1智慧電網1

Similar documents
03 11 ABB ABB ABB ABB ABB ABB 50% 80% ABB ABB 1 ABB Connects 3 11

03 14 ABB ABB ABB ABB ABB ABB ABB

改良型類神經-模糊網路分類器及快速圖形式模糊分類器設計及應用研究

03 07 IEC ABB ABB ABBIEC xA ABB 1 ABB Connects 1 11

FEJC **.pdf

2014_

<798E9197BF82507C82507A D5B F838A E2E5B F838A CB48E7197CD88CF88F589EF2E706466>

Cube20S small, speedy, safe Eextremely modular Up to 64 modules per bus node Quick reaction time: up to 20 µs Cube20S A new Member of the Cube Family

262 管 理 與 系 統 countries including Taiwan. Because of the liberalization policy of Taiwan s power industry, there is a critical demand to explore the m

风电并网技术

G30

untitled

GH1220 Hall Switch

03_NCT_XC90_T8_Twin_Engine.pdf

(Electronic Data Interchange) (Executive Information System) (Economic Order Quantity) (Enterprise Resource Planning) (Flexible Manufacture System) (F

Multi-national Company Operation and Public...

iml88-0v C / 8W T Tube EVM - pplication Notes. IC Description The iml88 is a Three Terminal Current Controller (TTCC) for regulating the current flowi

Microsoft Word - 103年股東會年報

ERP-1


Microsoft Word - 2目录.doc

untitled

<4D F736F F D20C9CFBAA3BFC6BCBCB4F3D1A7D0C5CFA2D1A7D4BA C4EAC7EFBCBEC8EBD1A7B2A9CABFD7CAB8F1BFBCCAD4CAB5CAA9CFB8D4F22D C8B7B6A8B8E5>

Microsoft PowerPoint ARIS_Platform_en.ppt

3-D 王明新1.doc


4 115,,. : p { ( x ( t), y ( t) ) x R m, y R n, t = 1,2,, p} (1),, x ( t), y ( t),,: F : R m R n.,m, n, u.,, Sigmoid. :,f Sigmoid,f ( x) = ^y k ( t) =

Microsoft PowerPoint - Aqua-Sim.pptx

iml v C / 4W Down-Light EVM - pplication Notes. IC Description The iml8683 is a Three Terminal Current Controller (TTCC) for regulating the cur


iml v C / 0W EVM - pplication Notes. IC Description The iml8683 is a Three Terminal Current Controller (TTCC) for regulating the current flowin

A 1, ,400 1

幻灯片 1

MACRO ECONOMY AND MICRO OPERATION 2016 ( 30%~50% ; 1 ) ; : ? 80 : 1993 ; ; ( ) ; 1. ;2014 ( 1 ) ( ) 105

Microsoft PowerPoint - Sens-Tech WCNDT [兼容模式]

Microsoft Word - 出國報告_BEMAC_.doc.docx

~ ~


Microsoft Word - LD5515_5V1.5A-DB-01 Demo Board Manual

Vol. 22 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug GPS,,, : km, 2. 51, , ; ; ; ; DOI: 10.

1377_SNAP_Selection_Guide.fm

表 2 电 缆 导 体 主 要 技 参 数 表 警, 切 断 高 压 输 出 ; 8) 短 路 保 护 : 当 传 输 线 路 中, 某 处 电 缆 的 正 极 与 负 极 短 接 时, 为 了 保 证 设 备 和 线 路 的 安 全, 系 统 告 警, 切 断 高 压 输 出 ; 9) 漏 电 保


<4D F736F F D20312D3120D5D0B9C9CBB5C3F7CAE9A3A8C9EAB1A8B8E5A3A9>

History Universal Universal 1958Universal 1984Magnetek Magnetek Lighting Group Universal Technologies Lighting Energy Savin

第四章-個案分析.doc

Abstract Today, the structures of domestic bus industry have been changed greatly. Many manufacturers enter into the field because of its lower thresh

EE Lecture 11 (Wireless Communications Systems)

Microsoft PowerPoint - ~ ppt

Current Sensing Chip Resistor

Microsoft PowerPoint - WatanabeTokyoGas.ppt

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi

Microsoft Word - P SDV series.DOC

IP TCP/IP PC OS µclinux MPEG4 Blackfin DSP MPEG4 IP UDP Winsock I/O DirectShow Filter DirectShow MPEG4 µclinux TCP/IP IP COM, DirectShow I

Microsoft Word - Pinggao Electric CH - Yuanta CVN TC-YCMC

<4D F736F F D20A3A8D3A1CBA2A3A C4EAB1BEBFC6D7A8D2B5BDE9C9DC5FD6D0CEC45FA3A A3A9>

國立中山大學學位論文典藏.PDF

Microsoft PowerPoint - Performance Analysis of Video Streaming over LTE using.pptx

u d = R s i d - ωl q i q u q = R s i q + ωl d i d + ωψ 1 u d u q d-q i d i q d q L d L q d q ψ f R s ω i 1 i 5th i th 5 θ 1 θ θ 3 5 5

1.2 资 金 的 管 理 1.1 权 利 义 务 来 源 MOU 1.3 数 据 的 使 用 和 保 护 2 国 际 空 间 站 资 源 分 配 方 案 54

一 本 学 科 概 况 ( 学 科 一 般 情 况 ) 1.1 学 科 概 况 ( 管 理 科 学 与 工 程 ) 管 理 科 学 与 工 程 是 管 理 学 门 类 中 的 一 级 学 科, 其 下 不 设 二 级 学 科 管 理 科 学 与 工 程 学 科 是 以 人 类 社 会 组 织 管 理


MODEL 62000H SERIES 5KW / 10KW / 15KW 0 ~ 375A 0 ~ 1000V/2000V( ) : 200/220Vac, 380/400Vac, 440/480Vac 3U/15KW / & 150KW / ( 10 ms ~ 99 hours)

Microsoft PowerPoint - 数据通信-ch1.ppt

No

RW Salary Survey China Proof SECOND FILE_nw rz_all36_v3_0120

國家圖書館典藏電子全文

10 IBM Louis V. Gerstner, Jr. 15 Moore's Law EPC PC 2-2

2 response personnel to speed up the rescue operations after various natural or man-made disasters. Keywords: SMS, Database, Disaster

10-D 王英涛完稿.doc

JAEA-Technology indb


<4D F736F F D20312D3120B9ABBFAAD7AAC8C3CBB5C3F7CAE9A3A8C9EAB1A8B8E5A3A92E646F63>

Product Type Batteries (only) Circuit Breatkers & Load Protection Connection Devices Contactors Ethernet Switches, Stratix Switches I/O Modules; PLC N

ABOUT SUNAC SUNAC China Holdings Limited (the Company and together with its subsidiaries, collectively referred to as the Group ), is specialised in t

AL-M200 Series

第六篇

Taipei Business Association in Singapore Content_PG13.indd

E15-3D1 1. Specifications Compact 4-Way Cassette type Model name MMU- AP0071MH2UL AP0091MH2UL AP0121MH2UL AP0151MH2UL AP0181MH2UL Cooling Capacity kbt

LTTH-product-bro

/ 4 4 / 5 /

Gerotor Motors Series Dimensions A,B C T L L G1/2 M G1/ A 4 C H4 E

Transcription:

3 ABB Taiwan customer magazine 10 ABB(CEPSI 2010) ABB

03 ABB 05 01

09 11 13 15 17 19 21 23 27 29 31 34 36 38 ABB 02

ABB makes the grid smarter ABB(CEPSI 2010) We know the country that harnesses the power of clean, renewable energy will lead the 21st century. 1975 CEPSI 10 25~28 ABB FACTS 50% IEC61850 Relion ABB ABBmakes the grid smarter ABB ABB ABB ABB ABB Wind converte Solar inverter www.abb.com.tw 03

大 04

05

10 24-28 The Association of the Electricity Supply Industry of the East Asia and the Western Pacific, AESIEAP 1975 19117 78full members 39associate members CEO Conference 2 150 The Conference of Electric Power Supply Industry, CEPSI2 Exhibition 06

07

CEPSI 1000 1,000 Southern Califorina Edison CEO - Mr. John R. Fielder Green Energy, Smart Grid Transmission Advanced Metering Infrastructure 52 269 CEPSI 44 10 25 11 10 286 1988 2005 2009-20102008 10 2009-2010 08

BRICE KOCH, BAZMI HUSAIN - 09

10 40% 80% 20 1 GW 800 20 2008 1,190 ABB 1.7 20% 6 20201350 2007 1,320 ABB Review 2010

11

創新技術 Smart grid covers the entire generation, delivery and utilization cycle Smart grid technology categories Decision intelligence Communication Sensor/Actuator Power conversion/transport/ storage/consumption 智 慧電網在不同的地區有不同的定 智慧電網技術組成 義 例如在美國 智慧電網 智慧電網由四大技術層層架疊而成 底層 通常具有以下特點 為能源的轉換 運輸 儲存和使用 可類 比為人體的肌肉 感測器(sensor)和致動器 電力擾動事件之後 電網具自我修復功能 (actuator)層類比為感知環境和控制肌肉的 消費者能積極參與電網的用電供需回應 感覺和運動神經 通信層類比為傳輸感知 機制 當遭逢實體與網路攻擊時 電網可靈活 和控制信號的神經系統 決策智慧層則相當 於人腦 調整運作模式 提供滿足21世紀需求的優質電力 智慧電網解決方案 可廣納各種發電和儲電方案 智慧電網將採用現有技術和新技術進行構 可兼容新產品 新服務和新市場需求 建 處於智慧電網技術開發前緣的ABB 可優化資產使用率和運行效率 可提供以下重點解決方案 在歐盟 智慧電網 則具備下列特點 廣域監測系統 (Wide area monitoring system, WAMS) 彈性(flexible) 滿足客戶需要 並能 應對未來的變化和挑戰 可及性(accessible) 能與所有電網用戶 ABB廣域監測系統可即時匯集電網資訊 結合相量資料並由GPS衛星提供精準時間 標記 以隨時掌控任何異常現象 相連 特別是可再生電力與當地發電資源 可靠性(reliable) 電網是安全 有保障 的 可靈活應對風險與不確定因素 經濟性(economical) 以技術創新與能源管 理在公平競爭環境裡提供最佳產品服務 資料擷取和控制系統 Supervisory control and data acquisition system, SCADA 互連接 而部分電網出現不穩定狀態時 也可局部區隔 使得影響範圍降至最小 此外 HVDC亦是海底輸電和遠距離輸電 的理想選擇 故障檢測和系統恢復 變電站自動化系統是ABB智慧電網產品系列 中的關鍵部分 除可執行資料擷取 遠端 通訊與監控 故障評估等 ABB變電站自動 化系統滿足IEC 61850通訊標準的要求 可 確保不同品牌 同類產品間的互通性 可再生能源併網 ABB為水電 風電和太陽能發電提供電廠控 制設備 同時為再生能源提供客製化遠距併 網產品與服務 此外 ABB為離岸風電場提 供完整電氣系統 如輕型高壓直流 HVDC Light 海底電纜和海上變電站等 構建21世紀電網 智慧電網不是靈丹妙藥 而是整合現有技術 和新技術的產物 適切地落實該技術 將有 助於提升能源效率 提高電網可靠度與品 質 實現可再生能源併網與消費者參與 SCADA系統在國家和區域電網中專責監控 與管理數萬個終端檢測點 SCADA可建立 在中國 智慧電網 是一種輸配電系統 網路模型 類比電網運行 檢測故障 研 融合傳統和先進的電力工程與網路監控技 擬停電問題解決備案及參與能源交易等 術 從而提供更佳電網效能與各種附加服 務 彈性交流輸電系統 Flexible AC transmission system, FACTS 智慧電網技術發展源起 FACTS設備可補償線路電感 實現最大電 電力消費 電網可靠性和電力品質 與一 力傳輸 某些情況下 甚至可增加一倍傳 個國家的經濟發展密切相關 因應與日遽 輸容量 FACTS也可透過動態併聯補償減 增的電力需求 無預警的恐怖攻擊 網路 少擾動 保持電網穩定 駭客威脅 碳減排與再生能源併網需求 促使現有電網進行改造與進化 2009年底 高壓直流輸電系統 HVDC 美國政府撥款40多億美元資助智慧電網技 HVDC系統將電廠的交流電轉為高壓直流 術及相關標準的研究開發和部署 同年 電進行傳輸 再轉換為交流市電供用戶使 歐盟和中國也發佈了相關政策措施 用 因而不同頻率(50或60 Hz)的電網可相 摘自ABB Review 2010第一期智慧電網 12

PCS 6000 STATCOM ABB PCS 6000 STATCOM Power Converter System 6000 Static Synchronous Compensator 13

006 18% 2030 23% (grid code) ABB STATCOM Typical control mode of the STATCOM Reactive power Max. capacitive Measured voltage STATCOM operation point U 0 Grid voltage 33 kv bus voltage in the wind park N Max. inductive PCS 6000 STATCOM Grid voltage (kv) 40 20 0-20 -40 10 15 20 25 30 35 40 45 50 Time (ms) 4a without the STATCOM ABB STATCOM PCS 6000 STATCOM (voltage source converter) STATCOM Grid voltage (kv) 40 20 0-20 PCS 6000 STATCOM AC 800PEC power electronics controller -40 10 15 20 25 30 35 40 45 50 Time (ms) 4b with the STATCOM STATCOMU-Q U0N STATCOM STATCOM STATCOM NSTATCOM ABB STATCOM ABB STACOM ABB Review 2010 14

HDVC HVDC Light 15

Drivers and HVDC applications Drivers Energy efficient bulk power long distance distance transmission Applications UHVDC, HVDC S ubsea transmission HVDC, HVDC Light Connectiong renewable energy Grid reliability Difficult to build new transmission Connecting networks Trading Remote hydro: HVDC, UHVDC Offshore wind: HVDC Light DC grid (HVDC Light) HVDC Light HVDC Light underground transmission Converting AC OHL to DC OHL: HVDC, HVDC Light Asynchronous connections HVDC, HVDC Light Back-to-Back HVDC (Flexible) (Accessibility) (Reliability) (Economy) HVDC - HVDC Classic HVDC Light HVDC Classic 800kV 6400 MW 2000 93% 40% HVDC Light Bard Offshore 1 200 HVDC Light ±150 kv 400 MW HVDC Light HVDC Light (VSC) IGBT (converter)hvdc Light ABB HVDC Light HVDC Light HVDC Light HVDC HVDC Light house-load ABB Review 2010 16

創新技術 提升電網穩定性的 儲能系統 下一代彈性交流輸電系統 隨著風能與太陽能發電的重要性日益凸顯 如何將間歇且多變的發電源併入電網 已成智慧電網無法迴避的挑戰 ABB彈性交流輸電系統 FACTS 的最新產品即 是因應此挑戰的解決方案 該方案整合了SVC Light 和最新的電池儲能技術 透 過平衡電網 有助於再生能源的大規模饋入 17

An artist s view of an SVC Light with Energy Storage installation. A typical rating of ±30 MVAr, 20 MW over 15 minutes will have a footprint of around 50x60 m. ABB SVC Light 2010 ABB Basic scheme of SVC Light with Energy Storage PCC SVC Light ~ # 1 # 2 # 3 # n Battery storage SVC Light Q P VSC VSC SVC Light VSC VSC (converter) (high-energy density) ABB Review 2010 18

SCADA/DMS IT 19

Network Manager is an integrated platform for SCADA, DMS and OMS. Network Manager Geographical user interface DMS applications Balanced and unbalanced load flow State estimation Fault location Switch order management Overload reduction switching Restoration switching analysis Volt/var control Remote/automatic switching and restoration Trouble call management Outage management Operations management Crew management Operator logs Referral management Outage notifications Outage reporting Distribution database and network model DMS adaptors GIS CIS AMI/MDM Substation/feeder gateways Mobile workforce management Interactive voice response Work management system Infrastructure Graphical data engineering External adaptors data exchange SCADA Process communication front end Historian and data warehouse External applications and systems The operation center system of the future integrates various IT systems as well as field devices and customer information. ABB Network Manager Operations center SCADA and DMS Outage management Advanced applications AMI/MDM MWM GIS CIS SCADA/EMS integration WMS IVR Communication Unbalanced load flow Field crews Fault location automatic switching and restoration Plug-in hybrid electric vehicles IT (Intelligent Electronic Devices, IEDs) DMS (distribution management system) SCADA AMI (advanced metering infrastructure) DMS IEDs Substation computer/gateway Voltage regulator Feeder protection Volt/var control Line recloser Capacitor control Switch Backfed tie switch Distributed generation and energy storage Residential meter Substation Feeder Customer AMI ABB AMI MDM SCADA/DMS ABB Network Manager SCADA DPF (distribution power flow) / (voltage/ var optimization, VVO) (fault location, FL)(restoration switching analysis, RSA) AMI integration and demand response (demand response) IEDs AMI ABB Review 2010 20

21

(Advanced Metering Infrastructure, AMI) Point of Interaction, POI DMS SCADA AMI AMI DMS/AMI DMS AMI DMS Outage Analysis, OA AMI AMI (Outage Management System, OMS) OMS AMI AMI DMS DMS Distribution State Estimation, D-SE D-SE D-SE D-SE D-SE D-SE DMS (peak shaving) DR DR DR DR DR AMI Home Area Network, HAN AMI ABB Review 2010 22

23

Projects financed by the European Commission focus on integrating distributed generation and improving energy efficiency. A low-voltage Gaidouromantra microgrid deployed in Kythnos Island, Greece. PV generator Energy Markets ~ = AC grid 3~400V AC grid 3~400V ~ = ~ = ~ = ~ = More-MICROGRIDS PV generator ~ ~= ~ ~ = = = ~ Battery PV Diesel System house PV generator ABB ABB ABB ABB ABB ABB ABB (Mircogrids) More Microgrids 22 ABB ZIV SMA Liander MVV EdP 12 FP6 470 640 ABB ABB More Microgrids More Microgrids ABB EDF 8 (AuRA-NMS) (EPSRC) 5462913 AuRA-NMS AuRA-NMS 24

The grid of the future? Collaborations are working to transform the old traditional system into an intelligent, more effective and environmentally sensitive network. Generating companies High-voltage transmission level, 110-380 kv, meshed grid TSO Medium-voltage distribution level, 6-35 kv, radial grid DNO Low-voltage distribution level, 380 V, radial grid DNO Low-voltage distribution level, 380 V, radial grid Consumer AuRA-NMS ABB COM 615SVC Light AuRA-NMS 2006 2010 EDF energy box Active distribution networks with full integration of demand and distributed energy resources ADDRESS ADDRESS ADDRESS (Aggregator) ADDRESS 2008 64 EDF Iberdrola () ENEL () ABB KEMA ( ) 5 Cassino 18 (FP7/ 2007-2013) 900 1350 ABB ABB ABB ABB ABBMEREGIO MEREGIO MERIGIO ABB IBM SAP EnBW ( ) Karlsruhe E-Energy: ICT-based Energy System of the Future 6 3 ICT 25

1000 800150 50 ABB ABB ABB Review 2010 26

27

Schematic of an ABB vacuum interrupter (type VG4) General design of an embedded pole a a b c b d e f g c d e h f i g j h a b c d e Stem / Terminal Twist protection Metal bellows Interrupter lid Shield f g h i j Ceramic insulator Shield Contacts Stem / Terminal Interrupter lid a b c d e Upper terminal Vacuum interrupter Stem Lower terminal Flexible connection f g h Insulated push-rod with contact force springs Fixing point Connection to drive ABB Vacuum Interrupters, VIs 350,000 ABB 40.5 kv63ka ABB ABB 200,000 ABB PT1 P1 35% 12%50% 100% 300 400% PT1 PT1 IEC 62271-100 PT1 PT1 ABB PT1 VD4 VM1 OEM PT1 ABB Review 2010 28

SVC 29

Simplified grid of SEC Western region Umm Lajj G Yanbu al Bahr Al Madinah (Medina) SVC SAUDI ARABIA Rābigh Red Sea G SVC SVC G Jiddah (Jeddah) Makkah (Mecca) Al Khurmah SUDAN G Al Lith SVC (stability margin) SVC SVC SVC SVC SVC Vref Saudi Electricity Company 380 kv OH 380 kv/110 kv 110 kv/13.8 kv 80% SLG SVC Faisaliyah Jamia SVC 2008 (Faisaliyah) SVC 1.5 SVC 100 MVAr 500 MVAr 4 5 200 MVAr 30 30 SVC SVC SVC SVC ABB Review 2010 30

50 ABB TrafoAsset Management TM 31

Development of the transformer failure rate in three different applications Overview of ABB TrafoAsset Management Proactive Services 50 45 40 35 Industrial transformer Generator transformer Network transformer Analysis Design analysis Historical review of installed base Transformer monitoring Condition assessment Failure rate (%) 30 25 20 15 10 5 Risk assessment Variables: importance of transformer and risk of failure Asset management scenarios Planning of economic-based maintenance actions 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Years Source: CIGRE WG 12-05. (1983). An international survey on failures in large power transformers. ELECTRA, 88, 21-48. Regular asset services Early-life inspection Midlife refurbishment End of life or remanufacturing Transformer investment then and now Number of transformers 250 200 150 100 50 0 Investment ABB 1920-1929 1930-1939 1940-1949 1950-1959 1960-1969 1970-1979 Year of manufacture 1980-1989 1990-1999 1980-1989 1990-1999 2000-2009 2010-2019 2020-2029 2030-2039 2040-2049 2050-2059 Year of replacement Current expected investment INPO 2002 199670 30 40 Expected investment with TrafoAsset Management TM ABB TrafoAsset Management ABB TrafoAsset Management ABB 30 75% ( ASEA BBC) ABB ABB 20 10 600 MVA 700 32

Structure of a transformer monitoring system HYDRAN M2 or equivalent Bottom oil temp. Top oil temp. CT Control cabinet Ambient temperature (sun/shade) Customer TCP/IP network TAPGUARD 260 or equivalent Managed Ethernet switches (MOXA) or equivalent IDD or equivalent TEC Auxiliary contacts for alarm signals to SCADA system Transformer Control room/remote Remote supervision access by ABB Service Center TEC advanced PC Working station #1 Working station #n Link to SCADA* using IEC 60870-5-101 / IEC 60870-5-104 / IEC 61850 / DNP 3.0 Copper cables / CANBUS Communication over TCP/IP Fiber optic link * Supervisory Control and Data Acquisition (SCADA) Source: Uhlmann O. (2009). ABB Transformer Service Engineering Solutions Portfolio Overview. ABB Review 2010 33

ABB 34

35 ABB ACS ABB ACS OPC ABB DriveMonitorTM KPI ABB ABB Review 2010

36

Smart metering Socket Socket Busch-ComfortPanel Socket Socket Socket Data gateway Gas and water metrics transmitted by cable or wireless EDSM Energy meter Disconnector switch Meter cabinet Gas/water utilities Electric ultility ABB EDSM Busch-ComfortPanel. ABB Review 2010Smart Grid 37

SF HV GIS for Industrial Customer (02) 8751 6090 356 AIS DTB AIS \ DTB (07) 335 5931 879 Capacitor (07) 335 5931 883 Transformer & Accessories (02) 2299 3299 188 Distribution Protection Relays & Control Products \ HBT (07) 335 5931 861 SF6 MV Switchgear (GIS \ AIS) (02) 8751 6090 353 SF6 MV VCB \ SF6 GCB (02) 2299 3299 181 MV CT \ PT \ Switches (02) 2299 3299 185 Power Products Service (07) 335 5931 866 Flexible AC Transmission Systems (FACTS) (07) 335 5931 896 Cable & Accessories (02) 8751 6090 358 (DCS) Power Plant Automation System, DCDAS (02) 8751 6090 373 Plant Optimization Information Management (02) 8751 6090 373 BMS - UVISOR (Flame Scanner) (02) 8751 6090 373 Transmission & Distribution Turnkey Substation (04) 2358 5521 218 Transmission Protection Relays (02) 8751 6090 398 Substation Automation Systems (02) 8751 6090 389 Small SCADA (02) 8751 6090 350 SCADA \ DMS \ EMS \ BMS (02) 8751 6090 368 38

LV Drives System HV / LV Motor and Machine ACB \ MCCB \ MCB LV Switchgear \ Switches (02) 8751 6090 LV Drives General (02) 8751 6090 LV Drives Servo (02) 8751 6090 LV Drives OEM (07) 335 5931 MV Drives \ Power Electronics \ Power Quality Product (07) 335 5931 (02) 8751 6090 (07) 335 5931 (02) 8751 6090 345 367 361 827 829 381 812 360 Water Analyzer \ Flowmeter (07) 335 5931 823 DP \ Pressure & Temperature Transmitter (02) 8751 6090 388 Force Measurement (07) 335 5931 818 Metal Solutions - Drive, Motor and DCS (07) 335 5391 808 Pulp and Paper Solutions Drive, Motor, DCS, QCS, WIS (02) 8751 6090 371 Crane EOT (ASTAT) Crane RMG Distributed Control System (DCS) DCS Service (07) 335 5931 (07) 335 5931 Crane System Service (07) 335 5931 (02) 8751 6090 (02) 8751 6090 897 808 830 343 365 Hybrid & PLC (07) 335 5931 817 Analyzer FTIR (02) 8751 6090 Turbochargers (07) 822 0710 General Industry Robot (02) 2299 3299 Foundry Robot (02) 2299 3299 Painting Robot \ Robot Vision System (02) 2299 3299 Solar Cell Robot \ Arc Welding Robot (02) 2299 3299 Food and Health Industry Robot (02) 2299 3299 366 100 187 162 171 172 168 Robot After Sales Service (02) 2299 3299 164 39

ABB 7000 www.abb.com.tw