用下大桥主要各控制截面的应力和变形, 根据大桥设计等级和结构影响线分析结果, 碧溪大桥静载试验测试项目包括主梁控制截面挠度 主梁控制截面应力 斜拉索内力增量和结构温度场等 具体为索塔根部主梁截面 中跨四分点主梁截面 塔梁连接处索塔截面作为应力测试截面, 共 10 个应力测试截面, 如图 3 所示 主梁中跨四分点截面 边跨二分点截面作为位移测试点, 如图 4 所示 根据测试截面内力等效原则, 采用 6 辆 300 kn 三轴重车进行布载, 使测试控制截面的试验荷载效率满足检测规程的要求 试验前对所有试验车辆称重过磅, 以保证试验荷载效率在台理的范围内 表 2 给出了详细的试验工况 加载车辆布置 监测与主要观测项目 图 5 为试验车辆布置图 Table 1. The main calculation parameters of the finite element model 表 1. 结构有限元分析主要计算参数表 材料弹性模量 Mpa 泊松比线膨胀系数容重 kn/m 3 混凝土 3.45E E 斜拉索钢束 E E 预应力钢筋 1.95E E Figure 2. The main calculation parameters of the finite element model 图 2. 碧溪大桥空间有限元模型 Z9 Z10 Z2 Z8 Z3 Z4 Z1 Z5 Z6 Z7 Figure 3. Longitudinal arrangement of stress control section 图 3. 应力控制截面纵向布置示意图 150

4 跨中 B1 B2 B3 B4 B5 B6 B7 B8 B9 A1 A2 A3 A4 A5 A6 A7 A8 A9 Figure 4. The arrangement of displacement measuring point 图 4. 位移测点布置图 Table 2. A summary of the static load test and vehicle arrangement 表 2. 静载试验工况与车辆布置汇总表 工况号加载布置与车辆位置检验内容与主要观测项目效应系数 边跨跨中附近对称加载 4 辆车排成 1 行, 分布在 4 个车道, 横向对称布载 中跨四分点附近对称加载 6 辆车排成 2 行, 前后 3 辆, 横向对称加载 中跨跨中附近对称加载 6 辆车排成 2 行, 前后 3 辆, 车距缩小 8 m 中跨跨中附近偏向加载 4 辆车排成 2 行, 前后 2 辆, 车距与工况 3 相同 跨中最大正弯矩与挠度最不利位置边跨跨中截面应力与挠度 最大正弯矩与挠度最不利位置跨中截面应力与挠度 索塔应力 索力增量 跨中最大正弯矩与挠度最不利位置跨中截面应力与挠度 索塔应力 索力增量 跨中最大正弯矩与挠度最不利位置跨中截面应力与挠度 (a) 工况 1 横向对称布载示意图 5. 静载试验评价方法 (b) 工况 2 3 对称布载示意图 ( 单位 :mm) Figure 5. The sketch map of vehicle arrangement and symmetric loading (cases 1-3) 图 5. 工况 1~3 对称加载车辆布置示意图 ( 单位 :mm) 对于预应力混凝土桥梁, 主要通过实测结构的校验系数 ξ 和残余应变来反映桥梁结构的相关工作性能 : 1) 校验系数 ξ 实测结构的校验系数 ξ 是挠度或应力试验值与理论计算值之比, 他反映了结构的实际工作状态 实测应力实测挠度对于应力值 :ξ = ; 对于挠度值 : ξ = ; 理论应力理论挠度 实测结构校验系数是一个重要的评定指标, 可以从中判断桥梁的承载能力状况 当 ξ 1 时说明结构 151

5 的计算偏于安全, 结构的承载能力有一定的安全储备 应力校验系数越小, 说明主梁的强度贮备越高 ; 挠度校验系数越小, 说明主梁的刚度越好 2) 相对残余变位或应变根据量测数据可以计算弹性变位 残余变位或应变 设 : S i 加载前测试值 ; S I 加载后测试值, S u 卸载后测试值 则计算可得 : 总变位 ( 或总应变 ): S t = S I S i ; 弹性变位 ( 或弹性应变 ): S e = S I S u ; 残 S p 余变位 ( 或残余应变 ): S p = S t S e = S u S i ; 相对残余变位或应变 : S p = 100% S 如果相对残余变位或应变小, 说明主梁处于弹性工作状态 按规程要求, 相对残余变形应小于 20% 6. 试验结果分析 根据计算分析, 本次静载试验共进行 4 个工况, 挠度测点 18 个, 应力测点共 10 个截面共 64 个 其中主梁每个截面 8 个应力检测点, 每个塔截面 4 个应力检测点 试验结果表明 : 试验荷载作用下, 各试验桥跨测试截面的实测应力 挠度 斜拉索力小于计算值, 应力校验系数为 0.65~0.87 位移校验系数为 0.5~0.89 混凝土主梁结构应力的横向分布与计算值的横向分布相符 表 3 给出了主梁中跨主要控制截面 Z1 Z4 Z5 及塔梁连接处 Z3 截面主梁底板测试应力分析结果 表 4 给出了跨中对称加载工况下各个测点挠度测试数据分析 可以看出 : 各测试截面的应力校验系数均小于 1, 结构的承载能力满足正常使用的要求, 且有一定的安全储备 各挠度测试截面的挠度校验系数均小于 1, 结构的刚度满足设计的要求, 实际结构刚度大于理论计算刚度 中跨主梁截面下缘实测最大混凝土拉应力增量为 3.73 MPa 荷载卸除后, 残余应变较小, 最大实测相对残余应变为 4.2%, 小于检测规程限值 20% 7. 结语 通过静载试验实测结果与理论分析, 该桥的整体受力性能结论如下 : Table 3. The girder stress of the main control section in cross bridge 表 3. 跨中主要控制截面主梁底板测试应力分析 t 工况 截面测试值计算值相对校验系数 ( 梁底 ) (MPa) (MPa) 残余应变 工 Z % 况 Z % 1 Z % Z % 工 Z % 况 Z % 2 Z % Z % 工 Z % 况 Z % 3 Z % Z % 152

6 Table 4. The deflection data of symmetrical loading (case 3) in cross bridge 表 4. 跨中对称加载 ( 工况 3) 挠度测试数据分析 测点编号测试值 (mm) 理论值 (mm) 校验系数测点编号测试值 (mm) 理论值 (mm) 校验系数 A B A B A B A B A B A B A B A B A B ) 碧溪大桥试验桥跨结构经历了荷载效率为 0.82~0.93 静力试验加载, 试验加载过程中未出现异常现象, 试验桥跨测试截面结构受力正常 2) 在试验荷载作用下, 结构实际承载力及变形状态与理论计算基本吻合, 各测试项目在相应工况下校验系数在应力校验系数 0.65~0.87 之间, 位移校验系数处于 0.5~0.89 之间 说明结构的强度和刚度满足设计要求, 卸载后回零良好 3) 从桥梁应力 变形 索力等测试结果可知 : 实测结果与计算值吻合较好, 桥梁结构工作状况处于弹性范围, 结构实际强度 刚度和承载能力满足设计及规范要求, 桥梁工作性能满足设计和安全运营要求 基金项目江苏省交通厅重大项目 :(2011Y03-6), 江苏省自然基金项目 (BK ) 江苏省 333 高层次人才培养工程项目 参考文献 (References) [1] 缪长青, 王义春, 黎少华 (2012) 矮塔混凝土斜拉桥成桥索力优化. 东南大学学报, 3, [2] 王永安, 刘世同, 谭红梅, 肖汝诚 (2006) 斜拉桥索力优化理论研究. 公路, 5, [3] 郑平伟, 侍刚, 秦金环, 等 (2006) 渝怀线长寿长江大桥荷载试验研究. 桥梁建设, S1, [4] 宋一凡, 贺拴海 (2002) 公路桥粱荷载试验与结构评定. 人民交通出版社, 北京. [5] 王红霞, 何祖发, 侍刚 (2008) 阿深黄河特大桥静动载试验. 世界桥梁, 4, [6] 蔡登山, 党志杰 (2003) 军山长江公路大桥主桥静动力特性试验研究. 世界桥梁, 1,

m K K K K m Fig. 2 The plan layout of K K segment p

m K K K K m Fig. 2 The plan layout of K K segment p 410151 K7 + 914 - K7 + 984 12 5. 3 Midas DOI 10. 7617 /j. issn. 1000-8993. 2013. 09. 020 THE ANALYSIS OF THE DESIGN AND CONSTRUCTION SECURITY OF DEEP FOUNDATION IN PURUI TUNNEL OPEN-CUT SEGMENT Yang Ping

More information

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip * - 1 1 2 3 1. 100124 2. 100124 3. 210018 - ABAQUS - DOI 10. 13204 /j. gyjz201511033 EXPERIMENTAL STUDY AND THEORETICAL MODEL OF A NEW TYPE OF STEEL-LEAD DAMPING Shen Fei 1 Xue Suduo 1 Peng Lingyun 2 Ye

More information

标题

标题 第 48 卷 第 6 期 2 1 6 年 6 月 哈 尔 滨 工 业 大 学 学 报 JOURNAL OF HARBIN INSTITUTE OF TECHNOLOGY Vol 48 No 6 Jun. 216 doi:1.11918 / j.issn.367 6234.216.6.1 大 跨 度 楼 盖 结 构 在 运 动 荷 载 下 的 振 动 性 能 杨 维 国 1, 马 伯 涛 2, 宋 毛

More information

国有大型能源企业财务风险内部控制研究

国有大型能源企业财务风险内部控制研究 Frontiers of International Accounting 国 际 会 计 前 沿, 2012, 1, 1-5 http://dx.doi.org/10.12677/fia.2012.11001 Published Online June 2012 (http://www.hanspub.org/journal/fia) A Study of Internal Control of

More information

Ansys /4 Ansys % 9 60% MU10 M m 1 Fig. Actual situation of measured building 1 Fig. 1 First floor plan of typical r

Ansys /4 Ansys % 9 60% MU10 M m 1 Fig. Actual situation of measured building 1 Fig. 1 First floor plan of typical r 0 5 011 10 JOURNAL OF NATURAL DISASTERS Vol. 0 No. 5 Oct. 011 1004-4574 011 05-0018 - 06 1 3 1. 41008. 41008 3. 410000 7 0. 10g 7 0. 15g 3. 1% 5% P64. 3 A Field test and numerical simulations of seismic

More information

护国运动时期云南都督府的“拥护共和”奖功制度

护国运动时期云南都督府的“拥护共和”奖功制度 Open Journal of Historical Studies 历 史 学 研 究, 2016, 4(1), 1-8 Published Online January 2016 in Hans. http://www.hanspub.org/journal/ojhs http://dx.doi.org/10.12677/ojhs.2016.41001 Protection Republic Award

More information

定稿

定稿 第 31 卷 第 8 期 2014 年 8 月 机 电 工 程 Journal of Mechanical & Electrical Engineering Vol. 31 No. 8 Aug. 2014 DOI:10.3969/j.issn.1001-4551.2014.08.008 * 基 于 逆 向 技 术 的 骨 盆 环 三 维 重 构 与 结 构 分 析 1,2 田 卫 军, 李 郁 (1.

More information

国学思想与大学数学

国学思想与大学数学 Pure Mathematics 理 论 数 学, 2013, 3, 201-206 http://dx.doi.org/10.12677/pm.2013.33030 Published Online May 2013 (http://www.hanspub.org/journal/pm.html) Chinese Traditional Culture and College Mathematics

More information

43 14. 45 3 7 220 1 2 cm /s 2 1. 5 3 1 4 c d 1 /40 1 /4 1 /9 600 0. 129 6 7 1 /6 400 1 /256 000 1. 5 2 2 2. 1 /m /Hz /kn / kn m 6 6 0. 1 ~ 50 600 1 80

43 14. 45 3 7 220 1 2 cm /s 2 1. 5 3 1 4 c d 1 /40 1 /4 1 /9 600 0. 129 6 7 1 /6 400 1 /256 000 1. 5 2 2 2. 1 /m /Hz /kn / kn m 6 6 0. 1 ~ 50 600 1 80 43 14 2013 7 Building Structure Vol. 43 No. 14 Jul. 2013 * 1 1 1 2 3 3 3 2 2 1 100013 2 430022 3 200002 1 40 ETABS ABAQUS TU355 TU317 +. 1 A 1002-848X 2013 14-0044-04 Compairion study between the shaking

More information

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6 29 1 Vol129, No11 2008 2 Journal of Building Structures Feb1 2008 : 100026869 (2008) 0120075208, (, 350002) :, 3,,, ;, ; : ; ; ; ; : TU39819 TU31711 : A Experimental studies on concrete filled steel tubular

More information

输电线路智能监测系统通信技术应用研究

输电线路智能监测系统通信技术应用研究 Smart Grid 智 能 电 网, 2014, 4, 11-15 http://dx.doi.org/10.12677/sg.2014.41003 Published Online February 2014 (http://www.hanspub.org/journal/sg.html) Application Research of Communication Technology for

More information

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5 2011 6 6 153 JOURNAL OF RAILWAY ENGINEERING SOCIETY Jun 2011 NO. 6 Ser. 153 1006-2106 2011 06-0014 - 07 300142 ABAQUS 4. 287 mm 6. 651 mm U455. 43 A Analysis of Impact of Shield Tunneling on Displacement

More information

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm 33 2 2011 4 ol. 33 No. 2 Apr. 2011 1002-8412 2011 02-0104-08 1 1 1 2 361003 3. 361009 3 1. 361005 2. GB50023-2009 TU746. 3 A Study on Single-span RC Frame Reinforced with Steel Truss System Yuan Xing-ren

More information

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土 第 34 卷 增 刊 岩 土 工 程 学 报 Vol.34 Supp. 202 年. 月 Chinese Journal of Geotechnical Engineering Nov. 202 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 谢 小 林 2 2, 翟 杰 群, 张 羽, 杨 科, 郭 晓 航, 贾 坚 (. 同 济 大 学 建 筑 设 计 研 究 院 (

More information

Mnq 1 1 m ANSYS BEAM44 E0 E18 E0' Y Z E18' X Y Z ANSYS C64K C70C70H C /t /t /t /mm /mm /mm C64K

Mnq 1 1 m ANSYS BEAM44 E0 E18 E0' Y Z E18' X Y Z ANSYS C64K C70C70H C /t /t /t /mm /mm /mm C64K 25 4 Vol. 25 No. 4 2012 12 JOURNAL OF SHIJIAZHUANG TIEDAO UNIVERSITY NATURAL SCIENCE Dec. 2012 1 2 1 2 3 4 1 2 1. 050043 2. 050043 3. 3300134. 450052 ANSYS C80 C80 125 ac70 0 U24 A 2095-0373201204-0017-06

More information

01-0982.doc

01-0982.doc 第 32 卷 第 7 期 岩 土 工 程 学 报 Vol.32 No.7 2010 年 7 月 Chinese Journal of Geotechnical Engineering July 2010 沿 海 碎 石 回 填 地 基 上 高 能 级 强 夯 系 列 试 验 对 比 研 究 年 廷 凯 1,2, 水 伟 厚 3, 李 鸿 江 4, 杨 庆 1,2, 王 玉 立 (1. 大 连 理 工

More information

Rupture Index 12 4 a SPB C - 1 b SPB C Fig. 1 Model dimension 1 2 Fig. 2 Position of welding seam Fig s Temperature distrib

Rupture Index 12 4 a SPB C - 1 b SPB C Fig. 1 Model dimension 1 2 Fig. 2 Position of welding seam Fig s Temperature distrib * 1 1 2 1 1. 266033 2. 266071 DOI 10. 7617 /j. issn. 1000-8993. 2013. 08. 026 EFFECT OF WELD BETWEEN SIDE-PLATE AND BEAM FLANGE ON THE BRITTLE FRACTURE OF SIDE-PLATE REINFORCED JOINT Liu Yun 1 Wang Yan

More information

一次辽宁暴雨过程的诊断及风场反演分析

一次辽宁暴雨过程的诊断及风场反演分析 Climate Change Research Letters 气 候 变 化 研 究 快 报, 2013, 2, 139-146 http://dx.doi.org/10.12677/ccrl.2013.24024 Published Online October 2013 (http://www.hanspub.org/journal/ccrl.html) Analysis of the Diagnosis

More information

) ( ) 2008 (300m ) 1 FRP [1 ] FRP 3 FRP FRP (CFRP) FRP CFRP (fiber reinforced polymer FRP) 60 % 160MPa 2400MPa [2 ] FRP 1 2mm FRP FRP 1 FRP C

) ( ) 2008 (300m ) 1 FRP [1 ] FRP 3 FRP FRP (CFRP) FRP CFRP (fiber reinforced polymer FRP) 60 % 160MPa 2400MPa [2 ] FRP 1 2mm FRP FRP 1 FRP C 28 4 Vol128 No14 2007 8 Journal of Building Structures Aug12007 :100026869 (2007) 0420109208 FRP ( 100084) : (FRP) FRP FRP FRP FRP FRP 5 : (FRP) ; ; ; ; :TU383 :A Concepts forms and basic analysis of FRP

More information

Microsoft Word - ED-774.docx

Microsoft Word - ED-774.docx journal.newcenturyscience.com/index.php/gjanp Global Journal of Advanced Nursing Practice,214,Vol.1,No.1 The practicality of an improved method of intravenous infusion exhaust specialized in operating

More information

3 PC not suitable for this kind of bridge. 3 Considering the shear deformation of the CSWs the correction formulas are obtained for the PC box girder

3 PC not suitable for this kind of bridge. 3 Considering the shear deformation of the CSWs the correction formulas are obtained for the PC box girder 2016 3 3 210 Mar 2016 JOURNAL OF RAILWAY ENGINEERING SOCIETY NO. 3 Ser. 2016 210 3 1006-2106 2016 03-0060 - 05 PC 1 2 1 1 1. 7070 2. 410082 PC PC 1 10 3 + 3 m PC ANSYS 1 PC 2 JTG D60 2015 3 PC 4 PC U448.

More information

左下肢多发软组织肿瘤二次术后复发伴梗阻性黄疸一例诊治

左下肢多发软组织肿瘤二次术后复发伴梗阻性黄疸一例诊治 Asian Case Reports in Oncology 亚 洲 肿 瘤 科 病 例 报 告, 2014, 3, 1-5 http://dx.doi.org/10.12677/acrpo.2014.31001 Published Online January 2014 (http://www.hanspub.org/journal/acrpo.html) Diagnosis and Treatment

More information

/MPa / kg m - 3 /MPa /MPa 2. 1E ~ 56 ANSYS 6 Hz (a) 一阶垂向弯曲 (b) 一阶侧向弯曲 (c) 一阶扭转 (d) 二阶侧向弯曲 (e) 二阶垂向弯曲 (f) 弯扭组合 2 6 Hz

/MPa / kg m - 3 /MPa /MPa 2. 1E ~ 56 ANSYS 6 Hz (a) 一阶垂向弯曲 (b) 一阶侧向弯曲 (c) 一阶扭转 (d) 二阶侧向弯曲 (e) 二阶垂向弯曲 (f) 弯扭组合 2 6 Hz 31 3 Vol. 31 No. 3 218 9 Journal of Shijiazhuang Tiedao University Natural Science Edition Sep. 218 1 1 2 1 2 1 1. 543 2. 543 U462. 3 217-2 - 16 A 295-373 218 3-63 - 6 1-4 5-7 8-11 1 11 11 398 mm 86 mm

More information

12-1b T Q235B ML15 Ca OH Table 1 Chemical composition of specimens % C Si Mn S P Cr Ni Fe

12-1b T Q235B ML15 Ca OH Table 1 Chemical composition of specimens % C Si Mn S P Cr Ni Fe * - - 100084 Q235B ML15 Ca OH 2 DOI 10. 13204 /j. gyjz201508023 STUDY OF GALVANIC CORROSION SENSITIVITY BETWEEN ANY COUPLE OF STUD WELDMENT OR BEAM Lu Xinying Li Yang Li Yuanjin Department of Civil Engineering

More information

~ ~ Y 3 X / / mm 400 ~ 700 C40 ~ C ~ 400 C40 ~ C ~

~ ~ Y 3 X / / mm 400 ~ 700 C40 ~ C ~ 400 C40 ~ C ~ 43 7 2013 4 Building Structure Vol. 43 No. 7 Apr. 2013 518038 TU398 +. 2 A 1002-848X 2013 07-0059-06 Discussion on inclined column design of a super high-rise building Zhang Lin Zhang Delong Shenzhen CAPOL

More information

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva 39 6 2011 12 Journal of Fuzhou University Natural Science Edition Vol 39 No 6 Dec 2011 DOI CNKI 35-1117 /N 20111220 0901 002 1000-2243 2011 06-0923 - 07 350108 105 m 14 69% TU311 3 A Seismic analysis of

More information

标题

标题 第 46 卷 第 12 期 2 0 1 4 年 12 月 哈 尔 滨 工 业 大 学 学 报 JOURNAL OF HARBIN INSTITUTE OF TECHNOLOGY Vol 46 No 12 Dec. 2014 装 配 式 混 凝 土 双 板 短 肢 剪 力 墙 拟 静 力 试 验 肖 全 东, 郭 正 兴 ( 东 南 大 学 土 木 工 程 学 院, 210096 南 京 ) 摘 要

More information

ANSYS WF 1 WF 2 2 SP 1 SP 2 1 NBF 1 1 Fig. 1 1 Connection details of specimens 1 Table 1 Specimen s

ANSYS WF 1 WF 2 2 SP 1 SP 2 1 NBF 1 1 Fig. 1 1 Connection details of specimens 1 Table 1 Specimen s 27 4 2011 12 WORLD EARTHQUAKE ENGINEERING Vol. 27 No. 4 Dec. 2011 1007 6069 2011 04 0102 07 1 2 2 1. 710055 2. 266033 4 1 2 ANSYS 2 U442. 5 + 5 A Study on seismic behavior of widened beam flange connections

More information

11 25 stable state. These conclusions were basically consistent with the analysis results of the multi - stage landslide in loess area with the Monte

11 25 stable state. These conclusions were basically consistent with the analysis results of the multi - stage landslide in loess area with the Monte 211 11 11 158 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 211 NO. 11 Ser. 158 16-216 211 11-24 - 6 1 2 3 3 3 1. 126 2. 92181 74 3. 181 1 2 3 4 1. 27 1. 3 1. 56 1. 73 4 1 2 3 4. 96 1. 15 1. 48 1. 6 f s =

More information

中華民國 第51屆中小學科學展覽會

中華民國 第51屆中小學科學展覽會 中 華 民 國 第 51 屆 中 小 學 科 學 展 覽 會 作 品 說 明 書 國 小 組 物 理 科 第 三 名 080115 問 水 哪 得 高 如 許? 為 有 熱 源 伴 水 來 學 校 名 稱 : 桃 園 縣 龍 潭 鄉 三 坑 國 民 小 學 作 者 : 指 導 老 師 : 小 六 陳 嬿 云 黃 啟 晉 小 六 張 婉 怡 關 鍵 詞 : 熱 脹 冷 縮 模 擬 燃 燒 影 響 力

More information

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified 30 1 2013 1 Journal of Highway and Transportation Research and Development Vol. 30 No. 1 Jan. 2013 doi 10. 3969 /j. issn. 1002-0268. 2013. 01. 004 1 2 2 2 2 1. 400074 2. 400067 240 U416. 217 A 1002-0268

More information

1. 前 言 由 於 石 油 價 格 浮 動, 汽 油 價 格 節 節 高 升 及 二 氧 化 碳 等 廢 棄 大 量 排 放 造 成 全 球 環 境 的 改 變, 因 此 世 界 各 國 都 極 力 提 倡 節 能 減 碳 進 而 掀 起 腳 踏 車 城 市 的 風 潮 因 應 目 前 自 行 車

1. 前 言 由 於 石 油 價 格 浮 動, 汽 油 價 格 節 節 高 升 及 二 氧 化 碳 等 廢 棄 大 量 排 放 造 成 全 球 環 境 的 改 變, 因 此 世 界 各 國 都 極 力 提 倡 節 能 減 碳 進 而 掀 起 腳 踏 車 城 市 的 風 潮 因 應 目 前 自 行 車 JHGT-18.2(158) (2011-07) 華 岡 紡 織 期 刊 第 十 八 卷 第 二 期 ISSN 1025-9678 不 同 吸 濕 排 汗 織 物 應 用 於 自 行 車 衣 之 研 究 Study of Wicking Fabrics Used in Different Research Bicycle clothing 摘 要 曾 冠 臺, 李 貴 琪, * 游 輝 仁 G. T.

More information

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0067 - 06 1 2 ( 1. 苏 州 设 计 研 究 院 股 份 有 限 公 司, 江 苏 苏 州 215021; 2. 苏 州 市 消 防 支 队, 江 苏 苏 州 215021) 1 2 3 4

More information

4 155 earthquake resilient structure 1 Yahya Kurama 2 Bulent Erkmen 3 Jose Restrepo 4 Brian Smith C40 HRB mm mm 125 mm 2

4 155 earthquake resilient structure 1 Yahya Kurama 2 Bulent Erkmen 3 Jose Restrepo 4 Brian Smith C40 HRB mm mm 125 mm 2 34 4 2014 8 EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS Vol. 34 No. 4 Aug. 2014 1000-1301 2014 04-0154 - 08 DOI 10. 13197 /j. eeev. 2014. 04. 154. dangxl. 020 200092 TU375 P315. 92 A Experimental study

More information

第1期 339 蒋友宝 等 钢筋混凝土拱肋破坏过程中的模态变化 非破坏性荷载试验 根据测得的响应反推算出结构参 数 然后进行结构分析来估计承载能力[3 5] 或者通过 现场实测出影响桥梁承载能力各因素的量值 如钢筋 锈蚀程度等 按照模糊数学和层次分析方法来推算承 载能力[6 7] 以上 2 种评估方

第1期 339 蒋友宝 等 钢筋混凝土拱肋破坏过程中的模态变化 非破坏性荷载试验 根据测得的响应反推算出结构参 数 然后进行结构分析来估计承载能力[3 5] 或者通过 现场实测出影响桥梁承载能力各因素的量值 如钢筋 锈蚀程度等 按照模糊数学和层次分析方法来推算承 载能力[6 7] 以上 2 种评估方 第 43 卷 第 1 期 中 南 大 学 学 报 ( 自 然 科 学 版 ) Vol.43 No.1 2012 年 1 月 Journal of Central South University (Science and Technology) Jan. 2012 钢 筋 混 凝 土 拱 肋 破 坏 过 程 中 的 模 态 变 化 1, 蒋 友 宝 2, 刘 扬 2, 张 建 仁 2 (1. 长 沙

More information

北京工业大学硕士学位论文弯桥理论的探讨及其支承体系的研究姓名 : 赵辉申请学位级别 : 硕士专业 : 桥梁与隧道工程指导教师 : 徐贺文 20070501 弯桥理论的探讨及其支承体系的研究 作者 : 赵辉 学位授予单位 : 北京工业大学 相似文献 (3 条 ) 1. 期刊论文谭万忠.

More information

708 北 京 工 业 大 学 学 报 2011 年 以 往 的 试 验 结 果 进 行 对 比, 选 取 15D 20D 作 为 对 比 参 数, 试 件 参 数 见 表 1. Fig. 1 图 1 试 件 尺 寸 及 配 筋 图 ( mm) Geometry and reinforcement

708 北 京 工 业 大 学 学 报 2011 年 以 往 的 试 验 结 果 进 行 对 比, 选 取 15D 20D 作 为 对 比 参 数, 试 件 参 数 见 表 1. Fig. 1 图 1 试 件 尺 寸 及 配 筋 图 ( mm) Geometry and reinforcement 第 37 卷 第 5 期 2011 年 5 月 北 京 工 业 大 学 学 报 JOURNAL OF BEIJING UNIVERSITY OF TECHNOLOGY Vol. 37 No. 5 May 2011 植 筋 钢 筋 混 凝 土 锚 固 构 件 抗 震 性 能 试 验 研 究 邓 宗 才 1, 钟 林 杭 1, 张 永 方 1, 曾 洪 超 1 2, 范 世 平 ( 1. 北 京 工 业

More information

Microsoft Word - 793-797 tb20150504赵宏宇s-高校教改纵横.doc

Microsoft Word - 793-797 tb20150504赵宏宇s-高校教改纵横.doc 微 生 物 学 通 报 Microbiology China tongbao@im.ac.cn Apr. 20, 2016, 43(4): 793 797 http://journals.im.ac.cn/wswxtbcn DOI: 10.13344/j.microbiol.china.150504 高 校 教 改 纵 横 生 物 工 程 专 业 发 酵 课 程 群 建 设 探 索 * 赵 宏 宇

More information

x n 1 L - 1 L EX = 1 L L-1 x n a m m = 0 1 M - 1 M Wa i = M-1 a m m = 0 b n 1 N - 1 N Wb i = N-1 b n b n c n 1 N - 1 k Wc i = N-1 c

x n 1 L - 1 L EX = 1 L L-1 x n a m m = 0 1 M - 1 M Wa i = M-1 a m m = 0 b n 1 N - 1 N Wb i = N-1 b n b n c n 1 N - 1 k Wc i = N-1 c 第 10 卷第 3 期 01 年 9 月 Journal of Nanjing Institute of TechnologyNatural Science Edition Vol 10,No 3 Sep,01 167-5580103 - 0050-05 1 ( 1 南京工程学院车辆工程系, 江苏南京 11167; 南京康尼机电股份有限公司精密锻造分公司, 江苏南京 10038) 列车自动门振动谱是实施列车自动门振动可靠性实验的基本条件

More information

0 Kelly Fig. 1 Novel damping wall-structure connection diagram a b S1 c S Fig. 2 Desig

0 Kelly Fig. 1 Novel damping wall-structure connection diagram a b S1 c S Fig. 2 Desig DOI:10.14006/j.jzjgxb.2013.12.007 Journal of Building Structures 1000-6869 2013 12-0045-07 34 12 2013 12 006 Vol. 34 No. 12 Dec. 2013 510405 6% Bouc-Wen Bouc-Wen TU352. 1 TU317. 1 A Performance of novel

More information

Microsoft Word - GJPHV3N2-4.doc

Microsoft Word - GJPHV3N2-4.doc On comprehensive prevention and control strategies of hand foot mouth disease Zhao-min Yang Center for Disease Control and Prevention of Shangluo City, Shangluo, Shanxi, China Received: Jul 08, 2016 Accepted:

More information

m m m

m m m * 610034 DOI 10. 13204 /j. gyjz201511010 RESEARCH ON CHENGDU MODERN INDUSTRIAL ARCHITECTURAL HERITAGE Li Yunzhang Lu Liyang College of Architecture and Environment Sichuan University Chengdu 610034 China

More information

5 9 T m /31 / T r 1 /1 s - 1 AC - C Johnson-Cook. 1 JC 1 mm mm 1 MTS 1 7 # NES % 1 Tab. 1 AC - C AC - C gradation /mm

5 9 T m /31 / T r 1 /1 s - 1 AC - C Johnson-Cook. 1 JC 1 mm mm 1 MTS 1 7 # NES % 1 Tab. 1 AC - C AC - C gradation /mm 9 1 Vol. 9 No. 1 1 JOURNAL OF CHONGQING JIAOTONG UNIVERSITY NATURAL SCIENCE Feb. 1 Johnson-Cook 1 1 1 1 1. 7. 7 Johnson-Cook Johnson-Cook ANSYS % Johnson-Cook Johnson-Cook U1. 17 A 17-9 1 1-9 - 5 Rutting

More information

第 17 卷第 1 期 2018 年 3 月 南通航运职业技术学院学报 南通航运职业技术学院学报 JOURNAL OF NANTONG VOCATIONAL & TECHNICAL SHIPPING COLLEGE Vol.17 No 年 Mar doi: /

第 17 卷第 1 期 2018 年 3 月 南通航运职业技术学院学报 南通航运职业技术学院学报 JOURNAL OF NANTONG VOCATIONAL & TECHNICAL SHIPPING COLLEGE Vol.17 No 年 Mar doi: / 第 17 卷第 1 期 218 年 3 月 南通航运职业技术学院学报 南通航运职业技术学院学报 JOURNAL OF NANTONG VOCATIONAL & TECHNICAL SHIPPING COLLEGE Vol.17 No.1 218 年 Mar. 218 doi: 1.3969/j.issn.1671-9891.218.1.8 半潜式钻井平台甲板极限强度有限元分析 夏 苏 上海交通大学

More information

m m m ~ mm

m m m ~ mm 2011 10 10 157 JOURNAL OF RAILWAY ENGINEERING SOCIETY Oct 2011 NO. 10 Ser. 157 1006-2106 2011 10-0007 - 0124-05 710043 6 TBM TBM U455. 43 A Structural Calculation and Analysis of Transfer Node of Three

More information

心理学译名:原则与方法

心理学译名:原则与方法 Advances in Psychology 心 理 学 进 展, 2013, 3, 147-152 http://dx.doi.org/10.12677/ap.2013.33024 Published Online May 2013 (http://www.hanspub.org/journal/ap.html) Terminology Translation in Psychology: Principles

More information

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec 31 6 2011 12 JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec. 2011 1000-1301 2011 06-0159 - 08 1 1 1 1 2 1. 150080 2. 100124 1 2 3 P315. 93 TU 43 TU41 A Shaking table test

More information

dl t i = CT Lij V = n l ij v - 1 j j = 1 t L ij CT v 4 1 CT BCT BridgeCT 196km m 44. 5km % E Vp = 槡 ρ CT R b = 0.

dl t i = CT Lij V = n l ij v - 1 j j = 1 t L ij CT v 4 1 CT BCT BridgeCT 196km m 44. 5km % E Vp = 槡 ρ CT R b = 0. 12 39 CT 1 2 3 1. 067000 2. 067000 3. 100191 CT CT CT CT U446 B 1673-6052 2011 12-0039 - 04 2000 24 2003 31 2009 62 6 5 57 13 23% 2003 50% 20% ~ 30% CT 2001 CT 2004 CT 16 CT 2006 CT BCT BridgeCT T CT 40

More information

果葡糖浆中5-HMF生成影响因素及其去除方法

果葡糖浆中5-HMF生成影响因素及其去除方法 Journal of Advances in Physical Chemistry 物 理 化 学 进 展, 2013, 2, 27-32 http://dx.doi.org/10.12677/japc.2013.23005 Published Online August 2013 (http://www.hanspub.org/journal/japc.html) Influencing Factors

More information

10.11648.j.sd.20160403.18

10.11648.j.sd.20160403.18 Science Discovery 2016; 4(3): 202-206 http://www.sciencepublishinggroup.com/j/sd doi: 10.11648/j.sd.20160403.18 ISSN: 2331-0642 (Print); ISSN: 2331-0650 (Online) Construction for the Engineering Application-Oriented

More information

<4D6963726F736F667420576F7264202D20C8EDCDC1B5D8BBF9CDB2BBF9CAD4B2C9C6BDCCA8B5C4CACAD3C3D0D4B7D6CEF6>

<4D6963726F736F667420576F7264202D20C8EDCDC1B5D8BBF9CDB2BBF9CAD4B2C9C6BDCCA8B5C4CACAD3C3D0D4B7D6CEF6> 第 47 卷 第 2 期 西 安 建 筑 科 技 大 学 学 报 ( 自 然 科 学 版 ) Vol. 47 No.2 2015 年 4 月 J. Xi'an Univ. of Arch. & Tech. (Natural Science Edition) Apr. 2015 DOI:10.15986/j.1006-7930.2015.02.016 软 土 地 基 筒 基 试 采 平 台 的 适 用

More information

220 Key words: assembled monolithic concrete shear walls; precast two-way hollow slab; inner joint; slit wall; shear behavior 3 ~ % 80% [1] [

220 Key words: assembled monolithic concrete shear walls; precast two-way hollow slab; inner joint; slit wall; shear behavior 3 ~ % 80% [1] [ 30 7 Vol.30 No.7 2013 7 July 2013 ENGINEERING MECHANICS 219 1000-4750(2013)07-0219-11 1 1 1 2 1 1 (1. 264005 2. 100084) 1 5 TU391; TU392.5 A doi: 10.6052/j.issn.1000-47513.01.0026 EXPERIMENTAL STUDY ON

More information

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C Journal of Building Structures 1000-6869 2011 06-0010-08 32 6 2011 6 Vol. 32 No. 6 June 2011 002 200092 14 1 /15 7 7 7 8 MIDAS 7 TU973 TU317. 1 A Seismic performance of multi-tower structure with large

More information

我国高速公路建设管理现状和主要问题

我国高速公路建设管理现状和主要问题 Modern Management 现 代 管 理, 2012, 2, 24-28 http://dx.doi.org/10.12677/mm.2012.21005 Published Online January 2012 (http://www.hanspub.org/journal/mm) China Highway Current Situation and Problem of Construction

More information

Vol. 22 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug GPS,,, : km, 2. 51, , ; ; ; ; DOI: 10.

Vol. 22 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug GPS,,, : km, 2. 51, , ; ; ; ; DOI: 10. 22 4 2017 8 Vol. 22 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug. 2017 150080 GPS,,, : 27. 36 km, 2. 51, 110. 43, ; ; ; ; DOI: 10. 15938 /j. jhust. 2017. 04. 015 U469. 13 A 1007-2683

More information

动力厂安全规程

动力厂安全规程 安 钢 动 力 厂 岗 位 安 全 操 作 规 程 2015 年 10 月 目 录 1. 通 用 部 分.. 1 2. 变 配 电 工 3 3. 电 气 维 检 工 4 4. 锅 炉 运 行 工 6 5. 化 学 分 析 工 7 6. 化 学 水 工 8 7. 混 合 加 压 工 10 8. 管 道 工 11 9. 机 械 维 检 工 14 10. 电 焊 工. 16 11. 安 装 起 重 工.

More information

79 PKPM2010 /SATWE Midas Civil 7. 80 2 3 K 5-7 2 mm 1 15 32 12 m 2 1 2 3 135 kn / m 24. 3 kn /m 2 ZK 4 1 200 kn /1. 6 m 200 /1. 6 /5. 55 = 22. 52 kn /

79 PKPM2010 /SATWE Midas Civil 7. 80 2 3 K 5-7 2 mm 1 15 32 12 m 2 1 2 3 135 kn / m 24. 3 kn /m 2 ZK 4 1 200 kn /1. 6 m 200 /1. 6 /5. 55 = 22. 52 kn / 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0078 - 04 ( 中 信 建 筑 设 计 研 究 总 院 有 限 公 司, 武 汉 430014) 1 2 U24 A Comparison between Railway Codes and Building

More information

<4D6963726F736F667420576F7264202D20B9DCC0EDD6C6B6C8BBE3B1E0B5DAB6FEB8E5>

<4D6963726F736F667420576F7264202D20B9DCC0EDD6C6B6C8BBE3B1E0B5DAB6FEB8E5> 土 木 工 程 防 灾 国 家 重 点 实 验 室 ( 同 济 大 学 ) STATE KEY LABORATORY OF DISASTER REDUCTION IN CIVIL ENGINEERING, TONGJI UNIVERSITY 管 理 制 度 汇 编 土 木 工 程 防 灾 国 家 重 点 实 验 室 ( 同 济 大 学 ) 目 录 国 家 重 点 实 验 室 建 设 与 运 行 管

More information

适 用 性 甚 至 安 全 性 造 成 威 胁 [2] 因 振 动 过 度 导 致 的 事 故 时 有 发 生 2000 年, 伦 敦 千 禧 桥 由 于 行 人 行 走 时, 结 构 产 生 了 大 幅 振 动, 在 对 外 开 放 仅 两 天 后 就 被 迫 关 闭 [] ; 2011 年, 韩

适 用 性 甚 至 安 全 性 造 成 威 胁 [2] 因 振 动 过 度 导 致 的 事 故 时 有 发 生 2000 年, 伦 敦 千 禧 桥 由 于 行 人 行 走 时, 结 构 产 生 了 大 幅 振 动, 在 对 外 开 放 仅 两 天 后 就 被 迫 关 闭 [] ; 2011 年, 韩 * 远 大 小 天 城 楼 盖 人 致 振 动 舒 适 度 实 测 及 研 究 1 舒 兴 平 1 廖 荣 庭 2 卢 倍 嵘 ( 1. 湖 南 大 学 土 木 工 程 学 院 钢 结 构 研 究 所, 长 沙 410082; 2. 湖 南 科 技 大 学 土 木 工 程 学 院, 湖 南 湘 潭 411201) 摘 要 : 对 远 大 小 天 城 中 的 新 型 预 制 装 配 式 集 成 楼 盖

More information

2 49 30667. 7m 2, 424008m 2,,,, 20. 5m,, 4. 6 m 2 3, - 14. 5m, 87200m 2,, ( ) Leoadaly 1 C40, 2200mm 2650mm, 30m, 49000kN 71000kN, 193m, 156m,,, 2 1,

2 49 30667. 7m 2, 424008m 2,,,, 20. 5m,, 4. 6 m 2 3, - 14. 5m, 87200m 2,, ( ) Leoadaly 1 C40, 2200mm 2650mm, 30m, 49000kN 71000kN, 193m, 156m,,, 2 1, 11 2 2009 4 Progress in Steel Building Structures Vol. 11 No. 2 Apr. 2009 1, 1, 1, 1, 1, 1, 2 (1. ( ), 518033 ; 2., 518031) : 238m, 260m, 17. 3, B,,, : ; ; ; ; : TU 355 : A : 1671-9379 (2009) 02-0048 -

More information

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378>

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378> 高 拱 坝 坝 踵 应 力 实 测 与 计 算 结 果 差 异 原 因 分 析 张 国 新 周 秋 景 ( 中 国 水 利 水 电 科 学 研 究 院, 北 京 100038) 摘 要 : 坝 踵 应 力 是 关 系 到 混 凝 土 坝 是 否 开 裂 和 安 全 的 一 个 重 要 指 标, 不 管 是 用 结 构 力 学 法 还 是 有 限 元 法 都 能 计 算 出 坝 踵 有 一 定 的 拉

More information

中交演示文稿1

中交演示文稿1 公路桥梁检测 评估 加固 标准化技术 中交路桥技术有限公司 让世界更畅通 鲍卫刚 夏兴佳 目 录 1 概述 目录 Content 5 2 3 4 检测方法 检测手段的标准化桥梁技术状况评定与承载能力评估方法的标准化桥梁维修加固方法的标准化 结语与展望 目 录 1 概述 目录 Content 5 2 3 4 检测方法 检测手段的标准化桥梁技术状况评定与承载能力评估方法的标准化桥梁维修加固方法的标准化

More information

第 29 卷第 9 期 Vol. 29 NO. 9 重庆工商大学学报 ( 自然科学版 ) J Chongqing Technol Business Univ. Nat Sci Ed Sept X * ABAQUS 1 2

第 29 卷第 9 期 Vol. 29 NO. 9 重庆工商大学学报 ( 自然科学版 ) J Chongqing Technol Business Univ. Nat Sci Ed Sept X * ABAQUS 1 2 第 29 卷第 9 期 Vol. 29 NO. 9 重庆工商大学学报 ( 自然科学版 ) J Chongqing Technol Business Univ. Nat Sci Ed 2012 9 Sept. 2012 1672-058X 2012 09-0076 - 06 * ABAQUS 1 2 1 2 1 2 1. 400074 2. 400074 初始地应力是岩土工程数值模拟时必需考虑的重要因素,

More information

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y * 35 4 2011 7 Vol. 35 No. 4 July 2011 3 Population Research 1950 ~ 1981 The Estimation Method and Its Application of Cohort Age - specific Fertility Rates Wang Gongzhou Hu Yaoling Abstract Based on the

More information

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal 5.12 5.12 100 cm 60 cm 5.12 TV641.4P631.4 A 10004548(2008)06079507 1962 E-mail: sschen@nhri.cn Analysis of effects of 5.12 Wenchuan Earthquake on Zipingpu Concrete Face Rock-fill Dam CHEN Sheng-shuiHUO

More information

基于因子分析的敦煌莫高窟游客满意度研究

基于因子分析的敦煌莫高窟游客满意度研究 Geographical Science Research 地 理 科 学 研 究, 2012, 1, 56-61 http://dx.doi.org/10.12677/gser.2012.13007 Published Online November 2012 (http://www.hanspub.org/journal/gser.html) The Study of Dunhuang Mogao

More information

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut 60 2 2016 2 RAILWAY STANDARD DESIGN Vol. 60 No. 2 Feb. 2016 1004-2954201602-0071-06 BIM 1 1 2 2 1 1. 7140992. 710054 BIM BIM 3D 4D nd BIM 1 3D 4D Revit BIM BIM U442. 5TP391. 72 A DOI10. 13238 /j. issn.

More information

2013-03

2013-03 101 文 章 编 号 :1006-1355(2013)03-0101-05 高 速 列 车 车 体 结 构 振 动 和 车 内 声 学 特 性 分 析 刘 太 祥, 龚 兴 龙, 宗 路 航, 宣 守 虎 ( 中 国 科 学 技 术 大 学 近 代 力 学 系 中 国 科 学 院 材 料 力 学 行 为 与 设 计 重 点 实 验 室, 合 肥 230027) 摘 要 : 为 了 研 究 高 速

More information

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~ PSB830 365000 32 mm PSB830 PSB830 TG 335 64 A Productive Practition of PSB830 Finishing Rolled Rebars PAN Jianzhou Bar Steel Rolling Minguang Co Ltd of Fujian Sansteel Sanming 365000 China Abstract High

More information

中 国 药 事 2016 年 7 月 第 30 卷 第 7 期 709 体 外 诊 断 试 剂 是 指 用 生 物 化 学 免 疫 学 微 生 物 学 分 子 生 物 学 等 原 理 或 方 法 制 备, 在 体 外 用 于 对 人 体 疾 病 的 诊 断 筛 查 或 监 测 及 流 行 病 学 调

中 国 药 事 2016 年 7 月 第 30 卷 第 7 期 709 体 外 诊 断 试 剂 是 指 用 生 物 化 学 免 疫 学 微 生 物 学 分 子 生 物 学 等 原 理 或 方 法 制 备, 在 体 外 用 于 对 人 体 疾 病 的 诊 断 筛 查 或 监 测 及 流 行 病 学 调 708 中 国 药 事 2016 年 7 月 第 30 卷 第 7 期 医 院 药 事 2010-2015 年 北 京 医 院 体 外 诊 断 试 剂 采 购 情 况 及 管 理 模 式 探 讨 田 晓 鑫, 刘 蕾 *, 穆 林 ( 北 京 医 院 药 学 部, 北 京 100730) 摘 要 目 的 : 对 我 院 体 外 诊 断 试 剂 采 购 情 况 进 行 评 价 与 分 析, 对 使 用

More information

Hewes Billington Palermo Pampanin mm 180 mm 1240 mm mm 240 mm 7. 5 C40 10 mm HRB3

Hewes Billington Palermo Pampanin mm 180 mm 1240 mm mm 240 mm 7. 5 C40 10 mm HRB3 30 4 JOURNAL OF VIBRATION AND SHOCK Vol. 30 No. 4 2011 1 2 3 1. 361005 2. 200235 3. 361008 P315. 5 U442. 5 + A Pseudo static test for pre-cast segmental bridge columns with dry joints GAO Jing 1 GE Ji-ping

More information

FZ1.s92

FZ1.s92 第 一 章 服 装 制 作 工 艺 基 础 知 识 第 一 节 服 装 术 语 服 装 术 语 是 服 装 技 术 专 用 语, 如 服 装 的 每 一 个 品 种 服 装 上 的 每 一 块 裁 片 服 装 制 作 过 程 中 每 一 种 操 作, 以 及 所 使 用 的 工 具 服 装 制 作 过 程 中 出 现 的 各 种 弊 病 和 要 达 到 的 某 些 质 量 要 求 等, 都 有 其

More information

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi U17 10220 UDC624 Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candidate:Chen Hao Tutor: Xue Jinghong

More information

Microsoft Word - A201210-60_1349949005.doc

Microsoft Word - A201210-60_1349949005.doc 5 10 15 20 25 一 种 针 对 在 线 旅 游 线 路 网 页 判 别 算 法 的 研 究 与 实 现 徐 显 炼, 郭 燕 慧 ( 北 京 邮 电 大 学 信 息 安 全 中 心, 北 京 100876) 摘 要 : 随 着 近 年 来 在 线 旅 游 业 的 快 速 发 展, 在 线 旅 游 搜 索 引 擎 己 经 成 为 当 前 搜 索 引 擎 发 展 的 一 个 热 门 方 向

More information

Microsoft Word - 2.v3n1.gjtm.docx

Microsoft Word - 2.v3n1.gjtm.docx Theory of carduonephric disharmony and irritable bowel syndrome Xia-min Lu 1, Min Lu 1 Nanjing University of Traditional Chinese Medicine, Nanjing, China Department of Digestive System, Jiangsu Integrated

More information

Microsoft Word - 18.doc

Microsoft Word - 18.doc ISSN 1023-2842 山 管 理 評 論 第 ㆓㈩ 卷 第 ㆒ 期 2012 年 ㆔ 號 p.403-422 文 藝 復 興 之 夢 :㆒ 個 微 型 咖 啡 店 的 創 業 歷 程 Dream of Rinascimento: The entrepreneurship of a small coffee shop * 戴 志 言 Chih-Yen Tai 國 立 山 大 業 管 理 系 Department

More information

厦 门 大 学 学 位 论 文 原 创 性 声 明 本 人 呈 交 的 学 位 论 文 是 本 人 在 导 师 指 导 下, 独 立 完 成 的 研 究 成 果 本 人 在 论 文 写 作 中 参 考 其 他 个 人 或 集 体 已 经 发 表 的 研 究 成 果, 均 在 文 中 以 适 当 方

厦 门 大 学 学 位 论 文 原 创 性 声 明 本 人 呈 交 的 学 位 论 文 是 本 人 在 导 师 指 导 下, 独 立 完 成 的 研 究 成 果 本 人 在 论 文 写 作 中 参 考 其 他 个 人 或 集 体 已 经 发 表 的 研 究 成 果, 均 在 文 中 以 适 当 方 学 校 编 码 :10384 分 类 号 密 级 学 号 : UDC 硕 士 学 位 论 文 浙 江 省 人 事 考 试 突 发 事 件 应 对 策 略 探 析 An Exploration of Zhejiang Province Personnel Examination Emergency Strategy 姜 海 峰 指 导 教 师 姓 名 : 王 玉 琼 教 授 专 业 名 称 : 公 共

More information

90 如成本较高 费工费时等缺点, 尤其对于新建桥梁, 不可能为研究极限承载力而进行破坏试验, 作为一种经济 省时且行之有效的方法, 数值仿真分析弥补了上述缺点 [3] 然而, 由于有限元分析中涉及到材料和几何双重非线性, 计算工作量很大, 且收敛困难 ; 此外, 桥梁结构的极限承载力受施工工艺和施

90 如成本较高 费工费时等缺点, 尤其对于新建桥梁, 不可能为研究极限承载力而进行破坏试验, 作为一种经济 省时且行之有效的方法, 数值仿真分析弥补了上述缺点 [3] 然而, 由于有限元分析中涉及到材料和几何双重非线性, 计算工作量很大, 且收敛困难 ; 此外, 桥梁结构的极限承载力受施工工艺和施 1 第 13 卷第 1 期 JournalofRailwayScienceandEngineering Volume13 Number1 January2016 先简支后连续 T 梁桥全过程力学行为及极限承载力分析 1 朱小青, 陈代海, 陈淮 ( 郑州大学土木工程学院, 河南郑州 450001) 摘要 : 为研究先简支后连续 T 梁桥从施工至极限破坏的全过程受力性能, 以河南省省道 S318 线西张村大桥为工程背景,

More information

某动车组主变压器风道的谐响应分析

某动车组主变压器风道的谐响应分析 主 变 压 器 风 道 的 谐 响 应 分 析 孙 维 光 田 爱 琴 南 车 青 岛 四 方 机 车 车 辆 股 份 有 限 公 司 技 术 中 心 青 岛 266111 摘 要 : 采 用 HyperWorks 对 主 变 压 器 风 道 进 行 模 态 与 谐 响 应 分 析, 得 出 了 主 变 压 器 风 道 的 位 移 与 应 力 - 时 间 响 应 值 ; 发 现 主 变 压 器 风

More information

76 201 68m + 14 12. 9m 5m 500 16 20 10 168 ~ 180 8 25 14 20 14 PTFE 1 50 6 1 200 6 Q45B 1 670MPa PMSAP MIDAS SAP2000 MIDAS MIDAS 4. 2 4. 2. 1 0. 5s 0.

76 201 68m + 14 12. 9m 5m 500 16 20 10 168 ~ 180 8 25 14 20 14 PTFE 1 50 6 1 200 6 Q45B 1 670MPa PMSAP MIDAS SAP2000 MIDAS MIDAS 4. 2 4. 2. 1 0. 5s 0. 4 11 201 6 Building Structure Vol. 4 No. 11 Jun. 201 510060 2010 TU18. 2 A 1002-848X 201 11-0075-05 Design on stand structure of the main venue for Asian Games 2010 in Guangzhou Liu Yongtian Liu Yang Zhan

More information

Soliman Addenbrooke Potts Chehade Shahrour Fig. 1 Plan view for construction site m 2

Soliman Addenbrooke Potts Chehade Shahrour Fig. 1 Plan view for construction site m 2 7 5 Vol. 7 2011 10 Chinese Journal of Underground Space and Engineering Oct. 2011 * 1 1 2 1 1. 200072 2. 200062 U455. 43 A 1673-0836 2011 05-0884 - 06 Numerical Simulation Analysis on Ground Settlements

More information

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel 2011 11 11 158 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2011 NO. 11 Ser. 158 1006-2106 2011 11-0104 - 08 1 2 1. 200048 2. 200002 < 20 mm 2 1 788 TU470 A Design and Construction of Deep Excavation Engineering

More information

5 551 [3-].. [5]. [6]. [7].. API API. 1 [8-9]. [1]. W = W 1) y). x [11-12] D 2 2πR = 2z E + 2R arcsin D δ R z E = πr 1 + πr ) 2 arcsin

5 551 [3-].. [5]. [6]. [7].. API API. 1 [8-9]. [1]. W = W 1) y). x [11-12] D 2 2πR = 2z E + 2R arcsin D δ R z E = πr 1 + πr ) 2 arcsin 38 5 216 1 1),2) 163318) 163318). API. TE256 A doi 1.652/1-879-15-298 MODE OF CASING EXTERNA EXTRUSION BASED ON THE PRINCIPE OF VIRTUA WORK 1) ZHAO Wanchun,2) ZENG Jia WANG Tingting FENG Xiaohan School

More information

m 6. 6m m m ~ m m 4. 0m ~ ~

m 6. 6m m m ~ m m 4. 0m ~ ~ 41 2 2 Building Structure Vol. 41 No. 2 Feb. 2011 100120 5 12 TU398. 5 A 1002-848X 2011 02-0081-04 Analysis on seismic damage of concrete masonry structures in Wenchuan Earthquake Jia Jie Huang Yinying

More information

准北春晖油田油气勘探快速突破的三点启示

准北春晖油田油气勘探快速突破的三点启示 Advances in Geosciences 地 球 科 学 前 沿, 1,, 4-3 http://dx.doi.org/1.1677/ag.1.13 Published Online March 1 (http://www.hanspub.org/journal/ag) Exploration Breakthrough Inspirations of Chunhui Oilfield in the

More information

00040122 水 资 源 与 水 危 机 2 学 分 32 学 时 Water Resources and Water Crisis 水 资 源 是 人 类 耐 以 生 存 的 基 础 自 然 资 源, 同 时 也 是 生 态 环 境 的 控 制 性 因 素 之 一 ; 在 国 民 经 济 中

00040122 水 资 源 与 水 危 机 2 学 分 32 学 时 Water Resources and Water Crisis 水 资 源 是 人 类 耐 以 生 存 的 基 础 自 然 资 源, 同 时 也 是 生 态 环 境 的 控 制 性 因 素 之 一 ; 在 国 民 经 济 中 水 利 水 电 工 程 系 00040022 地 球 与 人 类 环 境 2 学 分 32 学 时 The Earth and Human Being's Environment 地 球 和 地 壳, 矿 物 和 岩 石, 内 动 力 地 质 作 用, 外 动 力 地 质 作 用, 地 质 年 代, 地 球 历 史, 地 球 的 大 气 圈 及 其 环 境 问 题, 地 球 的 水 圈 及 其 环

More information

WORLD EARTHQUAKE ENGINEERING Vol. 27 No. 4 Dec TU398 A Analysis of energy dissipation and ea

WORLD EARTHQUAKE ENGINEERING Vol. 27 No. 4 Dec TU398 A Analysis of energy dissipation and ea 27 4 2011 12 WORLD EARTHQUAKE ENGINEERING Vol. 27 No. 4 Dec. 2011 1007-6069 2011 04-0001 - 06 116622 8 3 TU398 A Analysis of energy dissipation and earthquake mitigation of a high-rise building with metal

More information

医学科研方法

医学科研方法 医 学 科 研 方 法 主 讲 苏 秀 兰 细 胞 生 物 学 教 授 第 一 讲 绪 论 一 概 念 : 在 医 学 科 学 研 究 活 动 中, 运 用 科 学 的 实 践 和 理 论 思 维 的 技 巧, 充 分 发 挥 自 己 的 智 慧, 去 寻 找 观 念 世 界 与 现 实 世 界 之 间 的 联 系 或 规 律, 从 而 发 现 新 现 象, 提 出 新 理 论 的 手 段 二 医

More information

Jiangsu Miracle Logistics System Engineering Co., Ltd. 2004 00 1 2-3 4-6 7-9 10-14 15-17 18-19 20-29 30 31-34 35-82 83 2004 1 Jiangsu Miracle Logistics System Engineering Co., Ltd. Miracle Logistics 343

More information

1 Fig. 1 Perspective view of New CCTV Building 13008mm 2, 2811% ( ) 6, HRB400, 1187mm 2, 216% C60, 32095mm 2, Q345, 2 4,, Q345, Q390C, 2, 1 Q235, 5mm

1 Fig. 1 Perspective view of New CCTV Building 13008mm 2, 2811% ( ) 6, HRB400, 1187mm 2, 216% C60, 32095mm 2, Q345, 2 4,, Q345, Q390C, 2, 1 Q235, 5mm 29 3 Vol129, No13 2008 6 Journal of Building Structures June 2008 : 100026869 (2008) 0320031209 SRC 1, 1, 1, 1, 2, 2, 2 (1., 200092; 2., 200002) : SRC 30%, SRC 9,, N P 2M P SRC, SRC ; N P 2M P SRC : ;

More information

火灾后混凝土预应力桥梁检测试验与评估

火灾后混凝土预应力桥梁检测试验与评估 Hans Journal of Civil Engineering 土木工程, 2015, 4(5), 230 236 Published Online September 2015 in Hans. http://www.hanspub.org/journal/hjce http://dx.doi.org/10.12677/hjce.2015.45029 Test and Assessment of

More information

(5) 芒杏河 1 号大桥桥梁跨径布置为 73m+130m+130m+73m 的预应力混凝土连续刚构桥 主桥上部采用单箱单室断面, 箱梁根部梁高为 8.2m, 跨中端部梁高为 2.6m 箱梁采用纵向 横向及竖向的三向预应力结构 主桥桥墩均采用双薄壁空心墩, 单壁平面尺寸为分别为 7m 3.0m 和

(5) 芒杏河 1 号大桥桥梁跨径布置为 73m+130m+130m+73m 的预应力混凝土连续刚构桥 主桥上部采用单箱单室断面, 箱梁根部梁高为 8.2m, 跨中端部梁高为 2.6m 箱梁采用纵向 横向及竖向的三向预应力结构 主桥桥墩均采用双薄壁空心墩, 单壁平面尺寸为分别为 7m 3.0m 和 红河州元江至蔓耗高速公路 ( 红河段 ) 桥梁施工监控量测招标招标公告 1. 招标条件 红河州元江至蔓耗高速公路 ( 红河段 ) 已由云南省发展和改革委员会以云 发改基础 [2016]61 号文件批准建设, 施工图设计已由云南省交通运输厅以云 交基建 [2016]918 号文件批复 项目业主为红河州元蔓高速公路投资建设开发 有限公司, 建设资金来自 本项目采用 PPP 模式 ( 政府和社会资本合作

More information

Microsoft Word - A201202-493_1329751213.doc

Microsoft Word - A201202-493_1329751213.doc 5 10 15 20 25 BP 神 经 网 络 在 中 国 创 业 板 企 业 成 长 性 预 测 研 究 ** 孙 静 稳, 刘 金 平 ( 中 国 矿 业 大 学 管 理 学 院, 江 苏 徐 州 221116) 摘 要 : 根 据 创 业 板 企 业 的 高 科 技 和 高 成 长 性 特 点, 成 为 金 融 证 券 市 场 热 门 关 注 的 对 象, 其 成 长 性 研 究 是 资 本

More information

<4D6963726F736F667420576F7264202D20B169B74FC5EF2020A8E2A9A4B0EABB79B1D0ACECAED1A56AA8E5B8D6BA71BFEFBFFDA4A7ACE3A8732E646F63>

<4D6963726F736F667420576F7264202D20B169B74FC5EF2020A8E2A9A4B0EABB79B1D0ACECAED1A56AA8E5B8D6BA71BFEFBFFDA4A7ACE3A8732E646F63> 國 立 臺 北 教 育 大 學 人 文 藝 術 學 院 語 文 與 創 作 學 系 語 文 教 學 碩 士 班 ( 暑 期 班 ) 碩 士 論 文 Master Program of Language Instruction ( Summer Program) Department of Language and Creative Writing College of Humanities and

More information

0 ( steel p late shear wall with slits, SPW S) H itaka [ 1 ],, 1 SPW S:, ;, ;,, SPW S,,,, 1 3,,, SPW S,, SPW S, [ 8 ], SPW S,, 1 1 SPW S Fig. 1 Genera

0 ( steel p late shear wall with slits, SPW S) H itaka [ 1 ],, 1 SPW S:, ;, ;,, SPW S,,,, 1 3,,, SPW S,, SPW S, [ 8 ], SPW S,, 1 1 SPW S Fig. 1 Genera Journal of Building Structures : 100026869 (2009) 0520057208 30 5 2009 10 Vol130 No15 Oct12009 007 1, 3, 2, 1, 4 (1., 200092; 2., 200092; 3. (), 201900; 4., 100037) :, 2, : ;, : ; ; : TU39214 TU31711 :

More information

Microsoft Word 聂雪梅.doc

Microsoft Word 聂雪梅.doc 4 4 Vol. 4 No. 4 2013 8 Journal of Food Safety and Quality Aug., 2013 聂雪梅 *, 李立, 孙利, 高飞 (, 100123) 摘要 : 2011 12,, 2007~2011,,,, 关键词 : ; ; ; ; Trade and notification situation on food import and export

More information

中国消费者网上购书意向模型与影响因素实证研究

中国消费者网上购书意向模型与影响因素实证研究 Service Science and Management 服 务 科 学 和 管 理, 2013, 2, 1-8 http://dx.doi.org/10.12677/ssem.2013.21001 Published Online February 2013 (http://www.hanspub.org/journal/ssem.html) An Empirical Study of the

More information

untitled

untitled 90120 90320 96 年 90620 91120 類 隆 北 2 不 不 說 度 行 度 25 行 說 20 理 說 行 20 理 說 20 說 行 15 95 年 類 理 行 理 10150 11650 13150 14650 10450 11950 13450 14950 11050 12550 14050 15550 2 不 不 62 行 立 論 25 78 契 不 契 論 25 97

More information

第 一 编 总 则 第 一 条 为 保 障 煤 矿 安 全 生 产 和 职 工 人 身 安 全, 防 止 煤 矿 事 故, 根 据 煤 炭 法 矿 山 安 全 法 和 煤 矿 安 全 监 察 条 例, 制 定 本 规 程 第 二 条 在 中 华 人 民 共 和 国 领 域 从 事 煤 炭 生 产 和

第 一 编 总 则 第 一 条 为 保 障 煤 矿 安 全 生 产 和 职 工 人 身 安 全, 防 止 煤 矿 事 故, 根 据 煤 炭 法 矿 山 安 全 法 和 煤 矿 安 全 监 察 条 例, 制 定 本 规 程 第 二 条 在 中 华 人 民 共 和 国 领 域 从 事 煤 炭 生 产 和 煤 矿 安 全 规 程 国 家 安 全 生 产 监 督 管 理 局 国 家 煤 矿 安 全 监 察 局 第 一 编 总 则 第 一 条 为 保 障 煤 矿 安 全 生 产 和 职 工 人 身 安 全, 防 止 煤 矿 事 故, 根 据 煤 炭 法 矿 山 安 全 法 和 煤 矿 安 全 监 察 条 例, 制 定 本 规 程 第 二 条 在 中 华 人 民 共 和 国 领 域 从 事 煤 炭 生 产

More information