energies Article Establishment and Analysis of Energy Consumption Model of Heavy-Haul Train on Large Long Slope Qiwei Lu 1, *, Bangbang He 1, Mingzhe

Similar documents
m m m ~ mm

Vol. 22 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug GPS,,, : km, 2. 51, , ; ; ; ; DOI: 10.

Microsoft PowerPoint _代工實例-1

國家圖書館典藏電子全文

http / /yxxy. cbpt. cnki. net / % % %

Microsoft Word - 刘 慧 板.doc

2 ( 自 然 科 学 版 ) 第 20 卷 波 ). 这 种 压 缩 波 空 气 必 然 有 一 部 分 要 绕 流 到 车 身 两 端 的 环 状 空 间 中, 形 成 与 列 车 运 行 方 向 相 反 的 空 气 流 动. 在 列 车 尾 部, 会 产 生 低 于 大 气 压 的 空 气 流

输电线路智能监测系统通信技术应用研究

/MPa / kg m - 3 /MPa /MPa 2. 1E ~ 56 ANSYS 6 Hz (a) 一阶垂向弯曲 (b) 一阶侧向弯曲 (c) 一阶扭转 (d) 二阶侧向弯曲 (e) 二阶垂向弯曲 (f) 弯扭组合 2 6 Hz

University of Science and Technology of China A dissertation for master s degree Research of e-learning style for public servants under the context of

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut

85% NCEP CFS 10 CFS CFS BP BP BP ~ 15 d CFS BP r - 1 r CFS 2. 1 CFS 10% 50% 3 d CFS Cli

Microsoft Word - TIP006SCH Uni-edit Writing Tip - Presentperfecttenseandpasttenseinyourintroduction readytopublish

LH_Series_Rev2014.pdf

untitled


國立中山大學學位論文典藏.PDF

~ ~

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel

a b

Microsoft PowerPoint - ryz_030708_pwo.ppt

Microsoft Word 張嘉玲-_76-83_

THE APPLICATION OF ISOTOPE RATIO ANALYSIS BY INDUCTIVELY COUPLED PLASMA MASS SPECTROMETER A Dissertation Presented By Chaoyong YANG Supervisor: Prof.D

m 3 m m 84 m m m m m m m

論文集29-1_前6P.indd

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y

<4D F736F F D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378>

WTO

2005 5,,,,,,,,,,,,,,,,, , , 2174, 7014 %, % 4, 1961, ,30, 30,, 4,1976,627,,,,, 3 (1993,12 ),, 2

Microsoft Word - A doc

Microsoft Word 谢雯雯.doc

~ a 3 h NCEP ~ 24 3 ~ ~ 8 9 ~ km m ~ 500 m 500 ~ 800 m 800 ~ m a 200

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5

PowerPoint Presentation

東吳大學

% GIS / / Fig. 1 Characteristics of flood disaster variation in suburbs of Shang

1.0 % 0.25 % 85μm % U416 Sulfate expansion deformation law and mechanism of cement stabilized macadam base of saline areas in Xinjiang Song

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi

08陈会广

BC04 Module_antenna__ doc

IPCC CO (IPCC2006) 1 : = ( 1) 1 (kj/kg) (kgc/gj) (tc/t)

地質調査研究報告/Bulletin of the Geological Survey of Japan

untitled

度 身 體 活 動 量 ; 芬 蘭 幼 兒 呈 現 中 度 身 體 活 動 量 之 比 例 高 於 臺 灣 幼 兒 (5) 幼 兒 在 投 入 度 方 面 亦 達 顯 著 差 異 (χ²=185.35, p <.001), 芬 蘭 與 臺 灣 幼 兒 多 半 表 現 出 中 度 投 入 與 高 度

1 引言

第二十四屆全國學術研討會論文中文格式摘要

Microsoft Word tb 赵宏宇s-高校教改纵横.doc

附件1:

标题

untitled

Chapter 24 DC Battery Sizing

; 3/2, Buck-Boost, 3 Buck-Boost DC-DC ; Y, Fig. 1 1 BBMC The topology of three phase-three phase BBMC 3 BBMC (Study on the control strategy of

% % % % % % ~

Settlement Equation " H = CrH 1+ e o log p' o + ( p' p' c o! p' o ) CcH + 1+ e o log p' c + p' f! ( p' p' c c! p' o ) where ΔH = consolidation settlem

Abstract There arouses a fever pursuing the position of being a civil servant in China recently and the phenomenon of thousands of people running to a

报 告 1: 郑 斌 教 授, 美 国 俄 克 拉 荷 马 大 学 医 学 图 像 特 征 分 析 与 癌 症 风 险 评 估 方 法 摘 要 : 准 确 的 评 估 癌 症 近 期 发 病 风 险 和 预 后 或 者 治 疗 效 果 是 发 展 和 建 立 精 准 医 学 的 一 个 重 要 前

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [

untitled


34 22 f t = f 0 w t + f r t f w θ t = F cos p - ω 0 t - φ 1 2 f r θ t = F cos p - ω 0 t - φ 2 3 p ω 0 F F φ 1 φ 2 t A B s Fig. 1

我国原奶及乳制品安全生产和质量安全管理研究

第一章 出口退税制改革的内容

11 25 stable state. These conclusions were basically consistent with the analysis results of the multi - stage landslide in loess area with the Monte

國立中山大學學位論文典藏.PDF

2/80 2

UDC Empirical Researches on Pricing of Corporate Bonds with Macro Factors 厦门大学博硕士论文摘要库

(baking powder) 1 ( ) ( ) 1 10g g (two level design, D-optimal) 32 1/2 fraction Two Level Fractional Factorial Design D-Optimal D

Microsoft PowerPoint - Ch5 The Bipolar Junction Transistor

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip

Microsoft Word - 刘藤升答辩修改论文.doc

mm 400 mm 15 mm EOF mm/10a Fig. 1 Distributions

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm


: 307, [], [2],,,, [3] (Response Surface Methodology, RSA),,, [4,5] Design-Expert 6.0,,,, [6] VPJ33 ph 3,, ph, OD, Design-Expert 6.0 Box-Behnken, VPJ3

和文タイトル

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代

(2005 (2006, (2006 ( , ( ,,,,,, ( (ASFR ASFR : x, B x x, P f x x (1 (2 4,, , 2 1 :, 1 2, 20-29


by industrial structure evolution from 1952 to 2007 and its influence effect was first acceleration and then deceleration second the effects of indust

Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditio

Abstract Since 1980 s, the Coca-Cola came into China and developed rapidly. From 1985 to now, the numbers of bottlers has increased from 3 to 23, and

天 主 教 輔 仁 大 學 社 會 學 系 學 士 論 文 小 別 勝 新 婚? 久 別 要 離 婚? 影 響 遠 距 家 庭 婚 姻 感 情 因 素 之 探 討 Separate marital relations are getting better or getting worse? -Exp

穨423.PDF

Shanghai International Studies University A STUDY ON SYNERGY BUYING PRACTICE IN ABC COMPANY A Thesis Submitted to the Graduate School and MBA Center I

[1-3] (Smile) [4] 808 nm (CW) W 1 50% 1 W 1 W Fig.1 Thermal design of semiconductor laser vertical stack ; Ansys 20 bar ; bar 2 25 Fig

一次辽宁暴雨过程的诊断及风场反演分析

Microsoft Word - KSAE06-S0262.doc

%

168 健 等 木醋对几种小浆果扦插繁殖的影响 第1期 the view of the comprehensive rooting quality, spraying wood vinegar can change rooting situation, and the optimal concent

Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial

吴 郁 玲 等 : 农 户 对 宅 基 地 使 用 权 确 权 效 应 的 认 知 研 究 以 武 汉 市 为 例 29 the paper tried to provide a basis to improve the confirmation policy efficiency and to f

具有多个输入 特别是多个输出的 部门 或 单位 ( 称为 决策单元 Decision Making Unit 简称 DMU) 间的相对有效 8 性 C2R 模型是 DEA 的个模型 也是 DEA 的基础 和重要模型 假设有 n 个决策单元 DMUj( j = n) 每个 DMU 有 m

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315.



PowerPoint Presentation

2005 3,, :,,,, (),,,,, [],,,,,,,,,,, (),, (,, ),,,,,,,,,,,,,,,,,,,,,,,,,( ),, :,,, :,?,,, :,1999,

致 谢 开 始 这 篇 致 谢 的 时 候, 以 为 这 是 最 轻 松 最 愉 快 的 部 分, 而 此 时 心 头 却 充 满 了 沉 甸 甸 的 回 忆 和 感 恩, 一 时 间 竟 无 从 下 笔 虽 然 这 远 不 是 一 篇 完 美 的 论 文, 但 完 成 这 篇 论 文 要 感 谢


Microsoft Word 任 辉_new_.doc

Transcription:

energies Article Establishment and Analysis of Energy Consumption Model of Heavy-Haul Train on Large Long Slope Qiwei Lu 1, *, Bangbang He 1, Mingzhe Wu 1, Zhichun Zhang 2, Jiantao Luo 2, Yankui Zhang 1, Runkai He 1 and Kunyu Wang 1 1 School of Mechanical Electronic and Information Engineering, China University of Mining and Technology, Beijing 100083, China; he_bangbang@163.com (B.H.); mingzhe_wu@163.com (M.W.); lantingzhixi@126.com (Y.Z.); hrk1995@outlook.com (R.H.); cumtbky98@163.com (K.W.) 2 Shenshuo Railway Branch Company of China Shenhua, Yulin 719316, China; 13811546154@163.com (Z.Z.); wzyzdqgs15@163.com (J.L.) * Correspondence: lqw@cumtb.edu.cn; Tel.: +86-010-6233-1180 Received: 19 March 2018; Accepted: 16 April 2018; Published: 17 April 2018 Abstract: AC heavy-haul trains produce a huge amount of regenerative braking energy when they run on long downhill sections. If this energy can be used by uphill trains in the same power supply section, a reduction in coal transportation cost and an improvement in power quality would result. To accurately predict the energy consumption and regenerative braking energy of heavy-haul trains on large long slopes, a single-particle model of train dynamics was used. According to the theory of railway longitudinal section simplification, the energy consumption and the regenerative braking energy model of a single train based on the train attributes, line conditions, and running speed was established. The model was applied and verified on the Shenshuo Railway. The results indicate that the percentage error of the proposed model is generally less than 10%. The model is a convenient and simple research alternative, with strong engineering feasibility. Based on this foundation, a model of train energy consumption was established under different interval lengths by considering the situation of regenerative braking energy in the multi-train operation mode. The model provides a theoretical foundation for future train diagram layout work with the goal of reducing the total train energy consumption. Keywords: energy consumption; heavy-haul train; large long slope; regenerative braking 1. Introduction Most of China s coal resources are concentrated in Shanxi, Shaanxi, and western Inner Mongolia, whereas East China and South China are the major coal consumption areas. This energy distribution determines the overall flow of transportation of coal from West China to East China. Among the numerous coal transportation modes, the railway has the largest proportion, accounting for more than 60% the total coal transportation. Owing to the high western and low eastern topographical features coupled with complicated curved sections, the electric railway coal line tends to exist on the long slope section, resulting in the frequent transition of trains between the traction and braking work states. For example, Shenshuo Railway, an important coal transportation line from Daliuta to Shuoxi in China, has a ramp of more than 6 on the 150 km line and total length of 266 km, with a maximum gradient of 12. To make full use of a train s braking energy, current mainstream electric traction locomotives mostly adopt four-quadrant converters [1 5], which regenerate the regenerative braking energy by pantograph feedback to the catenary to recover the braking energy. If the feedback power cannot be used by other loads in the same traction substation, or the braking power exceeds the power required by other loads, the excess energy flows to the public power grid [6 8]. However, feedback Energies 2018, 11, 965; doi:10.3390/en11040965 www.mdpi.com/journal/energies

Energies 2018, 11, 965 2 of 20 into power networks can cause harmonic pollution and reduce the power quality [9,10]. At the same time, the current tariff policy does not refund the electricity fee due to feedback power; therefore, it fails to achieve the purpose of reducing the transportation cost of coal. To avoid braking energy feedback to the public power grid, the current technical solutions are: energy storage [7,10 12], inverter feedback [10 12], and inverter load [12]. Because coal-laden trains are heavy-haul trains, which are powerful and have a long running time, regenerative braking energy needs to be recovered by energy storage devices with high energy density and large volume. Obviously, this energy storage type is costly and difficult to operate [10]. The feedback of energy back to the railway company is of the low-voltage power grid inverter feedback type, which requires the installation of a converter to ensure the stability of the load electricity. Moreover, there is typically a long distance between trains and railway companies, and the transmission costs are high [11]. Electricity fed back to the pantograph is used by trains or other loads operating in the reverse direction within the same supply interval, known as the inverter load solution, which is a less expensive and more efficient means of utilization. Considering the characteristics of the electrified railway system, it is possible to increase the overlapping time of the up and down trains in the same power supply area by reasonably arranging the train operation plans without affecting the traffic volume and safety restrictions. As a result, the regenerative braking energy can be used optimally by the reverse running train to reduce the energy consumption and the coal transportation cost. The basis for achieving this goal is to establish accurate energy consumption models for heavy-haul trains working on long large slopes. To date, several researchers have investigated the establishment of a train energy consumption model. Kang et al. [13] considered the pylons at the train network pressure, the average active current, running time, and other factors, to propose such a model. However, the model must be based on the existing train operation diagram, as well as the measured voltage and current statistical calculations. Furthermore, the model does not incorporate train attributes (e.g., marshalling conditions, tractor type, and train quality) and line characteristics. Xue et al. [14] divided the operation route into several sections. Considering factors such as train attributes and grade, the traction process of the train was divided into five situations starting, stopping, running, idling, and finally entering/leaving and switching and then determined the corresponding energy consumption calculation formula was determined. This model is more comprehensive and detailed, but, due to the long-distance and long-haul characteristics of heavy-haul trains, the model is too complicated and not conducive to the subsequent optimization of train operation plans. In [15], the acceleration of freight trains within a unit distance was approximately constant. Based on the law of conservation of energy, a locomotive energy consumption model within each unit distance interval was constructed. The model is considered comprehensively, and the expression is simple. However, when the model is applied under complex road conditions, the train resistance work becomes a complex integral formula, which makes it difficult to obtain analytical solutions. Train traction calculation models generally adopt the single-particle model or the multi-particle model [16 18], which is the foundation of the energy consumption model. The single-particle model is easy to analyze, and the solution is simple. However, it contains an error in the calculation of the force near the point when the train changes and the curve point is changed [16,18]. The multi-particle model solves the above this shortcoming. However, the model itself is complicated and computationally expensive [18]. Since the optimized train diagram relies on a very complicated mathematical model, and errors involved in the line and locomotive properties cannot be avoided, prediction of the energy does not required the particularly accurate train stress analysis of the multi-particle model. Moreover, heavy-haul trains are different from underground trains in that they have larger groupings, longer bodies, and complicated lines. It is very difficult to establish the stress analysis accurately. Even if it can be done, it is difficult to guarantee that the accuracy of the prediction can be significantly improved. This is because the errors caused by the actual quality of the train, the line data, the empirical formula of resistance, and the loss of various equipment cannot be completely eliminated.

Energies 2018, 11, 965 3 of 20 The model established in this study, through the introduction of the additional coefficient of energy consumption and power generation, comprehensively considers these actual influencing factors, especially the efficiency of trains. The purpose of this study was to establish a simple mathematical model for predicting train energy consumption and regenerative braking energy, and to predict power consumption in all power supply sections and multiple trains running on large long-slope lines, and then lay on the optimization of the operation map with the lowest energy consumption. For this reason, the model not only requires certain accuracy, but also must be simple to reduce the energy consumption forecast and the calculation amount when the running chart is optimized. The main contribution of this study can be summarized as follows: Based on the single-particle point dynamics model and line profile reduction theory, as well as the train attributes, line condition, and speed, an energy consumption and regenerative braking energy model for the long large slope line was established. The current train diagram of the Shenshuo Railway was used as an example to verify that the percentage error of the model is generally below 10%. Based on verifying the basic accuracy of the energy consumption and regenerative braking model of a single train, considering the case where the regenerative braking energy of a certain train is used by the other trains, the power consumption of multiple trains in the same power supply section was deduced. Although this model is only an application of the single-vehicle model, it only theoretically considers the recovery of regenerative braking energy and does not combine the actual electrical parameters and grid factors to influence the regenerative braking energy recovery. To date, many researchers have studied the electrical parameters affecting the regenerative braking energy [19 22]; using the results of this paper and combining the conclusions of these documents, more accurate energy consumption calculations can be performed. The paper is organized as follows: Section 2 details the model-building process. Validation methods and conclusions are developed in Section 3. Our conclusions are presented in Section 4. 2. Model Formulation 2.1. Model Symbols The following symbols and definitions are given: Figure 1 represents the entire operating line, which is a linear railway network composed of n substations and 2n power supply intervals; the train runs on the double-track. The starting position of each power supply range is s 0, s 1,, s 2n 1. The end position of the 2n-th power supply section is s 2n. The power supply interval (s k, s k+1 ) indicates that the train is running in the upward direction, (s k+1, s k ) indicates that the train is running in the downward direction, where 0 k 2n 1. The sequence of the train running in the upward direction is {x 1, x 2,, x α }, where α is the total number of trains. The corresponding set of train quality is {M x1, M x2,, M xα }, where M xi = P xi + G xi, 1 i α. P xi represents the weight of the traction locomotive for x i and G xi represents the load of x i. The units are kilonewtons. The corresponding set of train length is {L x1, L x2,, L xα }. The sequence of the train running in the downward direction is {y 1, y 2,, y β }, where β is the total number of trains. The corresponding set of train quality is {M y1, M y2,, M yβ }, where M yj = P yj + G yj, 1 j β. P yj represents the weight of the traction locomotive for y j and G yj represents the load of y j. The units are kilonewtons. The corresponding set of train length is {L y1, L y2,, L yα }. Train x i reaches s k at t i,k and train y j reaches s k at τ j,k. The instantaneous speed of the upward train x i is v i and the instantaneous speed at s k is v i,k ; the instantaneous speed of the downward train y j is υ j and the instantaneous speed at s k is υ j,k.

Energies 2018, 11, 965 4 of 20 The acceleration of x i is a i ; the acceleration of y j is a j. The length of the interval (s k, s k+1 ) is L k. The calculation of the gradient permillage of the interval (s k, s k+1 ) is i hjk, and it is i hjk in the interval (s k+1, s k ). A positive number represents the uphill direction. The discriminant symbol function is defined as ε(t) = { 1, t > 0 0, t 0. (1) Figure 1. Schematic diagram of running line. 2.2. Model Assumptions According to the operation characteristics of an electrified railway system, the following assumptions are proposed: (1) The train s running direction does not change during the running process. The train will not stop at any stop apart from the terminal station. (2) The tractive force and braking force of the train are continuous. (3) The traction mode and the braking mode of the train do not coexist within the same power supply range. (4) The impact of weather, parking, network voltage fluctuations, transmission line losses, and other factors of train energy consumption are ignored. (5) When the train generates regenerative braking energy, the consumption of vehicle auxiliary equipment is considered to be one of the factors affecting the energy conversion rate of regenerative braking [23]. If the feedback energy cannot be used in time, it will be directly fed back to the public power grid. (6) The phase separation distance is not considered. (7) Unless otherwise stated, each variable unit adopts the SI system. 2.3. Train Stress Analysis and Line Profile Reduction To simplify the analysis, as shown in Figure 2a, the whole train is regarded as a mass point. Combined with the single-particle point dynamics model, the resultant force of the train during the uphill traction is given by C 1 = F f f, (2) where F is the traction, f is the basic resistance and f is the additional resistance. Figure 2. Train stress diagram, (a) the uphill traction; (b) the downhill braking.

Energies 2018, 11, 965 5 of 20 As shown in Figure 2b, the resultant force of the train during the downhill braking is where F is the braking force. The empirical formulas for f is C 2 = f F f, (3) f = Pω 1 (v) + Gω 2 (v), (4) where P represents the weight of the traction locomotive and G represents the load of the train; ω 1 (v) and ω 2 (v) are, respectively, the unit basic resistance of traction locomotive and the truck; ω n (v) = A n v 2 + B n v + C n (n = 1, 2) and A n, B n and C n are empirical constants that consider the basic resistance; and v is the train speed [14]. The additional resistance f is mainly caused by ramps and curves. Due to the length of heavy-haul trains, there may be several small ramps and curves in the areas covered during train operation, making the calculation of f is more complicated. To simplify the model and reduce the calculation workload, combined with line profile reduction theory, f is given by ( f = M 1 a L i x l x + 600 x=1 b k=1 ) l rx, (5) R x where the total quality of train is M, and M = P + G; L is the length of the train; a and b are the numbers of ramps and curves covered by the train; i x and l x are, respectively, gradient slope and length of the x-th ramp covered by the train; and l rx and R x are, respectively, length and radius of the x-th curve covered by the train [13,24]. At the same time, the short ramps and curves in the same power supply interval are also simplified and converted into fractional ramps. The calculation of gradient permillage of the power supply interval (s k, s k+1 ) is ( i hjk = 1 lk L k i x l x + 600 x=1 p k k=1 ) l rx, (6) R x where l k and p k are the numbers of ramps and curves in the interval (s k, s k+1 ); i x and l x are, respectively, gradient slope and length of the x-th ramp; and l rx and R x are, respectively, length and radius of the x-th curve. After the interval line is simplified, the average of f in (s k, s k+1 ) is 2.4. Energy Consumption Model f = Mi hjk. (7) When the train goes uphill, the direct form of energy consumption is the traction work. Traction work is used to overcome resistance and leads to changes in kinetic energy. According to the law of conservation of energy, the energy consumption can be expressed as W = (W f + W f + E)/η 1,k, (8) where W f = f ds is the work of the basic resistance f ; W f = f ds is the work of the additional resistance f ; E is the change in the kinetic energy; and η 1,k is the additional coefficient of energy consumption in the k-th uphill interval, which can be regarded as a constant considering the power factor, electrical equipment efficiency, mechanical transmission efficiency, and line characteristics.

Energies 2018, 11, 965 6 of 20 If Figure 2a is taken as a longitudinal section of the train x i running in the interval (s k, s k+1 ), combining Equations (4), (7) and (8), the running energy consumption of x i in this interval is W i,k = s k+1 s ( f + f )/η k 1,k ds + E/η 1,k ( f + f )L k /η 1,k + E/η 1,k ] = [P xi ω 1 (v i ) + G xi ω 2 (v i ) + M xi i hjk L k /η 1,k + 1000M xi (v 2 i,k+1 v2 i,k )/(2η 1,kg), (9) where g = 9.8 m/s 2 is the gravitational acceleration, and 1000M xi /g is the quality of y j (in units of kilograms). The speed of a heavy-haul train and its speed changes during operation are small. It can be seen from Equation (4) that the basic resistance is a quadratic equation with respect to speed, however, the corresponding coefficients A n and B n of the train are much smaller than C n (A 1, B 1, and C 1 of HXD1 locomotive are 0.000279, 0.0065, and 1.2, respectively; A 2, B 2, and C 2 of the truck are 0.000125, 0.0048, and 0.92, respectively; and A 1, B 1, and C 1 of HXD1 locomotive are 0.000125, 0.0048, and 2.25, respectively [13]) Therefore, the speed of the train and its changes have little effect on the running resistance, and the average train speed v i in (s k, s k+1 ) is selected as v i to easily solve the integral. Because (s k, s k+1 ) is the uphill interval, that is, i hjk > 0, ε(i hjk ) = 1, the train will not feed back electrical energy. According to Equations (1) and (9), the energy consumption of x i in the entire interval (s 0, s 2n ) is 2n 1 W i = ε(i hjk )W i,k. (10) k=0 Similarly, if (s k+1, s k ) is the uphill interval, that is, i hjk > 0, ε( i hjk ) = 1, the energy consumption of y j in the entire interval (s 2n, s 0 ) is W j = 0 ε( i hjk )W j,k, (11) k=2n 1 where W j,k is the running energy consumption of y j in the interval (s k+1, s k ), which is given by W j,k = s k s ( f + f )/η k+1 1,k ds + E/η 1,k ( f + f )L k /η 1,k + E/η 1,k ] = [P yj ω 1 (υ j ) + G yj ω 2 (υ j ) M yj i hjk L k /η 1,k + 1000M yj (υ 2 j,k υ2 j,k+1 )/(2η 1,kg), (12) where 1000M yj /g is the quality of y j (in units of kilograms), and v j is the average speed in (s k+1, s k ). 2.5. Regenerative Braking Energy Model When the train goes downhill, the change of potential energy caused by the additional resistance f is partly used to overcome the basic resistance, and the other part is transformed into the regenerative braking energy and the variation of the train kinetic energy. Therefore, the regenerative braking energy generated by the train is W = (W f + W f + E)η 2,k, (13) where η 2,k is the additional coefficient of power generation in the k-th downhill interval, which can be regarded as a constant considering the regenerative braking energy conversion rate and line characteristics. If Figure 2b is taken as a longitudinal section of train x i running in the interval (s k, s k+1 ), according to Equations (4), (7) and (11), the regenerative braking energy generated by x i in this interval is W i,k = s k+1 s η k 2,k ( f f )ds + η 2,k E η 2,k ( f f )L k + η 2,k E = η 2,k [ M xi i hjk P xi ω 1 (v i ) G xi ω 2 (v i ) ]L k + 1000η 2,k M xi (v 2 i,k+1 v2 i,k )/(2g), (14) where it should be noted if i hjk < 0, the additional resistance f does positive work.

Energies 2018, 11, 965 7 of 20 If (s k, s k+1 ) is the downhill interval, that is, i hjk < 0, ε( i hjk ) = 1, the train does not consume electrical energy and it is not necessary to calculate the energy consumption in this interval. According to Equations (1) and (14), the regenerative braking energy of x i in the entire interval (s 0, s 2n ) is W i = 2n 1 ε( i hjk )W i,k. (15) k=0 Similarly, if (s k+1, s k ) is the downhill interval, that is, -i hjk < 0, ε(i hjk ) = 1, the regenerative braking energy of y j in the entire interval (s 2n, s 0 ) is W j = 0 ε(i hjk )W j,k, (16) k=2n 1 where W j,k is the running energy consumption of y j in the interval (s k+1, s k ), which is given by W j,k = s k s η k+1 2,k ( f f )ds + η 2,k E η 2,k ( f f )L k + η 2,k E = η 2,k [ M yj i hjk P yj ω 1 (υ j ) G yj ω 2 (υ j ) ]L k + 1000η 2,k M yj (υ 2 j,k υ2 j,k+1 )/(2g). (17) 2.6. Determination of Additional Coefficients η 1,k and η 2,k The hold-out method in [25] is used to determine the additive coefficient. According to Equations (9) and (12) or Equations (14) and (17), the energy consumption or regenerative braking energy of several trains in a certain interval is calculated as the training set S. The actual value of energy consumption or regenerative braking energy is measured by the vehicle instrument. The metric is the smallest mean squared error e of the calculated values in S and the corresponding measured values. For example, when determining the additional coefficient η 1,k of the uphill interval (s k, s k+1 ), the regenerative braking energy {W 1,k, W 2,k,..., W x,k } of the x trains can be calculated by Equations (9). Assume that the corresponding measured value is {Q 1,k, Q 2,k,..., Q x,k }, and let the mean square error e(η 1,k ) = 1 x x i=1 (W i,k Q i,k ) 2 (18) of the two sets of data take a minimum to obtain η 1,k ; the same method can be used to obtain η 2,k. 2.7. Total Energy Consumption of Multi-Train in a Power Supply Interval If the train s braking process is synchronized with the traction phase of a train running in the reverse direction within the same power supply interval, the overlapping time of this synchronization process will allow the former s regenerative braking energy to be transmitted to the latter s through the overhead line, thereby reducing the total energy consumption [26 28]. Figure 3 represents the flow of the energy consumption and regenerative braking energy of the train. The electrical energy fed back by the downhill train y j can be used during the traction of train x i+1 in the previous power supply interval. The braking energy generated by the downhill train x i can also be used by the uphill train y j+1 in the latter s power supply range. The power time distribution of the train in Figure 4 corresponds to Figure 3. The red area shows the energy consumption of the train, the green area shows the regenerative braking energy, the orange area shows the regenerative braking energy that can be used, and the time axis section enclosed by the dotted lines is the overlapping time t.

Energies 2018, 11, 965 8 of 20 Figure 3. Flow of energy consumption and regenerative braking energy. Figure 4. Power time distribution of train. In Figure 5, it is obvious that: If P > P, the consumed power P of the traction trains is partly provided by the grid (P ); the other part comes from the feedback power P of the trains running in the reverse direction within the same power supply interval. If P P, the traction trains do not take power from the grid, and P is entirely provided by P. If P < P, the regenerative braking energy cannot be fully utilized. Figure 5. Power source of traction trains in a certain power supply interval. Combining Figures 4 and 5, whether the regenerative braking energy in a certain power supply interval can be fully utilized needs to be considered for the following: The overlapping time t of the two types of trains running. The total electrical power of all braking train feedback is compared to the total consumed power of all traction trains in t. In this multi-train mode of operation, to establish the total energy consumption model of all trains in the power supply interval (s k, s k+1 ) for a certain time period, the length of the power supply interval

Energies 2018, 11, 965 9 of 20 should be considered first, because the complexity of the modeling is different based on the different numbers of trains in one interval. All the following situations involve the discussion of train operation in the interval (s k, s k+1 ), assuming that i hjk < 0. 2.7.1. Model with Shorter Supply Intervals When the length of the power supply section is less than the safe running distance of the train, no more than one train exists on the upper and lower rails in the same power supply section at any time. Consider the six types of possible operation of the train in the time period (t i,k, t i,k+1 ), as shown in Figure 6a f. In the figure, the green line represents the running track of the upward train x i, and regenerative braking energy is generated. The red line represents the running track of the downward train y j, which consumes the electrical energy (as below). Figure 6. The train diagram of x i and y j in (t i,k, t i,k+1 ). In Figure 6a,f, there is no overlapping time between two trains, and the electrical energy fed back by x i will flow to the public grid and cannot be used by y j running in the opposite direction. In other cases, the overlapping time of two trains is } } T i,j,k = min {τ j,k, t i,k+1 max {t i,k, τ j,k+1. (19) Combining Equations (2) (5), the traction power consumption P j,k and the regenerative braking power generationin T i,j,k are approximately P j,k = [ ( f + f ] )υ j + M yj a j /η1,k [ ( = P yj ω 1 (υ j ) + G yj ω 2 (υ j ) + M yj a L xj x=1 i x l x + 600 b )] l rx R x υ j /η 1,k + M yj a j /η 1,k. k=1 [ P i,k = η 2,k ( f ] f )υ j M yj a j [ ( M a = η xi 2,k L i xi x l x + 600 b ) ] l rx R x P xi ω 1 (v i ) G xi ω 2 (v i )+ v i η 2,k M xi a i. x=1 k=1 We denote P (1) i,j,k = min { P j,k, P i,k } (20) (21) (22)

Energies 2018, 11, 965 10 of 20 Combining with Equations (1), (19), (20) and (22), when the length of the power supply section is less than the safe running distance of the train, the total energy consumption in (t i,k, t i+1,k ) is W i,j,k = 2.7.2. Model with Longer Supply Intervals min{τj,k,t i,k+1 } max{t i,k,τ j,k+1 } [ P j,k ε(t i,j,k )P (1) ] i,j,k dt (23) When the length of the power supply interval is greater than the safe running distance of the train, there may be a multitude of trains on the upward and downward tracks in the same power supply interval. The model in this case is relatively complicated. However, considering the influence of the weight, density, and speed of heavy-haul trains on the working voltage of the catenary, the length of the power supply interval generally does not exceed twice the safe running distance of the train. The following discussion is only for the case of a maximum of two trains running under the same power interval in (t i,k, t i+1,k ). The following four events are given according to the time of the incoming and outgoing power supply intervals (s k, s k+1 ) of the adjacent trains x i 1, x i, and x i+1 : (1) Train x i arrived at s k, train x i 1 left the interval (left the s k+1 ); (2) Train x i arrived at s k, train x i 1 did not leave the interval (left the s k+1 ); (3) Train x i+1 arrived at s k, train x i did not leave the interval (left the s k+1 ); and (4) Train x i+1 arrived at s k, train x i left the interval (left the s k+1 ), where (1) and (2) are reciprocal, and (3) and (4) are reciprocal. Therefore, when t (t i,k, t i+1,k ), there are four possible types of train operation, as summarized in Table 1. Situation Event Relationship Table 1. Four possible train operation situations. Mathematical representation Train Operation 1 (1) (3) t i 1,k+1 t i,k and t i+1,k t i,k+1 Only train x i runs in (t i,k, t i+1,k ) 2 (1) (4) t i 1,k+1 t i,k and t i+1,k t i,k+1 Only train x i run in (t i,k, t i,k+1 ); no trains run in (t i,k+1, t i+1,k ) 3 (2) (4) t i 1,k+1 t i,k and t i+1,k t i,k+1 The train x i 1 and x i run in (t i,k, t i 1,k+1 ); only train x i run in (t i 1,k+1, t i+1,k ) 4 (2) (3) t i 1,k+1 t i,k and t i+1,k t i,k+1 only train x i run in (t i 1,k+1, t i,k+1 ); The train x i 1 and x i run in (t i,k, t i 1,k+1 ); no train run in (t i,k+1, t i+1,k ) As it can accommodate up to two trains running in the running direction of the power supply interval, when train x i runs in the section, whether it runs with the former train x i 1 or the latter train x i+1 at the same time, it is described by the intersection of the two events. Taking Case 1 as an example, there are 14 possible operations of the upward and downward trains, as shown in Figure 7a n. The total energy consumption in (t i,k, t i+1,k ) is analyzed by considering the energy consumption of the tractor in the up interval (s k+1, s k ). We denote t (1) { } i,j,k = max t i,k, τ j,k+1 t (2) { } i,j,k = min t i+1,k, τ j,k t (3) { } i,j,k = (24) max τ j,k, τ j+1,k+1 t (4) { } i,j,k = min τ j,k, τ j+1,k+1

Energies 2018, 11, 965 11 of 20 As shown in Figure 7a, only train x i produces regenerative braking energy and there is no reverse running train in (t i,k, t i+1,k ). Therefore, the overlapping time of the upward and downward trains is 0 and the total energy consumption it the interval (s k+1, s k ) in (t i,k, t i+1,k ) is 0. As shown in Figure 7b e, only one train is running on the upward and downward tracks, respectively, in (t i,k, t i+1,k ); this situation is analogous to the model in Section 2.7.1. Combining Equations (20) (24), the total energy consumption of the interval (s k+1, s k ) in (t i,k, t i+1,k ) is W i,j,k = t (2) i,j,k t (1) i,j,k (P j,k P (1) i,j,k )dt (25) Figure 7. The train diagram of train x i, x i+1, y j and y j+1 in (t i,k, t i,k+1 ). Figure 7f n shows the case where two trains are running in the reverse direction during the time (t i,k, t i+1,k ). Combining Equations (20) and (24), the total energy consumption of train y j and y j+1 of the interval (s k+1,s k ) in (t i,k, t i+1,k ) is W j,k = t (2) i,j,k t (1) i,j,k (2) t P i,j+1,k j,kdt + P j+1,kdt (26) t (1) i,j+1,k

Energies 2018, 11, 965 12 of 20 In the following analysis, considering the case where the feedback electrical energy of the train x i is used by y j and y j+1, the expression of the total energy consumption of the interval (s k+1, s k ) in (t i,k, t i+1,k ) is given by combining Equations (1), (20) (22), (24) and (26). We denote P (2) { } i,j,k = min P j,k + P j+1,k, P i,k (27) (1) Figure 7f,g shows trains y j and y j+1 running simultaneously in (t i,k, τ j,k ), and only train y j+1 consumes electricity in (τ j,k, t (2) i,j,k ). The total energy consumption in the interval (s k+1, s k ) in (t i,k, t i+1,k ) is τj,k (2) W i,j,k = W j,k P (2) t i,j,k dt i,j,k i,j+1,kdt (28) t i,k τ j,k P (1) (2) Figure 7h,i,l,m shows that only train y j consumes electricity in (t (1) i,j,k, t(4) i,j,k ), train y j and y j+1 simultaneously run in (t (4) i,j,k, t(3) i,j,k ), and only train y j+1 consumes electricity in (t (3) i,j,k, t(2) i,j,k ). Therefore, the total energy consumption in the interval (s k+1, s k ) in (t i,k, t i+1,k ) is (4) t i,j,k W i,j,k = W j,k P (1) t (1) i,j,k (2) t i,j,k dt i,j,k t (3) i,j,k (3) P (1) t i,j+1,k dt ε(τ i,j,k j,k τ j+1,k+1 ) t (4) i,j,k P (2) i,j,kdt (29) (3) Figure 7j shows trains y j and y j+1 running simultaneously in (t i,k, t i+1,k ); the total energy consumption in the interval (s k+1, s k ) in (t i,k, t i+1,k ) is ti+1,k W i,j,k = W j,k P (2) i,j,kdt (30) t i,k (4) Figure 7k,n shows that only train y j consumes electricity in (t (1) i,j,k, τ j+1,k+1), and trains y j and y j+1 simultaneously run in (τ j+1,k+1, t i+1,k ). Therefore, the total energy consumption in the interval (s k+1, s k ) in (t i,k, t i+1,k ) is τj+1,k+1 W i,j,k = W j,k P (1) t (1) i,j,k dt ti+1,k P (2) i,j,kdt (31) i,j,k τ j+1,k+1 Other cases can be analyzed analogously to Case 1, subject to length restrictions, which are not discussed in detail here. 3. Model Verification and Application The accuracy of the models and the value of the engineering application were verified based on information consisting of the train marshalling, power supply interval, and the line profile provided by Shenshuo Railway, as well as measured velocity and position of the train. Combining Equations (9), (12), (14) and (17), the train energy consumption and regenerative braking energy were calculated and compared with the measured results, as shown in Figure 8. The measured data were obtained through the Shenshuo Railway Security Control Information System (hereafter referred to as the Information System). The system can remotely capture the train operating status information and real-time energy consumption, as recorded by vehicle measurement instruments.

Energies 2018, 11, 965 13 of 20 Figure 8. The flowchart to calculate train energy consumption and regenerative braking. The actual line longitudinal section (part) of Shenshuo Railway is shown in Figure 9, and the added ramp thousandth of some sections in Figure 9 are obtained by Equations (6), as shown in Table 2. Figure 9. Shenshuo Railway line longitudinal section (part). Table 2. Shenshuo Railway line information (part). Category Power Supply Interval Length (m) Up direction Down direction The Added Ramp Thousandth ( ) Xinchengchuan substation to Gushanchuan section post 14,535 9.38 Gushanchuan section post to Fugu substation 14,505 7.12 Baode section post to Qiaotou substation 8059 11.72 Qiaotou substation to Wangjiazhai section post 13,959 8.96 Wangjiazhai section post to Yinta substation 12,269 6.87 Yinta substation to Wangjiazhai section post 12,800 6.59 Wangjiazhai section post to Qiaotou substation 14,880 8.13 Qiaotou substation to Baode section post 8471 10.46 Fugu substation to Gushanchuan section post 15,879 8.29 Gushanchuan section post to Xinchengchuan substation 14,258 10.29 3.1. Energy Consumption and Regenerative Braking Energy Model Verification According to the hold-out method, additional coefficients in some sections are calculated for two types of trains, as shown in Table 3.

Energies 2018, 11, 965 14 of 20 Table 3. Additional coefficients in some sections. Train Type Power Supply Interval η 1,k η 2,k HXD1 SS 4B Xinchengchuan substation to Gushanchuan section post 0.77 0.45 Gushanchuan section post to Fugu substation 0.76 0.53 Baode section post to Qiaotou substation 0.92 0.79 Qiaotou substation to Wangjiazhai section post 0.91 0.59 Wangjiazhai section post to Yinta substation 0.89 0.52 Yinta substation to Wangjiazhai section post 0.80 Wangjiazhai section post to Qiaotou substation 0.78 Qiaotou substation to Baode section post 0.92 Fugu substation to Gushanchuan section post 0.93 Gushanchuan section post to Xinchengchuan substation 0.91 Since the SS 4B DC traction locomotive does not produce regenerative braking energy when going downhill, there is no corresponding additional coefficient η 2,k. After confirming the additional coefficient, consider the 18,538th train in the upward direction as an example to introduce the calculation method of train energy consumption and regenerative braking energy. Basic data information: Train marshaling: Three HXD1 traction locomotives are followed by 108 C80 trucks. The load is 10,800 t and the total mass is 11,400 t. (1) Xinchengchuan substation to Gushanchuan section post The length of the interval is 14,535 m, the added ramp thousandth is 9.38, and η 2,k is 0.45. The train average speed of 47.3 km/h is assigned to v j. The instantaneous speed of the train entering this interval is 46 km/h, and the instantaneous speed of departure is 44 km/h (the speed information is collected from the Information System, as below). Based on the above data and Equation (14), it is calculated that the electrical energy fed back by the train in this interval is 1706 kw h. The Information System collects the feedback power of three traction trains in order of 584 kw h, 587 kw h, and 600 kw h, for a total of 1771 kw h, as shown in Table 4. (2) Fugu substation to Gushanchuan section post The length of the interval is 8509 m, the added ramp thousandth is 11.72, and η 1,k is 0.92. The train average speed of 53.3 km/h is assigned to v j. The instantaneous speed of the train entering this interval is 64 km/h, and the instantaneous speed of departure is 61 km/h. Based on the above data and Equation (12), it is calculated that the active energy of the train in this interval is 1706 kw h. The Information System collects the feedback power of three traction trains in order of 1235 kw h, 1247 kw h, and 926 kw h, for a total of 3408 kw h, as shown in Table 4. At the same time, the above model was also used to calculate the energy consumption and regenerative braking energy of over 85% of Shenshuo Railway from 20 November to 5 December 2017; compared with the measured data of the Information System, the percentage error is generally less than 10%. Owing to limited space, Tables 4 7 list only the verification results of 20 HXD1 AC trains and 12 SS 4B DC trains. Among them, the calculated value is the energy consumption or regenerative braking energy calculated from the train data using Equations (9), (12), (14) and (17). The actual value is the active or feedback power recorded by the Information System. The percent error is used to describe the error between the calculated value and the actual value; active energy is positive, and the feedback power is negative. The upward direction is for the large heavy-haul trains, and the downward direction is for the large empty trains.

Energies 2018, 11, 965 15 of 20 Table 4. Verification results of interval energy consumption and regenerative braking energy for upstream AC trains. Train Number Xinchengchuan Substation to Gushanchuan Section Post Calculated Actual Percent Error Gushanchuan Section Post to Fugu Substation Calculated Actual Percent Error Baode Section Post to Qiaotou Substation Calculated Actual Percent Error Qiaotou Substation to Wangjiazhai Section post Calculated Actual Percent Error Wangjiazhai Section Post to Yinta Substation Calculated 18538 1706 1771 3.65% 1420 1506 5.68% 3612 3408 5.97% 4460 4696 5.02% 3705 3778 1.94% 18126 1691 1525 10.87% 1464 1346 8.75% 3595 3734 3.73% 4901 4826 1.56% 3374 3507 3.80% 18125 1692 1709 1.01% 1446 1317 9.78% 3681 3532 4.22% 4476 4666 4.07% 3701 3681 0.54% 18268 1712 1718 0.33% 1463 1619 9.61% 3685 3568 3.27% 4828 4661 3.59% 3337 3469 3.79% 18072 1712 1669 2.60% 1408 1534 8.23% 3664 3663 0.03% 4821 4768 1.12% 3355 3417 1.82% 18106 1713 1622 5.62% 1435 1455 1.35% 3525 3534 0.26% 4886 4886 0.01% 3388 3346 1.27% 18470 1791 1791 0.01% 1387 1478 6.17% 3504 3639 3.70% 4611 4538 1.61% 3605 3549 1.59% 18070 1724 1832 5.90% 1435 1432 0.18% 3707 3662 1.24% 4715 4840 2.58% 3203 3349 4.36% 18660 1730 1662 4.08% 1403 1447 3.01% 3611 3678 1.82% 4786 4438 7.83% 3492 3433 1.72% 18436 1660 1625 2.16% 1456 1501 2.97% 3613 3800 4.92% 4847 4636 4.55% 3261 3111 4.82% The traction locomotive s mass of each train is 600 t, and the total masses of truck and cargo is 10,800 t. Table 5. Verification results of interval energy consumption and regenerative braking energy for downstream AC trains. Actual Percent Error Train Number Yinta Substation to Wangjiazhai Section Post Calculated Actual Percent Error Wangjiazhai Section Post to Qiaotou Substation Calculated Actual Percent Error Qiaotou Substation to Baode Section Post Calculated Actual Percent Error Fugu Substation to Gushanchuan Section Post Calculated Actual Percent Error Gushanchuan Section Post to Xinchengchuan Substation Calculated 18013 258 279 7.45% 461 457 0.88% 463 478 3.19% 1450 1473 1.54% 1538 1574 2.27% 18001 252 244 3.43% 442 410 7.85% 450 458 1.77% 1420 1457 2.52% 1546 1456 6.18% 18767 257 249 3.06% 452 468 3.45% 468 498 6.07% 1483 1493 0.70% 1521 1518 0.21% 17051 315 312 0.97% 549 575 4.50% 552 587 5.99% 1712 1589 7.73% 1882 1834 2.60% 16537 354 381 6.96% 621 602 3.13% 649 617 5.18% 1980 1886 4.96% 2050 1941 5.62% 17043 318 352 9.76% 578 633 8.61% 508 529 4.05% 1718 1739 1.19% 1844 1757 4.92% 16587 358 362 0.97% 611 652 6.22% 611 582 4.99% 2028 1910 6.20% 2099 1954 7.42% 18031 266 261 1.96% 463 491 5.71% 465 433 7.38% 1517 1673 9.31% 1589 1731 8.21% 18109 271 277 2.29% 451 478 5.60% 464 443 4.67% 1454 1431 1.63% 1571 1565 0.41% 18241 262 253 3.59% 465 472 1.54% 484 498 2.84% 1527 1645 7.20% 1588 1654 3.99% The traction locomotive s mass of each train is 600 t, and the total masses of truck and cargo are, respectively, 2160 t, 2040 t, 2160 t, 2668 t, 3036 t, 2622 t, 3036 t, 2160 t, 2120 t, and 2160 t. Actual Percent Error

Energies 2018, 11, 965 16 of 20 Table 6. Verification results of energy consumption of DC trains in the uphill section. Train Number Baode Section Post to Qiaotou Substation Qiaotou Substation to Wangjiazhai Section Post Wangjiazhai Section Post to Yinta Substation Calculated Actual Percent Error Calculated Actual Percent Error Calculated Actual Percent Error 18446 3699 3427 7.95% 4852 4491 8.04% 3361 3133 7.28% 18534 3733 3841 2.80% 4826 4444 8.60% 3430 3255 5.37% 18360 3693 3744 1.36% 4418 4673 5.46% 3334 3385 1.49% 17012 3681 3827 3.81% 4604 4862 5.32% 3301 3477 5.07% 18494 3799 4133 8.08% 4571 4937 7.42% 3433 3575 3.97% 18006 3733 3517 6.13% 4613 4793 3.75% 3632 3952 8.10% The traction locomotive s mass of each train is 736 t, and the total masses of truck and cargo are, respectively, 10,800 t, 10,800 t, 10,184 t, 10,416 t, 10,600 t, and 10,800 t. Train Number Table 7. Verification results of energy consumption of DC trains in the downhill section. Fugu Substation to Gushanchuan Section Post Gushanchuan Section Post to Xinchengchuan Substation Calculated Actual Percent Error Calculated Actual Percent Error 18439 1562 1526 2.37% 1647 1693 2.74% 17139 1647 1623 1.50% 1543 1573 1.93% 18367 1552 1603 3.17% 1611 1591 1.28% 18101 1511 1510 0.04% 1641 1553 5.67% 18757 1631 1585 2.88% 1588 1676 5.24% 18753 1635 1650 0.93% 1633 1686 3.14% The traction locomotive s mass of each train is 736 t, and the total masses of truck and cargo are, respectively, 2160 t, 2160 t, 2160 t, 2080 t, 2160 t, and 2160 t.

Energies 2018, 11, 965 17 of 20 Owing to the unavoidable systematic errors such as the line data and locomotive running information involved in the model and the unpredictable accidental errors caused by the difference of weather and driver s operating modes, the model has higher accuracy and good engineering. 3.2. Energy Analysis of a Single Power Supply Interval From the analysis in Section 3.1, it can be seen that the accuracy of the train energy consumption and regenerative braking energy model has engineering application value. This section describes how to use the above model and the analysis of Section 2.7 to analyze the overall energy consumption of multiple trains operating in a single power supply interval, considering the available regenerative braking energy. Consider the following two intervals as examples. (2) Xinchengchuan substation to Gushanchuan section post Figure 10 shows the train operation diagram in this interval from 12:32:44 to 12:49:44 on 11 December 2017. Train x i and x i+1, 18256 and 18276, respectively, in the upward direction are both towed by the HXD1 locomotive. According to the data collected by the Information System, t 1 = t i,k t i+1,k-1 = 372 s and t 2 = t i+1,k t i,k = 648 s; and combining Equations (14) and (21), P i,k 6806 kw, W i,k = 703.3 kw h, W i+1,k = 2011.1 kw h, for a total of 2714.4 kw h. During the time periods t 1 and t 2, the regenerative braking energy generated by the two trains was all sent back to the grid. Figure 10. Section train operation diagram from 12:32:44 to 12:49:44. (2) Gushanchuan section post to Fugu substation Figure 11 shows the train operation diagram in this interval from 12:48:27 to 13:03:19 on 11 December 2017. Train x i and x i+1 have the same information as Example (1). The downward train y j (18033) is towed by the SS 4B DC locomotive. According to the collected data, t 1 = t i+1,k τ j,k+1 = 77 s, t 2 = t i,k+1 t i+1,k = 306 s, and t 3 = τ j,k t i,k+1 = 509 s; combining Equations (20) and (21), P i,k, P i+1,k, and P i,k are obtained. In t 1, considering the regenerative braking energy generated by train x i was used by y j, using Equation (23) or Equation (25), the total energy consumption of the interval is W 1 = 14.18 kw h. In t 2, the regenerative braking energy generated by train x i and x i+1 was used by y j ; because P i,k + P i+1,k > P j,k, all the traction power consumption of the y j traction was provided by x i and x i+1, and the total energy consumption of the interval is W 2 = 0. In t 3, the regenerative braking energy generated by train x i+1 was used by y j ; using Equation (23) or Equation (25), the total energy consumption of the interval is W 3 = 103.92 kw h. To summarize, the total energy consumption of the intervals in t 1, t 2, and t 3 is W = W 1 + W 2 + W 3 = 118.10 kw h. Part of the regenerative braking energy generated by trains x i and x i+1 was used by train y j, and the other part was sent back to the grid in t 2. By calculation, the regenerative braking energy that is not utilized throughout the entire process is W = 419.39 kw h.

Energies 2018, 11, 965 18 of 20 Figure 11. Section train operation diagram from 12:48:27 to 13:03:19. In addition, the total energy consumption of other intervals was also analyzed. Owing to space limitations, it is not elaborated here. From the analysis results, the existing train operation diagram has limited ability to utilize regenerative braking energy. Therefore, without affecting the transport capacity and safety, it is of great significance to study the total train energy consumption by adjusting the operation diagram. 4. Conclusions From the above analysis, the following conclusions were obtained: A model of train energy consumption and regenerative braking energy is proposed based on the single-particle point dynamic model of a train and the theory of railway longitudinal section simplification. The model takes train attributes, line status, and running speed as variables, and the expression is simpler and more convenient than that of multi-particle models. Combined with the current train operation diagram and measured data of Shenshuo Railway, the model has been verified. The results show that the error of the model is generally below 10%. Owing to the complexity of the physical system on which the model relies, and that the influencing factors and error factors are numerous and cannot be completely eliminated, the model can be considered as having good engineering application value. Based on the energy consumption and regenerative braking energy model of a single train, the total energy consumption of multiple trains in a single power supply interval is analyzed considering the available regenerative braking energy. Subsequent studies may be based on the research results of this study to establish a forecast of the total energy consumption of all trains in the whole section, and to analyze the scheme of the train operation plan that can meet the lowest total energy consumption by adjusting the train operation diagram. Acknowledgments: This work was supported by Shenhua Group Co., Ltd. science and technology innovation projects (No: CSIE16024877). Author Contributions: Qiwei Lu and Bangbang He conceived and established model; Bangbang He calculated the relevant results; Qiwei Lu and Mingzhe Wu analyzed the data; Zhichun Zhang, Jiantao Luo, and Yankui Zhang contributed materials; and Bangbang He, Runkai He, and Kunyu Wang wrote the paper. Conflicts of Interest: The authors declare no conflicts of interest. References 1. Ouyang, H. Study on Control Scheme of High-Power Four-Quadrant Converter. Ph.D. Thesis, Huazhong University of Science and Technology, Wuhan, China, 2012. 2. Song, K.; Georgios, K.; Li, J.; Wu, M.; Vassilios, G.A. High performance control strategy for single-phase three-level neutral-point-clamped traction four-quadrant converters. IET Power Electron. 2017, 10, 884 893. 3. Gazafrudi, S.; Langerudy, A.T.; Fuchs, E.; Al-Haddad, K. Power quality issues in railway electrification: A comprehensive perspective. IEEE Trans. Ind. Electron. 2015, 62, 3081 3090. [CrossRef]

Energies 2018, 11, 965 19 of 20 4. He, L.; Xiong, J.; Zhang, P.; Zhang, K. High-performance indirect current control scheme for railway traction four-quadrant converters. IEEE Trans. Ind. Electron. 2014, 61, 6645 6654. [CrossRef] 5. Steimel, A. Electric railway traction in Europe. IEEE Ind. Appl. Mag. 1996, 2, 6 17. [CrossRef] 6. Suzuki, T. DC power supply system with inverting substations for traction systems using regenerative brakes. IEE Proc. B Electr. Power Appl. 1982, 129, 18 26. [CrossRef] 7. Popescu, M.; Bitoleanu, A.; Suru, V.; Preda, A. System for converting the DC traction substations into active substations. In Proceedings of the 9th International Symposium on Advanced Topics in Electrical Engineering (ATEE 2015), Bucharest, Romania, 7 9 May 2015. 8. Henning, P.H.; Fuchs, H.D.; Le Roux, A.D.; Mouton, H.T. A 1.5-MW seven-cell series-stacked converter as an active power filter and regeneration converter for a DC traction substation. IEEE Trans. Power Electron. 2008, 23, 2230 2236. [CrossRef] 9. Manno, M.D.; Varilone, P.; Verde, P.; Santis, M.D.; Perna, C.D.; Salemme, M. User friendly smart distributed measurement system for monitoring and assessing the electrical power quality. In Proceedings of the AEIT International Annual Conference (AEIT), Naples, Italy, 14 16 October 2015; pp. 1 5. 10. Tang, L.; Wu, L. Research on the Integrated Braking Energy Recovery Strategy Based on Supercapacitor Energy Storage. In Proceedings of the International Conference on Smart Grid and Electrical Automation (ICSGEA), Changsha, China, 27 28 May 2017; pp. 175 178. 11. Moghbeli, H.; Hajisadeghian, H.; Asadi, M. Design and Simulation of Hybrid Electrical Energy Storage (HEES) for Esfahan Urban Railway to Store Regenerative Braking Energy. In Proceedings of the 7th Power Electronics and Drive Systems Technologies Conference (PEDSTC), Tehran, Iran, 16 18 February 2016; pp. 93 98. 12. Sengor, I.; Kilickiran, H.C.; Akdemir, H.; Kekezoglu, B.; Erdinc, O.; Catalao, J.P.S. Energy management of a smart railway station considering regenerative braking and stochastic behaviour of ESS and PV generation. IEEE Trans. Sustain. Energy 2017, 1 10. [CrossRef] 13. Kang, X.; Sun, J.; Meng, W. Regulations on Railway Traction Calculation (TB/T1407-201X); National Railway Administration of China: Beijing, China, 2014. 14. Xue, Y.; Ma, D.; Wang, L. Calculation Method of Energy Consumption in Train Traction. China Railw. Sci. 2007, 5, 84 86. 15. Li, Z.; Wei, X.; Wang, H.; Li, J. Optimizing Power for Train Operation Based on ACO. In Proceedings of the 2015 International Conference on Electrical and Information Technologies for Rail Transportation (EITRT), Zhuzhou, China, 17 19 October 2015; pp. 453 462. 16. Dong, H.R.; Gao, S.; Ning, B.; Li, L. Extended fuzzy logic controller for high speed train. Neural Comp. Appl. 2013, 22, 321 328. [CrossRef] 17. Zhuan, X.; Xia, X. Speed regulation with measured output feedback in the control of heavy haul trains. Automatica 2008, 44, 242 247. [CrossRef] 18. Zhu, X.; Xu, Z. Dynamic Simulation of urban rail transit train based on single-particle model. J. China Railw. Soc. 2011, 33, 14 19. 19. Gao, Z.; Fang, J.; Zhang, Y.; Sun, D.; Jiang, L.; Yang, X. Control Research of Supercapcitor Energy Storage System for Urban Rail Transit Network. In Proceedings of the IEEE International Conference on Information Science and Technology(ICIST), Shenzhen, China, 26 28 April 2014; pp. 181 185. 20. Saleh, M.; Dutta, O.; Esa, Y.; Mohamed, A. Quantitative analysis of regenerative energy in electric rail traction systems. IEEE Trans. Ind. Appl. 2017, 1 7. [CrossRef] 21. Adinolfi, A.; Lamedica, R.; Modesto, C.; Prudenzi, A. Experimental assessment of energy saving due to trains regenerative braking in an electrified subway line. IEEE Trans. Power Deliv. 1998, 13, 1536 1542. [CrossRef] 22. Capasso, A.; Lamedica, R.; Penna, C. Energy regeneration in transportation systems methodologies for power networks simulation. IFAC Proc. 1983, 16, 119 124. [CrossRef] 23. Dominguez, M.; Fernandez-Cardador, A.; Cucala, A.P.; Pecharroman, R.R. Energy Savings in Metropolitan Railway Substations through Regenerative Energy Recovery and Optimal Design of ATO Speed Profiles. IEEE Trans. Autom. Sci. Eng. 2012, 9, 496 504. [CrossRef] 24. Liu, W.; Li, Q.; Tang, B. Energy saving train control for urban railway train with multi-population genetic algorithm. In Proceedings of the IFITA 09. International Forum on Information Technology and Applications, Chengdu, China, 15 17 May 2009; pp. 58 63. 25. Zhou, Z. Machine Learning; Tsinghua University Press: Beijing, China, 2016; pp. 24 29.

Energies 2018, 11, 965 20 of 20 26. Das Gupta, S.; Pavel, L.; Tobin, K.J. An optimization model to utilize regenerative braking energy in a railway network. In Proceedings of the American Control Conference (ACC), Chicago, IL, USA, 1 3 July 2015; pp. 5919 5924. 27. Yang, X.; Ning, B.; Li, X.; Tang, T. A two-objective timetable optimization model in subway systems. IEEE Trans. Intell. Transp. Syst. 2014, 15, 1913 1921. [CrossRef] 28. Liu, J.; Nan, Z. Research on Energy-Saving Operation strategy for multiple trains on the urban subway line. Energies 2017, 10, 2156. [CrossRef] 2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).