增刊 胡贺祥等 : 锚杆对双排桩结构变形和受力影响分析 515 同时, 模型坑外尺寸取为 5 m, 约为.5 倍开挖深 度, 坑底以下取 35 m, 约为 3.5 倍的开挖深度, 基 本能满足模型边界条件对基坑双排桩支护结构变形 无影响的程度 双排桩支护按照现行 建筑基坑支护技术规 程 和工程经验确

Similar documents
successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel

m K K K K m Fig. 2 The plan layout of K K segment p

PLAXIS 2D m PLAXIS 3D Foundation mm ~ m ~ mm m m 312 m 200 mm 0. 98

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5

第 29 卷第 9 期 Vol. 29 NO. 9 重庆工商大学学报 ( 自然科学版 ) J Chongqing Technol Business Univ. Nat Sci Ed Sept X * ABAQUS 1 2

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315.

cm /s c d 1 /40 1 /4 1 / / / /m /Hz /kn / kn m ~

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土

doc

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip

岩 土 工 程 学 报 14 号 工程占地面积 53 m 地下室周长约 15 m 拟建地上 4 层 地下 3 层 设计基坑开挖深度 m 工程场区东侧地下室外墙距船坞码头约 35 m 基坑南侧距海岸大坝最近约 m 西侧距畅海园两幢 住宅楼约 11.9 m 西北角距污水泵站最近约 6.

Soliman Addenbrooke Potts Chehade Shahrour Fig. 1 Plan view for construction site m 2

09L094-杨德健.doc

/MPa / kg m - 3 /MPa /MPa 2. 1E ~ 56 ANSYS 6 Hz (a) 一阶垂向弯曲 (b) 一阶侧向弯曲 (c) 一阶扭转 (d) 二阶侧向弯曲 (e) 二阶垂向弯曲 (f) 弯扭组合 2 6 Hz

石家庄铁道大学学报 自然科学版 18 b 布设图 (a) 抗拔桩 图 第 31 卷 抗拔桩的具体布设情况 三维数值模型建立及计算 研究范围 以地铁左线中心线与翠屏山隧道相交处南侧 桩 号 K 为中心点 X 方向 地铁盾构掘进方 向 取 72 m 长 Y 方向 翠屏

Ansys /4 Ansys % 9 60% MU10 M m 1 Fig. Actual situation of measured building 1 Fig. 1 First floor plan of typical r

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal

第 4 期 崔宏环等 : 深基坑开挖中双排桩支护的的三维有限元模拟 663 C10 N 无限元 CIN3D8 模拟无穷远的土体边界条件 挡土桩上覆压顶冠梁 若要模拟桩 土 冠梁与土接触, 势必会带来有限元收敛问题 考虑到桩受土压力, 将产生侧向变形, 且为桩土协调变形, 本文运用 ABAQUS 中的

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm

1704 岩 土 力 学 2012 年 以 底 板 已 经 成 为 巷 道 支 护 体 系 的 一 个 薄 弱 环 节, 是 造 成 巷 道 失 稳 的 关 键 因 素 底 臌 问 题 已 引 起 了 国 内 外 学 者 的 广 泛 重 视, 一 直 是 研 究 的 热 点 问 题 [4] 20 世


m m m ~ mm

mm ~

5 223 PLAXIS3D (2015) 30m 7 2 DB20-1~DB20-7DB21-1~DB m DB A~ R K 3 m =340m( R=350 m) 1 ~6 2 1 DK ~ DK (DK

31 17 www. watergasheat. com km 2 17 km 15 km hm % mm Fig. 1 Technical route of p

11 25 stable state. These conclusions were basically consistent with the analysis results of the multi - stage landslide in loess area with the Monte

708 北 京 工 业 大 学 学 报 2011 年 以 往 的 试 验 结 果 进 行 对 比, 选 取 15D 20D 作 为 对 比 参 数, 试 件 参 数 见 表 1. Fig. 1 图 1 试 件 尺 寸 及 配 筋 图 ( mm) Geometry and reinforcement

压 缩 分 散 型 预 应 力 锚 索 近 年 来 有 了 较 多 的 应 用, 并 取 得 了 良 好 的 加 固 效 果 软 弱 岩 土 体 的 主 要 特 性 是 无 论 其 峰 值 强 度 还 是 残 余 强 度 都 是 很 低 的, 其 承 载 力 低 稳 定 性 差 压 缩 分 散 型

第 5 期 李启民等 : 双排挤扩支护桩试验研究 9 上发展起来的一种新型支护结构 由于挤扩机具的 挤压作用, 支盘周围土体得到了相当程度的压密作 用, 降低了压缩性, 提高了压缩模量, 其物理力学 性质优于原状土 [] 更为重要的是, 双排挤扩支护 桩前 后排的挤扩盘相连后, 形成了一种特殊类型

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva

220 Key words: assembled monolithic concrete shear walls; precast two-way hollow slab; inner joint; slit wall; shear behavior 3 ~ % 80% [1] [


θ 1 = φ n -n 2 2 n AR n φ i = 0 1 = a t - θ θ m a t-m 3 3 m MA m 1. 2 ρ k = R k /R 0 5 Akaike ρ k 1 AIC = n ln δ 2

第 一 编 总 则 第 一 条 为 保 障 煤 矿 安 全 生 产 和 职 工 人 身 安 全, 防 止 煤 矿 事 故, 根 据 煤 炭 法 矿 山 安 全 法 和 煤 矿 安 全 监 察 条 例, 制 定 本 规 程 第 二 条 在 中 华 人 民 共 和 国 领 域 从 事 煤 炭 生 产 和

Mnq 1 1 m ANSYS BEAM44 E0 E18 E0' Y Z E18' X Y Z ANSYS C64K C70C70H C /t /t /t /mm /mm /mm C64K

中国科技论文在线中文稿件模板

33 5 Vol.33,No JournalofHebeiUniversityofScienceandTechnology Oct.2012 : (2012) /,, ( 河北科技大学机械工程学院, 河北石家庄 ) : 利用计算流体

标题

) ( ) 2008 (300m ) 1 FRP [1 ] FRP 3 FRP FRP (CFRP) FRP CFRP (fiber reinforced polymer FRP) 60 % 160MPa 2400MPa [2 ] FRP 1 2mm FRP FRP 1 FRP C

Microsoft Word - 001林本海.doc

5 9 T m /31 / T r 1 /1 s - 1 AC - C Johnson-Cook. 1 JC 1 mm mm 1 MTS 1 7 # NES % 1 Tab. 1 AC - C AC - C gradation /mm

untitled

620 岩土力学 2011 年 身或预处理的局部的稳定性, 随基坑开挖分层挂钢 筋网喷射混凝土, 以避免土层碎片及岩石边坡小型 节理破碎滑塌, 并把土压力传给锚板, 由锚杆集中 受力, 通过锚杆的锚固力平衡土压力 形成一个桩 锚结构近似的整体支护系统, 起到限制基坑位移的 作用 图 1 预应力锚板墙

when they have the children custody which is a better legislation to equilibrize the children's mothers' fathers'and stepfathers'status rights and ben

40 强 度 与 环 境 2010 年 强 烈 的 振 动 和 冲 击 载 荷, 这 就 对 阀 门 管 路 等 部 件 连 接 的 静 密 封 结 构 提 出 了 很 高 的 要 求 某 液 体 火 箭 发 动 机 静 密 封 涉 及 高 压 超 低 温 大 尺 寸 三 个 严 酷 条 件, 具

Rupture Index 12 4 a SPB C - 1 b SPB C Fig. 1 Model dimension 1 2 Fig. 2 Position of welding seam Fig s Temperature distrib

第 05 期 董房等 : 一种卫星遥测在线状态监测及分析系统的设计 WEB 1 2 总体功能及组成 2.1 总体功能 1 2 3Web 2.2 结构组成 Web WEB WEB 2.3 系统各模块接口关系

第16卷 第2期 邯郸学院学报 年6月

增刊 2 郑刚等 : 大面积基坑多级支护理论与工程应用实践 291 水平支撑 图 1 大面积基坑钢筋混凝土水平支撑 Fig.1 Horizontal concrete struts of large-area foundation pit 由图 1 可以看出, 对大面积深基坑, 密集的水 平支撑工程

Microsoft Word 任 辉_new_.doc

Microsoft Word D 孙竹森.doc

~ ~ Y 3 X / / mm 400 ~ 700 C40 ~ C ~ 400 C40 ~ C ~

<4D F736F F D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378>

Fig. 1 1 a-a b-b a-a σ ma = MPa σ a = MPa σ 0a = MPa 0. 9 σ t =135 MPa b-b σ mb = MPa τ b = MPa σ 0b =

68 ( ) 2006,,,,,,,,,, (narrative history),,, [1 ] (P ),,,,,,, [ 2 ] ( P ), ;,,,,,,,,,,,,,, (1917),, 30,,,, :,, ;,,,,, ( ) ( ), :,,,,,,,,,,

自然科学版 预处理 视盘粗定位 视盘垂直坐标的粗定位 视盘水平坐标的粗定位

中華民國建築學會第十二屆建築研究成果發表會

第 3 期马郧等 : 基坑双排桩支护结构设计计算软件开发及应用 863 了新的要求 单排悬臂桩的支护深度不宜超过 6 m, 主要缺 点是控制变形能力差, 且要求基底有较好的嵌入条 件 ; 在变形控制要求较高, 又不宜采用内支撑和锚 杆的情况下, 双排桩能发挥较好的作用 双排桩支 护结构由刚性横梁与前

亚临界大容量电站锅炉过热器系统阻力

1168 岩土力学 15 年 大连 深圳及武汉等土岩基坑中得到了广泛的应用 龙门吊依其大跨度内荷载稳定 作业空间大 带载行走 占地面积小 操作司机能目视到作业区 作业更安全等独特的优势, 逐渐从码头 货场专用 设备中脱颖而出, 应用到明挖法地铁车站施工领域, 成为明挖地铁车站吊运设备的首选 龙门吊适

m m 5m ~ PTFE Q45B 1 670MPa PMSAP MIDAS SAP2000 MIDAS MIDAS s 0.

Technical Acoustics Vol.27, No.4 Aug., 2008,,, (, ) :,,,,,, : ; ; : TB535;U : A : (2008) Noise and vibr

66 岩 土 力 学 6 年 除 此 之 外, 还 能 模 拟 地 下 水 的 影 响 本 文 通 过 FLAC 3D 模 拟 锚 杆 框 架 梁 加 固 膨 胀 土 路 堑 边 坡, 探 讨 了 锚 杆 长 度 和 角 度 及 其 间 距 对 膨 胀 土 路 堑 边 坡 变 形 的 影 响, 同

Microsoft Word - 18-p0402-c3.doc

<4D F736F F D20B9DCC0EDD6C6B6C8BBE3B1E0B5DAB6FEB8E5>

Microsoft Word 聂雪梅.doc

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行

CX - 06A 1 a 1 CX - 06A ΣLsinδ θ ~ 100 m 50 4 mm /15 m 1 b V - 10 ~ ~ Pa 80 ~ 100 m 100

华山山前断裂中段晚第四纪活动的地貌表现及响应

f 2 f 2 f q 1 q 1 q 1 q 2 q 1 q n 2 f 2 f 2 f H = q 2 q 1 q 2 q 2 q 2 q n f 2 f 2 f q n q 1 q n q 2 q n q n H R n n n Hessian

,,,,,,,,,, ; (),,,,,,,, 1862,1864 8,,() () () () () () (), :,,,,,,,,,,,,,,,, 95 %,, 1.,,, 20 (1838 ) (1873 ), ( )

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut

5 551 [3-].. [5]. [6]. [7].. API API. 1 [8-9]. [1]. W = W 1) y). x [11-12] D 2 2πR = 2z E + 2R arcsin D δ R z E = πr 1 + πr ) 2 arcsin

西部人居环境学刊2016年第1期.indd

于升才 : 基于 PLAXIS3D 技术的深基坑开挖对既有地铁结构影响分析 225 图 2 基坑与既有地铁结构平面位置关系 ( 单位 :m) 2 数值分析模型建立包含基坑和既有地铁结构的三维有限元模型进行计算分析 2 1 模型尺寸及边界条件为减小模型边界效应的影响, 模型边界取至基坑深度的 3~5

85% NCEP CFS 10 CFS CFS BP BP BP ~ 15 d CFS BP r - 1 r CFS 2. 1 CFS 10% 50% 3 d CFS Cli

Torre Mayor Y A09 A m m m g γ


Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6

79 PKPM2010 /SATWE Midas Civil K mm m kn / m kn /m 2 ZK kn /1. 6 m 200 /1. 6 /5. 55 = kn /

b) 350 /t /t /m 2 30 cm 6 mm /m 2 8 mm /m 2. a) c) /m 2. b) c) 2 d) 3.2 a) ( 2) P i (100 kn) N s 16 N s =

王 声 文 等 :GNC62 数 控 系 统 组 态 和 设 备 调 试 设 计 2 GNC62 系 统 组 态 设 计 原 理 2 2 [1] 2 A I/O 1 293

8 : 731 Key words : narrow annular gap ; curvat ure ; critical heat flux ; annular flow,,,,,,,, ( ),, [122 ] kg/ (m 2 s) MPa

mm 110mm BRBF 4 HRB400 14mm mm MPa MPa BRBF BRBF BRB BRBF Fig. 1 1 Dormitory building before and a

g 100mv /g 0. 5 ~ 5kHz 1 YSV8116 DASP 1 N 2. 2 [ M] { x } + [ C] { x } + [ K]{ x } = { f t } 1 M C K 3 M C K f t x t 1 [ H( ω )] = - ω 2

2008年1月11日に岩手県釜石沖で発生した地震(M4.7)について

0 Kelly Fig. 1 Novel damping wall-structure connection diagram a b S1 c S Fig. 2 Desig

Microsoft Word - 06-p0329-c10.doc

标题

2 ( 自 然 科 学 版 ) 第 20 卷 波 ). 这 种 压 缩 波 空 气 必 然 有 一 部 分 要 绕 流 到 车 身 两 端 的 环 状 空 间 中, 形 成 与 列 车 运 行 方 向 相 反 的 空 气 流 动. 在 列 车 尾 部, 会 产 生 低 于 大 气 压 的 空 气 流

动力厂安全规程

T R 1 t z v 4z 2 + x 2 t = 2 槡 v t z 200 m/s x v ~

<4D F736F F D207A79785F D31322D313420B8BDBCFE3220A3BA32305F5F3133C4EAD4F6C1D0CBB6CABFD7A8D2B520D1A75F5FCEBBCADAC8A8B5E3C9EAC7EBB1ED2E646F63>

artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti - float and anti - ra

Journal of Arid Meteorology Vol. 28 No. 4 Dec a

d 9340m m a e m 93m 110m 80m 1 b V 110m 80m 9. 4m 24 1 / / c Fig f m Analytical model 1 1

中 国 东 方 航 空 股 份 有 限 公 司 章 程 第 一 章 第 二 章 第 三 章 第 四 章 第 五 章 第 六 章 第 七 章 第 八 章 第 九 章 第 十 章 第 十 一 章 第 十 二 章 第 十 三 章 第 十 四 章 总 则 经 营 宗 旨 和 范 围 股 份 和 注 册 资

Microsoft Word - A doc

第 3 期 朱虹牧等 : 基坑开挖对围护结构变形的影响 509 [11] 燕等在考虑基坑墙角处三维效应基础上, 通过建立基坑的三维有限元模型, 研究了网格密度大小对计算精度的影响 现有研究成果中, 在对基坑开挖模拟时大多对土体进行了简化处理, 这对模拟结果准确性可能产生一定影响 笔者利用有限元软件

Transcription:

第 35 卷增刊 岩土力学 Vol.35 Supp. 年 1 月 Rock and Soil Mechanics Oct. 文章编号 :1-759() 增刊 -5-7 锚杆对双排桩结构变形和受力影响分析 胡贺祥, 宋福渊, 油新华, 马庆松, 郭 恒 ( 中国建筑股份有限公司技术中心, 北京 113) 摘要 : 采用适用于敏感环境下基坑数值分析的硬化类弹塑性本构模型, 针对锚杆对双排桩变形和受力的影响进行数值模拟 分析表明 : 锚固角度的增加能有效减小双排桩的最大水平位移和后排桩的桩身控制弯矩, 但减小幅度随锚固角度增大而减小 ; 在实际设计中, 在周边环境允许的条件下, 应尽可能增加锚杆与后排桩的夹角 锚固力的增加对双排桩结构的变形控制作用明显, 能显著降低桩身最大水平位移, 减小幅度也随锚固力的增加而减小 ; 锚固力较大时会增大桩的控制弯矩, 使桩的截面或配筋增加 ; 在实际设计中, 锚固力不应过大, 可随信息化施工对基坑变形进行主动控制 关键词 : 双排桩 ; 锚杆 ; 数值分析 ; 本构模型中图分类号 :TU 73 文献标识码 :A Analysis of effect of anchor on deformation and force of double-row piles HU He-xiang,SONG Fu-yuan,YOU Xin-hua,MA Qing-song,GUO Heng (Technical Center, China State Construction Engineering Corporation Limited, Beijing 113, China) Abstract: Using the strain hardening elastoplastic constitutive model which is suitable for numerical analysis of deep excavations in close proximity to sensitive properties, the effect of the anchor on deformation and force of double-row piles is discussed. Increasing the anchorage angles can effectively reduce not only the maximum horizontal displacement of double-row piles but also the bending moments of the back row piles. Increasing the anchorage forces can only effectively reduce the maximum horizontal displacement of double-row piles. The bending moments increase when the anchorage force is larger. In the actual design, we should choose the possible larger angle between anchor and the back row piles and actively control the anchorage forces along with the monitoring. Key words: double-row piles;anchor;numerical analysis;constitutive model 1 引言 近年来, 随着城市建设进程的加快, 市区内建筑密度愈来愈高, 很多建筑的修建见缝插针, 使紧邻既有建筑的基坑工程越来越普遍 当一些传统的支护形式如 ( 如桩锚 土钉墙等 ) 受到实际空间条件的制约而无法实施时, 双排桩结构是一种可供选择的基坑支护结构形式 ; 但在基坑位移控制严格而又基坑稍深时, 单纯的双排桩结构往往无法达到位移控制要求, 这时往往在双排桩后根据空间大小加设锚杆 带锚杆的双排桩结构具有以下优点 : 支护结构施工均在地面进行, 锚杆浆体养护可与桩身混凝土养护同步, 基坑开挖无支撑, 挖土方便, 能有效缩短工期, 可根据信息化施工对基坑位移进行主动控制 目前, 对于双排桩的计算方法相对成熟, 已列入现行 建筑基坑支护技术规程 而对带锚杆的双排桩结构, 目前, 文献 [1-] 中仅见一些工程项目中的实际应用和数值模拟, 所采用本构模型也都为过多考虑基坑回弹的 Mohr-Coulomb 模型, 对敏感环境下的变形分析并不适用, 对于锚杆的影响也没有进行系统的分析 本文采用适用于敏感环境下基坑数值分析的硬化类弹塑性本构模型, 针对锚杆对双排桩变形和受力的影响进行系统研究 有限元模型 本文采用 Plaxis 有限元软件进行建模计算 模型中取基坑的开挖深度为 1 m, 开挖宽度取 m 为减少模型计算量, 节约计算成本, 考虑对称性取 1/ 基坑尺寸进行建模, 即模型中坑内宽度取 1 m 收稿日期 :--1 基金项目 : 中国建筑股份有限公司科技研发课题 (No. CSCEC--1,No. CSCEC-1-) 第一作者简介 : 胡贺祥, 男,195 年生, 硕士, 主要从事地下结构工程和岩土数值计算等方面的研究工作 E-mail:huhexiang5@13.com

增刊 胡贺祥等 : 锚杆对双排桩结构变形和受力影响分析 515 同时, 模型坑外尺寸取为 5 m, 约为.5 倍开挖深 度, 坑底以下取 35 m, 约为 3.5 倍的开挖深度, 基 本能满足模型边界条件对基坑双排桩支护结构变形 无影响的程度 双排桩支护按照现行 建筑基坑支护技术规 程 和工程经验确定尺寸, 双排桩排距取为 3 m, 约为 3.75 倍的桩径, 嵌固深度取为 m, 约为. 倍的基坑深度 模型尺寸和支护信息如图 1 所示 1 35 1 3 待挖基坑 图 1 几何模型尺寸示意图 ( 单位 :m) Fig.1 Dimensions of model (unit: m) 在有限元计算时, 将锚杆设置在后排桩, 这样 对后排桩施加一个向下的轴力分量, 后排桩可由不 设置锚杆时的拉弯构件变为设置锚杆时的压弯构 件, 能改善其受力状态, 更多发挥混凝土的受压优 势 ; 当锚杆设置在后排桩时, 锚头可直接设置在桩 顶位置, 无须穿桩, 受力直接, 施工方便 设置不 同角度的锚杆影响网格剖分, 不能保证每种工况的 锚杆所施加的锚固力是一定值, 这里主要的分析对 象是双排桩, 为了减少不必要的干扰, 直接用锚固 力 F 代替锚杆的作用 F 土体本构模型的选择对变形计算无疑是重要 的, 以 Mohr-Coulomb 模型为代表的弹性 - 理想塑性 模型在强度稳定性计算时表现尚可, 而在基坑开挖 计算中一般会过多得考虑坑底回弹, 影响桩后土体 位移 基坑一般由变形控制, 初始模量 最终抗剪 强度以及加载过程中的应力 - 应变及体变规律 [3] 3 个 要点都需要考虑, 这里土体采用 Hardening-Soil 模 型 为了对比不同结构的受力变形差异, 减少其他 因素的影响, 有限元模型采用简化的单一土层 Hardening-Soil 本构模型参数较多, 目前, 国内只有 [ 5] 王卫东等通过基于 GDS 三轴仪等试验获得了上 海地区典型黏土层的 Hardening-Soil 模型和 [] HS-Small 模型的完整参数, 按照 Brinkgreve 等建 议的方法获得了典型砂土层的完整参数, 并通过上 海地区的具体工程实测对整套参数进行了检验, 有 前 后排桩 桩径 :. m 间距 :1. m 刚架梁 截面 :1. m. m 间距 :1. m 力推动了 Hardening-Soil 模型在国内的应用 但是, 上海软土地区预应力锚杆应用较少 这里采用北京 CBD 核心区 Z15 地块超高层项 目的勘察报告中第 3 层中细砂的参数, 该层土的重 度 1.1 kn/m 3 Hardening-Soil 模型的参数按照 以下学者给出的参数之间的关系和建议值确定 : 王 [ 5] 卫东等通过收集全世界 13 个 Hardening-Soil 模 型和 HS-Small 模型作为砂土本构的有限元算例, 统 计分析发现, 砂土的 E E E 约为 E ur 5 Eoed oed, E 5 约为 E 的.7~1.5 倍, oed 的 3~5. 倍 本文取 E E ur 5 E, oed s1-, 参考应力 p 1 kpa 对于砂土, 剪胀角 取 Bolton [7] 所建议的 ( ' 3 ), 与模量应力水平相关的幂指数 m 取 Janbu [] 所建议 的.5, 破坏比 R f 和再加载泊松比 ur 分别采用 Brinkgreve [] 所建议的.9 和., 正常固结条件下 的侧压力系数 K 采用 Jaky [9] 所建议的 (1 sin ') 从勘察报告中提取 c ' ' E s1-, 利用以上参数之间的关系将第 3 层中细砂的 Hardening-Soil 模型参 数列表如表 1 所示 表 1 Hardening-soil 模型参数 Table 1 Parameters for Hardening-soil model 参数 取值 有效内摩擦角 /( ) 3 有效黏聚力 c /kpa 剪胀角 /( ) 三轴固结排水剪切试验的参考割线模量 E /MPa. 5 固结试验的参考切线模量 E /MPa. oed 三轴固结排水卸载 - 再加载试验的参考卸载再 加载模量 E ur /MPa 1. 卸载再加载泊松比 v ur. 与模量应力水平相关的幂指数 m.5 正常固结条件下的侧压力系数 K.5 参考应力 p /kpa 1 破坏比 R f.9 3 锚固角度对变形受力的影响 下面探讨锚固角度对双排桩结构变形和受力 的影响, 采用的方式为 : 保持锚固力 F 的大小恒为 kn, 不断变换锚固力 F 的方向以考虑锚杆角度 的影响, 由作用力方向与后排桩之间的夹角 表示 ( 如图 1 所示 ), 在 至 75 之间等间距变化, 其 中 为 75 时即为桩锚结构中最常取用的锚杆角度 15 为了与不设锚杆的双排桩进行对比增设 F= 的工况

51 岩土力学 年 前排桩水平位移随锚固角度的变化形态如图 所示, 后排桩水平位移随锚固角度的变化形态如图 3 所示 前排桩和后排桩的变形均呈现如下特点 : 与悬臂桩的变形模式不同, 双排桩由于刚架约束, 前 后排桩桩顶的水平位移曲率逐渐变小 ; 相对于不设锚的双排桩, 锚固角度 为 时, 锚固效果并不明显 ; 随着锚固角度的增大, 前 后排桩水平侧移越来越小, 但减小的幅度也随角度增大而减小 在不设置锚杆或锚杆角度 为 时, 桩身最大水平位移在桩顶处 ; 随着锚固角度的增大, 发生的深度也由桩顶逐步下移, 呈复合型变形模式 前排桩侧移 /mm 1 3 5 本相同, 设置锚杆后后排桩的水平变形更小, 以 75 时为例, 后排桩水平变形与坐标轴包围的面 积显然更小 ; 发生深度随锚固角度 增大而下移的现象不如前排桩明显, 后排桩桩顶位 移与桩身最大位移的比值一直较大 前排桩弯矩随锚固角度的变化形态如图 所 示 与悬臂桩相比, 不设锚杆的双排桩的前排桩桩 顶弯矩并不为, 原因在于桩顶的刚架约束作用, 使前排桩受到近坑侧受拉的弯矩作用 ; 随着锚固角 度的增大, 前排桩桩顶的弯矩逐渐由近坑侧受拉变 为远坑侧受拉 ; 前排桩最大正弯矩明显减小, 最大 负弯矩绝对值的最大值稍有增加, 变化不明显 ; 前 排桩最大正弯矩位置处深度基本无变化, 最大负弯 矩绝对值位置处深度明显向下移动 1 1 F= F= kn = F= kn =15 F= kn =3 F= kn =5 F= kn = F= kn =75-3 - -1 1 3 5 1 F= F= kn = F= kn =15 F= kn =3 F= kn =5 F= kn = F= kn =75 图 不同锚固角度的前排桩水平位移对比 Fig. Horizontal displacements of the front row piles at 1 1 3 5 1 1 前排桩侧移 /mm F= F= kn = F= kn =15 F= kn =3 F= kn =5 F= kn = 图 3 不同锚固角度的后排桩水平位移对比 Fig.3 Horizontal displacements of the back row piles at 前排桩和后排桩变形的不同点在于 : 相对于前 排桩, 锚固角度的增大对后排桩位移的减小效果更 为明显 ; 不设置锚杆时, 前 后排桩的水平位移基 图 不同锚固角度的前排桩弯矩对比 Fig. Bending moments of the front row piles at 后排桩弯矩随锚固角度的变化形态如图 5 所 示 与前排桩类似, 由于桩顶的刚架约束作用, 不 设锚杆的双排桩的后排桩桩顶弯矩也并不为, 而 是近坑侧受拉的负弯矩 ; 随着锚固角度的增大, 后 排桩桩顶的弯矩逐渐减小, 但始终为负弯矩, 桩顶 处开始为最大负弯矩绝对值的位置, 在 超过 5 之后发生明显下移 ; 最大正弯矩明显减小, 发生位 置也明显下移 前 后排桩水平位移最大值随锚固角度的变化 如图 所示 随着锚固角度的增大, 前排桩和后排 桩的水平位移均呈逐渐减小的趋势, 说明锚杆角度 越大, 锚固效果越好 只不过锚固角度越大, 这种 减小的趋势越小, 当锚固角度大于 5 时, 这种下 降的趋势已不明显 锚固角度为 的双排桩相对于 不设锚杆的双排桩, 锚固效果改善不明显 在不设

增刊 胡贺祥等 : 锚杆对双排桩结构变形和受力影响分析 517 锚杆或锚固角度为 时, 前 后排桩的最大水平位 移相等, 随着角度的增大, 两者之间的差异越来越 明显, 呈现前排桩位移较大, 后排桩位移较小的趋 势, 这可能与锚固力直接作用在后排桩上有关 -3-15 15 3 5 F= F= kn = F= kn =15 F= kn =3 F= kn =5 F= kn = F= kn =75 1 3 1 15 3 5 75 锚杆与竖直线夹角 /( ) 图 7 不同锚固角度的前排桩最大弯矩 Fig.7 Maximum bending moment of the front row pile at 1 图 5 不同锚固角度的后排桩弯矩对比 Fig.5 Bending moments of the back row piles at 3 1 5 15 3 5 75 锚杆与竖直线夹角 /( ) 桩侧移 /mm 3 图 不同锚固角度的后排桩最大弯矩 Fig. Maximum bending moment of the back row pile at 1 15 3 5 75 锚杆与竖直线夹角 /( ) 图 不同锚固角度的桩身最大水平位移 Fig. Maximum horizontal displacement of the pile at 前排桩最大 最小弯矩绝对值的最大值随锚固 角度的变化如图 7 所示 由于桩的配筋和截面由最 大正弯矩和最大负弯矩绝对值的较大值控制, 故应 取图 7 两条曲线中靠上的部分 由图可见, 随着锚 固角度的增大, 前排桩弯矩改善效果并不明显, 在 超过 15, 弯矩绝对值的最大值甚至稍有增加 后排桩最大 最小弯矩绝对值的最大值随锚固 角度的变化如图 所示 与前排桩类似, 取图 两 条曲线中靠上的部分, 可见后排桩的配筋和截面始 终由负弯矩绝对值的最大值控制 ; 随着锚固角度的 增大, 后排桩弯矩改善效果在 小于 5 时非常明 显, 在 超过 5 后基本无变化 锚固力对变形受力的影响 下面探讨锚固力对双排桩结构变形和受力的影响, 采用的方式为保持锚固角度 的大小恒为 5, 不断改变锚固力 F 的大小以考虑锚杆锚固力的影响 锚固角度由作用力方向与后排桩之间的夹角 表示 ( 如图 1 所示 ),F 在 ~ kn 之间等间距变化, 其中 F= 的情况即为不设置锚杆的双排桩的工况 前排桩水平位移随锚固力的变化形态见图 9, 后排桩水平位移随锚固角度的变化形态如图 1 所示 随着锚杆力的增加, 前 后排桩桩顶处向坑内的正水平位移逐渐减小, 逐渐转化为背向坑内的负水平位移 ; 同时, 随着锚杆力的增大, 位移改善的幅度也越来越小 在不设置锚杆即 F = 时, 桩身最大水平位移在桩顶处 ; 随着锚固角度的增大, 发生的深度也由桩顶逐步下移 前排桩和后排桩变形的不同点在于 : 相对于前排桩, 锚固力的增大对后排桩位移的减小效果稍明

51 岩土力学 年 显 ; 后排桩的水平位移曲线分布稍均衡, 前排桩的 水平位移曲线随深度的变化更大一些 -1 1 3 5 1 1 前排桩侧移 /mm 图 9 不同锚固力的前排桩水平位移对比 Fig.9 Horizontal displacements of the front row piles at different anchorage forces 后排桩侧移 /mm F= F=1 kn =5 F= kn =5 F=3 kn =5 F= kn =5 F=5 kn =5 F= kn =5-1 1 3 5 由近坑侧受拉的负弯矩逐渐变为远坑侧受拉的正弯 矩 ; 桩顶处开始为最大负弯矩绝对值的位置, 在 F 超过 kn 之后发生明显下移 ; 最大正弯矩位置开 始在深度 1 m 以下, 此时最大正弯矩逐渐减小, 在 F 超过 kn 之后突变转换至桩顶, 最大正弯 矩随锚固力增大而增大 -3 - -1 1 3 5 1 1 F= F=1 kn =5 F= kn =5 F=3 kn =5 F= kn =5 F=5 kn =5 F= kn =5 图 11 不同锚固力的前排桩弯矩对比 Fig.11 Bending moments of the front row piles at different anchorage forces 1 1 F= F=1 kn =5 F= kn =5 F=3 kn =5 F= kn =5 F=5 kn =5 F= kn =5 图 1 不同锚固力的后排桩水平位移对比 Fig.1 Horizontal displacements of the back row piles at different anchorage forces 前排桩弯矩随锚固力的变化形态如图 11 所示 随着锚固力的增大, 前排桩桩顶的弯矩逐渐由近坑 侧受拉变为远坑侧受拉 ; 前排桩最大正弯矩明显减 小, 最大负弯矩绝对值的最大值稍有增加, 变化不 明显 ; 最大负弯矩绝对值位置处深度明显向下移动, 在锚固力 F 不超过 3 kn 时, 前排桩最大正弯矩 位置处保持在深度.3 m 左右, 当 F 超过 3 kn 后, 该最大值位置突变至桩顶, 并保持不变 后排桩弯矩随锚固力的变化形态如图 所示 随着锚固力的增大, 后排桩桩顶的弯矩逐渐减小, -3-15 15 3 5 1 1 F= F=1 kn =5 F= kn =5 F=3 kn =5 F= kn =5 F=5 kn =5 F= kn =5 图 不同锚固力的后排桩弯矩对比 Fig. Bending moments of the back row piles at different anchorage forces 前 后排桩水平位移最大值随锚固力的变化如 图 13 所示 与锚固角度的影响类似, 随着锚固力的 增大, 前排桩和后排桩的水平位移均呈逐渐减小的 趋势, 说明锚杆力越大, 变形的控制效果越好 ; 只 不过锚固力越大, 这种减小的趋势越平缓 ; 在不设 锚杆即锚固力 F= 时, 前 后排桩的最大水平位移 相等, 随着锚固力的增大, 两者之间的差异越来越

增刊 胡贺祥等 : 锚杆对双排桩结构变形和受力影响分析 519 明显, 呈现前排桩位移较大, 后排桩位移较小的趋势, 这可能也与锚固力直接作用在后排桩上有关 桩侧移 /mm 5 3 1 35 3 5 15 1 5 1 3 5 桩顶锚固力 F/kN 图 13 不同锚固力的桩身最大水平位移 Fig.13 Maximum horizontal displacement of the pile at different anchorage forces 前排桩最大 最小弯矩绝对值的最大值随锚固 力的变化如图 所示 控制弯矩同样取两条线中靠 上的部分, 由图可见, 随着锚固力的增大, 前排桩 弯矩改善效果并不明显, 只在锚固力 F 在 1 kn 时稍有减小, 在 F 超过 1 kn 后, 前排桩最大弯 矩持续增加 最大正弯矩随锚固力增大, 先减小后 增大, 这与其发生位置由深度.3 m 左右移至桩顶 有关 35 3 5 15 1 图 不同锚固力的前排桩最大弯矩 Fig. Maximum bending moment of the front row pile at different anchorage forces 后排桩最大 最小弯矩绝对值的最大值随锚固 力的变化如图 15 所示 控制弯矩同样取两条线中靠 上的部分, 由图可见, 后排桩的配筋和截面始终由 负弯矩绝对值的最大值控制 ; 随着锚固角度的增大, 后排桩弯矩改善效果在 F< kn 时明显下降, 在 F> kn 时持续增加 最大正弯矩随锚固力增大先 减小后增加, 这与其发生位置由深度 1 m 以下移 至桩顶有关 1 3 5 5 桩顶锚固力 F/kN 1 3 5 桩顶锚固力 F/kN 图 15 不同锚固力的后排桩最大弯矩 Fig.15 Maximum bending moment of the back row pile at different anchorage forces 5 结论 (1) 相对于不设锚杆的双排桩, 设置锚杆后 的双排桩能有效减小桩身变形和受力, 且支护结构 施工均在地面进行, 锚杆浆体养护可与桩身混凝土 养护同步, 基坑开挖无支撑, 能有效缩短工期 () 锚杆设置在后排桩, 对其施加一个向下 的轴力分量, 后排桩由拉弯构件变为压弯构件, 能 改善其受力状态, 更多发挥混凝土的受压优势 (3) 锚固角度的增加能有效减小双排桩的最大 水平位移和后排桩的桩身控制弯矩, 但减小幅度随 锚固角度增大而减小 ; 在实际设计中, 在周边环境 允许的条件下, 应尽可能增加锚杆与后排桩的夹角 () 锚固力的增加对双排桩结构的变形控制 作用明显, 能显著降低桩身最大水平位移, 减小幅 度也随锚固力的增加而减小 ; 锚固力较大时会增大 桩的控制弯矩, 使桩的截面或配筋增加 在实际设 计中, 锚固力不应过大, 可随信息化施工对基坑变 形进行主动控制 参考文献 [1] 田力. 双排桩复合预应力锚杆支护结构在绿地中央广 场深基坑中的应用 [D]. 郑州 : 郑州大学,. [] 高美玲. 单支点双排桩复合锚杆支护结构受力分析及 FLAC3D 数值模拟 [D]. 北京 : 中国地质大学,. [3] 姚仰平, 张丙印, 朱俊高. 土的基本特性 本构关系及 数值模拟研究综述 [J]. 土木工程学报,, 5(3): 7-15. YAO Yang-ping, ZHANG Bing-yin, ZHU Jun-gao. Behaviors, constitutive models and numerical simulation of soils[j]. China Civil Engineering Journal,, 5(3): 7-15. 下转第 57 页

第 35 卷增刊 岩土力学 Vol.35 Supp. 年 1 月 Rock and Soil Mechanics Oct. 收稿日期 :--1 基金项目 : 中国建筑股份有限公司科技研发课题 (No. CSCEC--1,No. CSCEC-1-) 第一作者简介 : 胡贺祥, 男,195 年生, 硕士, 主要从事地下结构工程和岩土数值计算等方面的研究工作 E-mail:huhexiang5@13.com