59 500,000 500,000 6BA(5) 50,000 59I (i) 18 (ii) (iii) (iv) (v) (vi) (vii) 200,000 12 50
509 200,000 200,000 6 (i) (ii) 200,000 500,000 12 282 51
15 14 7 2 7 14 7 14 24 40 2 6 100,000 6 100,000 57 43C (i) (ii) (i) (ii) 52
43D 60 14 5 50,000 43F 43C (i) (ii) 314 115 38A (i) (ii) (i) (ii) 350,000 53
608 7 32.5 485 6018 65 60 25,000 7,100 30,000 7,100 5% 1,250 1,500 5% 25,000 30,000 60 54
123 587 (Project Administration Handbook for Civil Engineering Works) 55
2 52 52 94 (a) (b) (c) (d) 583 56
8 1. 2. 3. 4. 201 5. 6. 7. 8. i. ii. 9. 6 10. 57
11. 10 A. B. C. D. 583 3 5 (i) 3 (ii) 5 5 50,000 58 (i) (ii) (a) (b) 58
58 3 10,000 2014 59AC (i) 18 (ii) 200,000 12 59
59J (i) (ii) (iii) (iv) (v) (i) 18 (ii) (iii) 200,000 12 7A 60
6 12 (i) (ii) 28 14 (i) (ii) 61
7A BS 7121 (i) (ii) (i) (ii) 409 (iii) 62
28 14 311Z 19 560 200,000 63
(a) (i) (ii) (b) 50,000 619 (i) (ii) (iii) (a) (b) (c) (i) (ii) (iii) (iv) 64
10% 65