New Construction Technologies in Tianjin Jinta Mansion 天津津塔工程施工新技术 Abstract Yaohui Yang Gao Junfeng The 73-story and meter Tianjin Jinta Mansion

Size: px
Start display at page:

Download "New Construction Technologies in Tianjin Jinta Mansion 天津津塔工程施工新技术 Abstract Yaohui Yang Gao Junfeng The 73-story and meter Tianjin Jinta Mansion"

Transcription

1 ctbuh.org/papers Title: Authors: Subjects: Keywords: New Construction Technologies in Tianjin Jinta Mansion Yaohui Yang, Professor Level Senior Engineer, China Construction First Group Construction & Development Co., Ltd. Gao Junfeng, Professor Level Senior Engineer, China Construction First Group Construction & Development Co., Ltd. Wang Jing, Engineer, China Construction First Group Construction & Development Co., Ltd. Building Case Study Construction Structural Engineering Concrete Steel Structure Publication Date: 2012 Original Publication: Paper Type: CTBUH th World Congress, Shanghai 1. Book chapter/part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished Council on Tall Buildings and Urban Habitat / Yaohui Yang; Gao Junfeng; Wang Jing

2 New Construction Technologies in Tianjin Jinta Mansion 天津津塔工程施工新技术 Abstract Yaohui Yang Gao Junfeng The 73-story and meter Tianjin Jinta Mansion is the tallest building in the world designed to apply concrete filled steel tube columns and pure steel plate shear walls. This paper introduces two new technologies applied in the construction of Tianjin Jinta Mansion. The lift-up pouring technology is adopted to assure the concrete quality. This paper analyzes the complexities of lift-up pouring technology in concrete mix, lifting interface design, lifting preformed hole design inside steel tube column, and selection and layout of lifting concrete pump and pump pipe. The installation of the steel plate wall, which distributes from basement to meter level is another challenge in this project. Welding stress control, fastening accelerating construction speed, ensuring steel tube manufacturing and manufacturing accuracy are specifically considered in the method statement. Keywords: Steel Plate Shear Wall, Concrete Filled Steel Tube Column, Lifting Concrete 摘要 Wang Jing Yaohui Yang, Gao Junfeng & Wang Jing China Construction First Division Group Construction & Development Co., Ltd. 17 Wanghualuxili Avenue Chaoyang District, Beijing China tel ( 电话 ): fax ( 传真 ): ( 电子邮箱 ): yangyaohui@chinaonebuild.com, gaojunfeng@chinaonebuild.com, wangjing0552@ sina.com Yaohui Yang Master, MBA, Professor Level Senior Engineer. He won the honorary title of Beijing Youth Job Expert in 1998; was chosen as National Excellent Project Manager in 2002; won the title of International Excellent Project Manager in At present, he is working as deputy general manger of China Construction First Division Construction & Development Co. He has worked as a project manager of various projects, such as: China International Trade Center Phase II, Beijing LG Towers, China Petroleum Building, China International Trade Center Phase III, Tianjin Jinta Mansion and Shenzhen Ping An Mansion. 杨耀辉 : 硕士 MBA, 一级注册建造师, 教授级高级工程师, 曾荣获 北京市青年岗位能手 全国优秀项目经理 国际杰出项目经理 称号 目前任中建一局集团建设发展有限公司副总经理 曾先后担任中国国际贸易中心第二期工程 北京 LG 大厦 中国石油大厦 中国国际贸易中心第三期工程 天津津塔 深圳平安等多个项目的经理 Gao Junfeng Master, Professor Level Senior Engineer. He is working as Chief Engineer of China Construction First Division Construction & Development Co at present. He has worked as technical leader of various projects, such as : National Aquatics Center, Beijing Lucky Goldstar Tower, China International Trade Center Phase III, and Tianjin Jinta Mansion. 高俊峰 : 硕士 一级注册结构师, 教授教授级高级工程师 目前任中建一局集团建设发展有限公司总工程师 曾先后担任国家游泳中心 北京乐喜金星大厦 国贸三期 天津津塔项目 合肥京东方第 6 代薄膜晶体管液晶显示器件项目等多个项目技术负责人 Wang Jing Master, Engineer. Worked in Tianjin Jinta Mansion and Tianjin Kerry project department. 王晶 : 硕士 中级工程师 先后在天津津塔工程 天津嘉里工程技术部门工作 并参与了天津嘉里 深圳平安等项目的投标工作 天津津塔高 336.9m, 共 73 层, 是目前世界上采用钢管组合柱和纯钢板剪力墙的最高建筑 文章主要介绍工程施工中的两项新技术 钢管组合柱采用顶升混凝土浇筑工艺, 本文从混凝土配合比 顶升口设计 顶升预留孔设计 输送泵选择四个方面分析顶升施工难点并给出解决措施 钢板墙从底板安装到 236.5m, 最大厚度 32mm, 钢板剪力墙安装及焊接变形控制是施工又一难点 本文从焊接应力控制 加快现场施工速度 保证钢管柱加工 加工精度保证四个方面分析钢板剪力墙施工的难点, 并提出了解决方法 关键词 : 超高层纯钢板剪力墙钢管组合柱顶升混凝土焊接应力控制 Overview of the Project Profile Tianjin Jinta Mansion is located on the north side of intersection of Dagu Road and under-planned Xing an Road. The project is a complex of office, apartment, entertainment, business, occupying over 20,000m2 of land, with 340,000 m2 of total floor area. It consists one high-class meter high office building and one 105 meter high hotel service type apartment, and has become a landmark building of Tianjin, the highest building in Tianjin and even in North China (see Figure 1). Design Feature The main tower structure of Tianjin Jinta Mansion is the first supertall building to utilize the following systems: concrete filled steel tube column frames, all-welded pure steel plate concrete shear walls, and an outrigger rigid arm lateral force resisting system (see Figure 2). Concrete filled steel tube column frames are adopted in inner and outer cylinders of Tianjin Jinta Mansion, fifty-five pieces of concrete filled steel tube columns are arranged in plane surface, with the largest diameter of steel tube columns at 1,700mm, and the smallest diameter at 600mm. The thickest steel tube wall at 70mm, C60 high strength concrete is used to fill columns, with 工程概况 概况介绍天津津塔工程位于和平区大沽路 规划兴安路交口北侧 建筑集办公 公寓 餐饮 商业为一体, 占地面积 2 万多 m2, 总建筑面积 34 万 m2 包括一栋 336.9m 的写字楼和一栋 105m 的公寓, 是天津市标志性建筑, 也是目前天津乃至整个中国华北地区的最高建筑, 见图 1 设计特点主塔楼结构采用钢管混凝土柱框架 + 全焊接纯钢板剪力墙体系 + 外伸刚臂抗侧力体系 ( 见图 2), 是目前世界上首次采用该体系的超高层建筑 工程内外框筒采用钢管混凝土柱框架, 平面共布置了 55 根钢管混凝土柱, 直径自下而上为 1700~600mm, 壁厚最厚 70mm, 柱内为 C60 高强混凝土, 最高浇注高度达 312.8m 钢管柱内隔板众多 节点复杂, 是目前国内超高层钢结构最复杂的节点设计之一, 也使津塔工程成为了目前国内乃至世界上钢管柱内混凝土浇筑难度最大的工程之一 核芯筒内部平面共布置 15 块钢板剪力墙, 钢板最厚达 32mm, 最高安装到 236.5m, 是目前世界上钢板剪力墙安装高度最高的建筑, 同时也是采用纯钢板剪力墙结构的最高建筑 832

3 highest pouring height at meter. Many dividing panels are set inside steel tube columns, which complicate connections with steel tube shear wall outrigger trusses. This is one of the most complicated joint designs for domestic super high-rise structures and makes Tianjin Tower one of the most complex concrete pouring projects currently in the country and the world. Fifteen pieces of 32mm steel plate shear walls are set at the internal plane of Tianjin Tower core cylinder. At its highest erection height of 236.5m, Tianjin tower is the tallest building in which steel plate shear wall is erected and pure steel plate shear wall structure is adopted. Concrete-Filled Steel Tube Lifting Technology Because of the complicated joint design inside the steel tube columns, especially the intersecting stiffening plates inside the columns, common pouring methods cannot ensure concrete quality inside the steel tube. Therefore, lifting concrete pouring approach will be adopted. The following is an analysis of the five aspects of the lifting construction technology: concrete mix, high-rise steel tube concrete lift pouring experiment, lifting interface design, lifting preformed hole design inside the steel tube column, and selection and layout of lifting concrete pump and pump pipe. Concrete Mix Performance requirements and control index of lifting concrete (Specification For Design and Construction of Concrete-Filled Steel Tubular Structure, 1990) High strength. Pumpability. Mixture of high strength concrete must have good segregation resistance and filling capability. Smaller contractibility rate. To ensure pouring quality of concrete inside the tube, obvious contraction between concrete and side walls of steel plate cannot appear. Higher flowability and smaller viscosity. As concrete inside the steel tube is poured with lifting technology, longitudinal and transverse dividing panels complicate the process. The flowing distance of the concrete inside the tube is long; therefore, the concrete is required to have higher flowability to ensure pouring quality and density. Small loss of concrete in pumping duration. On the Tianjin Tower plane, fifty-five pieces of combined steel and concrete columns, with steel tube diameters ranging from upper to lower parts 1,700~600mm, lift three floors below the 30th floor at one time and six floors over the 30th floor. The maximum volume of concrete for each singular steel tube column amounts to over 40m 3. In consideration of the transportation of concrete, waiting, and pouring time, one lifting will take at least two hours. Therefore, to ensure pouring quality, concrete lifting must ensure smaller duration and long distance pumping loss. Technology control measures of Lifting concrete. Based on performance requirements of concrete lifting inside the steel tube column and batching experience in similar projects, the following recommendations are made: control water to binder (cement) ratio of the concrete; choose high grade cement, binding material, sand and aggregates, and determine the best proportion through experiment; and add swelling agent and additives to ensure higher flowability, pumpability and smaller viscosity. Performance of lifted concrete reaches the following requirements: concrete strength over 60MPa, slump of 270mm, expansion of 650mm, no segregation at the time when it is taken from the tank, slump and expansion duration loss Figure 1. Tianjin Jinta Mansion (source: Yadiel) 图 1. 天津津塔 ( 出自 :Yadiel) 钢管混凝土顶升施工技术由于钢管柱内复杂的节点设计, 尤其是其内部存在的横纵交叉形式复杂的加劲板导致常规浇筑方法无法保证钢管内混凝土的质量, 需采用顶升浇筑法 下面分别从混凝土配合比设计 顶升模拟实验 顶升口设计 顶升预留孔设计及混凝土输送泵及泵管的选型和布置五个方面分析介绍顶升施工技术 混凝土配合比顶升混凝土的性能要求及控制指标 ( 钢管混凝土结构设计与施工规程,1990) 高强度. 可泵性 高强混凝土的拌合物必须具有良好的抗离析性和填充能力 较小的收缩率 为保证腔内混凝土顶升浇筑的质量, 混凝土与钢板侧壁之间不能出现明显收缩 较高的流动性和较小的黏度 钢管柱内部纵横隔板复杂, 腔内混凝土流动距离较长, 要求混凝土具有较高的流动性, 以保证浇注质量和密实度 Figure 2. Schematic diagram of Tianjin Tower (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 2. 津塔结构示意图 ( 出自 : 杨耀辉 ) 833

4 Figure 3. Section photo of test column (source: Yang Yaohui Gao Junfeng & Wang Jing) 图 3. 试验柱断面照片 ( 出自 : 杨耀辉 ) no bigger than 10mm, and long distance slump loss no bigger than 10mm four hours later. Super high-rise steel tube concrete lifting pouring experiment Since there is no effective approach to ensure quality of concrete inside the steel tube column internationally, especially around complicated dividing panels, it is difficult to check if it is cast densely. Common international practices also require testing before application of such technology to determine key parameters and operating instructions of technology. Therefore, prior to formal construction, choose two 1:1 symbolic steel tube columns and simulate practical pouring, make concrete filled steel tube lifting pouring experiment. After the experiment, it is found through cutting and breaking (see Figure 3): concrete of all cavities is very dense; concrete strength is in compliance with design requirements; no laitance layer exists in two pouring joint surface and no concrete contraction crack occurs between joint and tube wall. Lifting Interface Design In reference to the approach used in Taipei 101, a low-cost steel tube interface was selected, suitable for connection of various angles and easy operation. This interface will shorten connection time considerably, reduce waiting time when concrete is poured on site and ensure pouring quality. How to connect with the pump pipe. Cut a section of 300 mm or so from one end of a standard pump pipe. One end should be fastened to the standard pump pipe and the other end should be welded with a steel tube and connected with the other lifting interface (see Figure 4). How to connect with steel column. Keep about 120mm lifting interface at the inner side of the steel tube. Weld a piece of 200mm short pipe with the other end of the short pipe that is welded with a square steel plate to ensure connection with other interface with high strength bolts. In order to ensure force requirements of structure, weld an additional 26mm thick reinforcement steel plate at the opening in accordance with the ideas by the design unit (see Figure 5). Lifting preformed design inside steel tube column Three kinds of preformed holes are designed in this project. First, an exhaust opening (see Figure 6): preformed small 50mm circular holes on the transverse stiffening plate, convenient for exhausting of air below dividing panel during concrete pouring. Second, a grouting hole (see Figure 7): preformed 200~250mm circular holes on the transverse and longitudinal stiffening plates, in order for concrete to flow from one cavity to another. Third, an observing aperture: set one 10mm Figure 4. Lifting interface with pump pipe connecting section (source: Yang Yaohui Gao Junfeng & Wang Jing) 图 4. 与泵管连接端顶升接口 ( 出自 : 杨耀辉 ) 经时泵送损失小 工程 30 层以下一次顶升 3 层,30 层以上一次顶升 6 层, 单根钢管柱一次顶升浇筑最大方量达 40 多 m3 考虑混凝土的运输 等候和浇筑时间, 单根钢管柱一次顶升需耗时至少 2h 为保证浇筑质量, 混凝土必须具有较小的经时和长距离泵送损失 顶升混凝土技术控制措施 根据上述混凝土性能要求及以往类似工程顶升混凝土的配制经验, 工程实施中主要通过控制混凝土的水灰比 选用优质的水泥 胶凝材料和砂石并选择最佳比例 控制收缩率 加入适量膨胀剂及外加剂等措施来保证混凝土具有较高的流动性 和易性以及较小的泵送和经时损失, 根据天津当地的混凝土原材料研制出符合超高泵送性能的混凝土, 最后津塔泵送混凝土性能达到了如下要求 : 出灌坍落度能够达到 270mm, 扩展度大于 650mm, 并且不能离析,4h 坍落度经时损失不大于 10mm, 长距离泵送坍落度损失不大于 10mm 超高层钢管柱混凝土顶升浇筑试验鉴于目前钢管柱内混凝土质量在国际上还没有比较有效的手段, 尤其在复杂隔板周边的混凝土是否浇筑密实则更无法检测, 国际上通常的做法要求在该工艺应用前先进行试验验证, 从而确定工艺操作过程中的关键参数和操作要领 津塔工程在正式施工之前选择两根典型的钢管柱 1:1 模拟实际浇注情况, 进行顶升浇筑试验 试验结束后对钢管柱切割解剖 ( 见图 3) 发现, 各空腔内的混凝土均非常密实, 混凝土强度符合设计要求 ; 两次浇筑的结合面不存在明显的浮浆层 ; 同时, 结合面位置的混凝土与管壁间没有收缩缝隙 顶升接口设计津塔工程在参考台北 101 做法的基础上设计了一种价格便宜 适于各种角度连接 操作简便的钢管接口, 可显著缩短接管时间, 减少现场混凝土浇筑的等待时间, 保证浇注质量 与泵管如何连接 截取标准泵管端部一段约 300mm 长, 一端与标准泵管连接, 另一端则焊接钢板, 与其它顶升接口连接 ( 见图 4 ) 与钢管柱如何连接 在钢管柱内侧壁预留一直径 120mm 左右的顶升口, 并焊接一段约 200mm 的短管, 短管另一侧同样焊接一块方形钢板, 保证与其他接口采用高强螺栓连接 ( 见图 5) 同时为保证结构受力要求, 在开孔位置加强补焊一块 26mm 厚的钢板 钢管柱内顶升预留孔设计共设计排气孔 灌浆孔及观察孔三类预留孔, 排气孔 ( 见图 6) 在横向加劲板上预留, 便于混凝土浇筑时隔板下空气排出 ; 灌浆孔 ( 见图 7) 在横向和纵向加劲板上预留, 使混凝土能够从一个 834

5 Figure 5. Connecting end interface design with steel tube column (source: Yang Yaohui Gao Junfeng & Wang Jing) 图 5. 与钢管柱连接端顶升接口 ( 出自 : 杨耀辉 ) Figure 6. Exhaust opening (source: Yang Yaohui Gao Junfeng & Wang Jing) 图 6. 排气孔 ( 出自 : 杨耀辉 ) circular hole at 1m along column body; this is used for observation of concrete lifting inside the steel tube and is also helpful for exhaustion of air from the steel tube. Selection and layout of lifting concrete pump and pump pipe Selection of pump and pump pipe. Through the oretical pump pressure calculation (technical specification for construction of concrete pumping, 2011) and pumping simulation test. After the overall comparison, the Zoom lion HBT RS ultrahigh pressure concrete pump is selected. With its maximum at 26MPa, it fully meets pressure requirements for pumping lifting concrete. Additionally, with twenty percent reserved pressure and higher security, the φ125 high pressure pump pipe is to be used. Layout of pump. There are two sets of ultrahigh pressure concrete pumps at the site for concrete lifting pouring inside the steel tube. One is for common use and the other is used as a backup; both are laid out at southeast corner of the site. Layout of pump pipe. The horizontal pipe on the ground is no less than 60m long. Set transfer floors on the 31st and 46th floor on which a 20m horizontal pipe is prepared. Under the 30th floor, the ultrahigh pressure pump pipe will be adopted, with a wall thickness of 8mm and bearing pressure over 25MPa, pump pipe joint via flange connection. The vertical layout of the pump pipe is conducted along the steel column upward with pump pipe clamps welded on steel columns; the pump pipe s center distance is 400mm away from the steel column; the pump pipe clamps are laid out at the two ends of each section of the pumping pipe (see Figure 8). Construction technology on pure steel plate shear wall Construction difficult point analysis of pure steel plate shear wall Welding stress control. As per the design, the steel plate wall and ambient steel column and girder are to be connected with pure welding. Welding under restricted conditions all around will surely produce welding stress on steel plate wall. In case that such stress is too large, it will affect structural security of the entire tower building. Controlling welding stresses is the biggest difficulty in the steel plate wall construction of Tianjin Jinta Mansion project. Accelerate construction speed at site. There are 602 pieces of steel plate walls, 3,760 lines, 16,000m of welding seams in the entire core tube of Tianjin Jinta Mansion. Since the steel plate wall is hoisted at Figure 7. Grouting hole (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 7. 灌浆孔 ( 出自 : 杨耀辉 ) 空腔进入另一个空腔 ; 观察孔沿柱身设置, 用于观察混凝土在钢柱内的顶升情况, 同时也有助于钢柱内空气排出 超高压混凝土输送泵及泵管的选型和布置泵及泵管选型 经过详细理论泵压计算 ( 混凝土泵送技术规程,2011) 及泵送模拟实验, 综合对比后, 选择中联重科 HBT RS 型超高压混凝土输送泵, 其最大出口压力可达 26MPa, 完全满足泵送顶升混凝土的压力要求, 并且有 20% 的压力储备, 安全性更高 泵管使用直径 125mm 高压泵管 泵布置 超高压混凝土输送泵共两台, 一台正常使用, 一台备用 两台地泵布置在场地的东南角 泵管布置 地面水平管道 60m; 在 31 层 46 层设置转换层, 转换层楼面设置 20m 左右的水平管 ;30 层以下采用超高压泵管, 壁厚 8mm, 承载压力 25MPa; 泵管竖向沿钢柱向上布设, 在钢柱上焊接泵管卡, 使泵管卡中心距离钢柱表面 400mm, 泵管卡布置在每段泵管的两端 ( 见图 8) 纯钢板剪力墙施工技术 纯钢板剪力墙施工难点分析焊接应力控制 由于钢板墙与四周的钢柱 钢梁为纯焊接连接, 在四周均有约束的条件下进行焊接必然会在钢板墙上产生焊接应力, 这种焊接的应力过大会影响整个塔楼的结构安全, 如何控制焊接应力是钢板墙施工最大难点 835

6 Figure 8. Connection example of concrete pump pipe and steel column (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 8. 混凝土泵管与钢柱连接实例图 ( 出自 : 杨耀辉 ) a low speed, the welding quantity is significant. The structure s dead weight load borne by the steel wall shall be controlled and the steel plate wall welding will be postponed up to each of the fifteen floors of main structure. Therefore, acceleration of erection of the steel plate wall becomes the crucial factor to ensure structural progress and create conditions for follow-up construction. Ensure steel tube column manufacturing. To ensure normal conveying forces of the steel plate wall while the steel plate wall is connected with the steel tube column, corresponding stiffening plates need to be set inside the steel tube column. However, the setting of a full-length stiffening plate inside the steel tube column may make it impossible to weld the inner wall of steel tube. Therefore, the welding of a steel plate wall inside a steel tube column becomes a technically difficult point of steel pipe manufacturing. Ensure manufacturing accuracy. Manufacturing accuracy of the steel plate wall directly influences erection speed at site. This is especially true at the outrigger truss layer, when the steel plate wall and outrigger trusses are erected and are integrated as one structure. There are many interfaces and slight manufacturing deviation may make site erection impossible. Therefore, accuracy of the steel plate manufacturing is very important to site erection. Welding stress control Joint design. Connection joint design of steel wall and ambient frame column and truss girder (see Figure 9). Optimize welding technology. Steel plate wall welding technology at typical layer. 1) The welding sequence principle of steel plate walls of the entire building shall be completed as follows: from bottom to top and floor by floor. The welding sequence principle of steel plate walls of the core tube at all floors shall be completed from center to all sides gradually. 2) The welding sequence of each line of the welding seam of the steel plate walls (Wang Xiangdong Gao Huajie, 2010) shall be Figure 9. Welding seam joint design of typical floor steel plate wall (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 9. 标准层钢板墙焊缝节点设计 ( 出自 : 杨耀辉 ) 加快现场施工速度 整个核心筒共 602 块钢板墙,3760 道共 16000m 的焊缝, 由于钢板墙吊装速度慢, 焊接工程量大, 同时由于设计要求控制钢板墙承受结构自重荷载, 要求钢板墙延迟主体结构 15 层焊接, 因此, 如何加快钢板墙的安装和焊接速度成为保证结构进度和为后续施工创造条件的关键 保证钢管柱加工 钢板墙与钢管柱连接时为了保证钢板墙的正常传力, 钢管柱内需设置相应的传力劲板, 但是在钢管柱内设置通长的传力劲板会导致劲板与钢管内壁的焊接无法进行 如何保证钢管柱内钢板墙的焊接成为钢管柱加工的技术难点 加工精度保证 钢板墙的加工精度直接影响现场的安装速度, 尤其是在伸臂桁架层, 钢板墙和伸臂桁架合成一体安装时, 接口非常多, 加工稍有偏差将导致现场无法正常安装, 因此, 如何保证钢板墙的加工精度对现场安装进度至关重要 焊接应力控制节点设计 钢板墙与周边框架柱 框架梁的连接节点设计见图 9 优化焊接工艺 标准层钢板墙焊接工艺 1) 焊接顺序 : 整个大楼的钢板墙焊接顺序的原则为自下往上逐层焊接 ; 各层核心筒钢板墙焊接的原则为自中心向四周扩散 2) 钢板墙各道焊缝的焊接顺序 ( 王向东 高华杰等,2010): 先焊底部, 再焊左侧, 最后焊右侧 3) 每道焊缝的焊接工艺 : 两侧竖向焊缝焊接按照自上而下分段倒退焊接 底部横焊缝焊接须按 600mm 长进行分段倒退跳跃焊接 伸臂桁架层钢板墙焊接工艺 一跨钢板墙的现场焊缝有 6 道, 836

7 Figure 10. Steel plate wall welding sequence at outrigger truss (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 10. 伸臂桁架层钢板墙焊接顺序 ( 出自 : 杨耀辉 ) completed first at the bottom, then the left side, and finally, the right side. 3) The welding technology of each vertical welding seam at the two sides should be top to bottom and backward welding. Take a typical floor as an example, two welders can be arranged at the same time to complete vertical welding. Each worker may weld three sections, after he completes one section he can be rotated to the next section. Steel plate wall welding technology at outrigger truss layer. There are six lines of site welding seam in each steel plate wall at the outrigger truss layer with a welding sequences of each line of seam (see Figure 10). Unit optimization of steel plate wall manufacturing to accelerate site construction progress For the typical Layer. According to limit of transportation width to steel members, erect each steel plate wall as one unit followed by the top frame beam and steel plate wall as another unit (4.2m*6.65m) (see Figure 11). In order to reduce the site welding seam, four pieces of connecting plates at two sides of steel plate wall are divided into two groups and manufactured at the plant into one unit respectively with a steel column or steel plate wall. Outrigger truss layer. The interconnected relationship between transportation, the site butt joint and difficulty of assembly between the outrigger and the steel plate wall is taken into consideration. Each steel plate is generally divided into two triangular units (upper and lower) with each unit s steel plate wall and related outrigger truss members and frame beam manufactured into one unit at the plant. Through the manufacturing of complicated truss members, the frame beam and steel plate wall into one unit, welding seams at the site are reduced considerably. While the unit is split at site, transverse seams are mainly adopted to reduce vertical seams. Consider manufacturing optimization of steel tube column connecting with steel plate wall They are designed as steel tubes with longitudinal splitting after optimization, the main rib runs through tube wall with a specific joint (see Figure 12). Accuracy warranty It is advised to take preassembly beyond normal measures to ensure manufacturing accuracy of each member, any deviation will be rectified at the plant at once. Horizontal assembly by unit will be adopted during preassembly to reduce the height of the assembly frame. Figure 11. Unit division of steel plate wall at typical floor (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 11. 标准层钢板墙单元划分 ( 出自 : 杨耀辉 ) 各道焊缝的焊接顺序见图 10 为加快现场施工进度的钢板墙加工单元优化标准层 根据钢构件运输宽度 4.2m 的限制, 将每跨钢板墙作为一个安装单元, 并将顶部框架梁和钢板墙作为一个单元 (4.2m*6.65m)( 见图 11); 为了减少现场焊缝, 将钢板墙两侧的共四块连接板分成两组, 分别与钢柱或钢板墙在工厂预先制作成一个单元 伸臂桁架层 考虑到伸臂桁架和钢板墙的相互关系 运输限制 现场对接和焊缝的难易, 将每一跨的钢板墙基本分成上下两个三角单元, 每个单元的钢板墙和相关伸臂桁架杆件及框架梁在工厂制作成一个单元 ; 将复杂的桁架杆件 框架梁和钢板墙加工成一个单元, 大量的减少了现场焊缝数量 ; 在拆分单元时, 现场主要采用横向拼缝, 减少竖向拼缝 考虑钢板墙连接的钢管柱加工优化优化设计为钢管纵向剖开, 纵肋贯通管壁的节点形式 见图 12 加工精度保证采取措施保证每个杆件的加工精度, 同时还要求加工厂进行预拼装, 如发现偏差, 则在工厂内完成矫正 为降低拼装架的高度, 采用分单元卧式拼装的方式进行预拼装 Figure 12. Center steel tube column optimization of core tube (source: Yang Yaohui Gao Junfeng &Wang Jing) 图 12. 核心筒中心钢管柱优化 ( 出自 : 杨耀辉 ) 837

8 Conclusions Successful study and application of construction technology in Tianjin Jinta Mansion project effectively solved a number of construction complexities produced from lifting pouring of steel tube concrete and the first application of all welded steel plate shear walls in a super highrise building, ensured project quality, saved on cost, accelerated the construction progress, and provided a precedent for similar projects. 结论 津塔工程钢管混凝土结构及纯钢板剪力墙施工技术的成功研究与应用, 有效地解决了钢管混凝土顶升浇注和全焊接钢板剪力墙首次应用于超高层建筑中带来的多项施工技术难题, 保证了工程施工质量, 同时也节省了一定施工成本, 加快了施工进度, 为类似工程的实施提供了一些借鉴经验 References ( 参考书目 ): Specification For Design and Construction of Conctrete-Filled Steel Tubular Structures CECS28: 90, Harbin Institute of architecture and Engineering, Beijing,1992. Technical specification for construction of concrete pumping JGJ/T ,Ministry of construction of the people s Republic of China Welding Technology of Steel Plate in Tianjin Jinta Mansion, CONSTRUCTION TECHNOLOGY, 2010, Wang Xiangdong, Gao Huajie 838

m m m ~ mm

m m m ~ mm 2011 10 10 157 JOURNAL OF RAILWAY ENGINEERING SOCIETY Oct 2011 NO. 10 Ser. 157 1006-2106 2011 10-0007 - 0124-05 710043 6 TBM TBM U455. 43 A Structural Calculation and Analysis of Transfer Node of Three

More information

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm

Fig. 1 Frame calculation model 1 mm Table 1 Joints displacement mm 33 2 2011 4 ol. 33 No. 2 Apr. 2011 1002-8412 2011 02-0104-08 1 1 1 2 361003 3. 361009 3 1. 361005 2. GB50023-2009 TU746. 3 A Study on Single-span RC Frame Reinforced with Steel Truss System Yuan Xing-ren

More information

K301Q-D VRT中英文说明书141009

K301Q-D VRT中英文说明书141009 THE INSTALLING INSTRUCTION FOR CONCEALED TANK Important instuction:.. Please confirm the structure and shape before installing the toilet bowl. Meanwhile measure the exact size H between outfall and infall

More information

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315.

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct /35 TU3521 P315. 31 5 2011 10 JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 5 Oct. 2011 1000-1301 2011 05-0075 - 09 510405 1 /35 TU3521 P315. 8 A Earthquake simulation shaking table test and analysis

More information

m K K K K m Fig. 2 The plan layout of K K segment p

m K K K K m Fig. 2 The plan layout of K K segment p 410151 K7 + 914 - K7 + 984 12 5. 3 Midas DOI 10. 7617 /j. issn. 1000-8993. 2013. 09. 020 THE ANALYSIS OF THE DESIGN AND CONSTRUCTION SECURITY OF DEEP FOUNDATION IN PURUI TUNNEL OPEN-CUT SEGMENT Yang Ping

More information

kNΠm 2 5 % GB [4 5 ] ( ) ; m 100 ; 60m m ( A 114 [3 ] B 113) GB

kNΠm 2 5 % GB [4 5 ] ( ) ; m 100 ; 60m m ( A 114 [3 ] B 113) GB 37 3 Vol137 No13 2 0 0 4 3 CHINA CIVIL ENGINEERINGJOURNAL Mar. 2 0 0 4 ( J GJ322002) ( ) : (J GJ322002) 56 : ; ; ; ; : TU973 + 112 : A : 10002131X (2004) 0320001211 EXPLANATION ON SOME QUESTIONS ABOUT

More information

2 49 30667. 7m 2, 424008m 2,,,, 20. 5m,, 4. 6 m 2 3, - 14. 5m, 87200m 2,, ( ) Leoadaly 1 C40, 2200mm 2650mm, 30m, 49000kN 71000kN, 193m, 156m,,, 2 1,

2 49 30667. 7m 2, 424008m 2,,,, 20. 5m,, 4. 6 m 2 3, - 14. 5m, 87200m 2,, ( ) Leoadaly 1 C40, 2200mm 2650mm, 30m, 49000kN 71000kN, 193m, 156m,,, 2 1, 11 2 2009 4 Progress in Steel Building Structures Vol. 11 No. 2 Apr. 2009 1, 1, 1, 1, 1, 1, 2 (1. ( ), 518033 ; 2., 518031) : 238m, 260m, 17. 3, B,,, : ; ; ; ; : TU 355 : A : 1671-9379 (2009) 02-0048 -

More information

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec

JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec 31 6 2011 12 JOURNAL OF EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION Vol. 31 No. 6 Dec. 2011 1000-1301 2011 06-0159 - 08 1 1 1 1 2 1. 150080 2. 100124 1 2 3 P315. 93 TU 43 TU41 A Shaking table test

More information

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0067 - 06 1 2 ( 1. 苏 州 设 计 研 究 院 股 份 有 限 公 司, 江 苏 苏 州 215021; 2. 苏 州 市 消 防 支 队, 江 苏 苏 州 215021) 1 2 3 4

More information

Microsoft Word doc

Microsoft Word doc 中 考 英 语 科 考 试 标 准 及 试 卷 结 构 技 术 指 标 构 想 1 王 后 雄 童 祥 林 ( 华 中 师 范 大 学 考 试 研 究 院, 武 汉,430079, 湖 北 ) 提 要 : 本 文 从 结 构 模 式 内 容 要 素 能 力 要 素 题 型 要 素 难 度 要 素 分 数 要 素 时 限 要 素 等 方 面 细 致 分 析 了 中 考 英 语 科 试 卷 结 构 的

More information

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~

mm 5 1 Tab 1 Chemical composition of PSB830 finishing rolled rebars % C Si Mn P S V 0 38 ~ 1 50 ~ 0 80 ~ ~ PSB830 365000 32 mm PSB830 PSB830 TG 335 64 A Productive Practition of PSB830 Finishing Rolled Rebars PAN Jianzhou Bar Steel Rolling Minguang Co Ltd of Fujian Sansteel Sanming 365000 China Abstract High

More information

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6

Maup re,,,,,, ;,,,,,,,,,, PC 1985 Cognac,, 80, [ 526 ], 420m 160m [ 728 ], PC,,,,,,,,, , [ 3 ] 3008mm, 488mm, 222mm, ( ) 2880mm , 4914, 6 29 1 Vol129, No11 2008 2 Journal of Building Structures Feb1 2008 : 100026869 (2008) 0120075208, (, 350002) :, 3,,, ;, ; : ; ; ; ; : TU39819 TU31711 : A Experimental studies on concrete filled steel tubular

More information

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土

增 刊 谢 小 林, 等. 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 745 类 型, 水 位 埋 深 一 般 为 地 表 下.0~.7 m 场 地 地 表 以 下 27 m 处 分 布 7 层 砂 性 土, 为 第 一 承 压 含 水 层 ; 9 层 砂 性 土 第 34 卷 增 刊 岩 土 工 程 学 报 Vol.34 Supp. 202 年. 月 Chinese Journal of Geotechnical Engineering Nov. 202 上 海 中 心 裙 房 深 大 基 坑 逆 作 开 挖 设 计 及 实 践 谢 小 林 2 2, 翟 杰 群, 张 羽, 杨 科, 郭 晓 航, 贾 坚 (. 同 济 大 学 建 筑 设 计 研 究 院 (

More information

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5

#4 ~ #5 12 m m m 1. 5 m # m mm m Z4 Z5 2011 6 6 153 JOURNAL OF RAILWAY ENGINEERING SOCIETY Jun 2011 NO. 6 Ser. 153 1006-2106 2011 06-0014 - 07 300142 ABAQUS 4. 287 mm 6. 651 mm U455. 43 A Analysis of Impact of Shield Tunneling on Displacement

More information

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D>

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D> 企 业 及 产 品 简 介 COMPANY & PRODUCTS INTRODUCTION 山 东 泗 水 康 得 新 复 合 材 料 有 限 公 司 SHANDONG SISHUI KANGDE XIN COMPOSITE MATERIAL CO., LTD. 集 团 概 况 KDXGROUP OVERVIEW 1 拥 有 两 大 产 业 群 : 预 涂 膜 和 光 学 膜 1. GROUP HAS

More information

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi

Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candi U17 10220 UDC624 Thesis for the Master degree in Engineering Research on Negative Pressure Wave Simulation and Signal Processing of Fluid-Conveying Pipeline Leak Candidate:Chen Hao Tutor: Xue Jinghong

More information

Microsoft Word - 10-06-0186-D10-0627孙竹森.doc

Microsoft Word - 10-06-0186-D10-0627孙竹森.doc 第 34 卷 第 6 期 电 网 技 术 Vol. 34 No. 6 2010 年 6 月 Power System Technology Jun. 2010 文 章 编 号 :1000-3673(2010)06-0186-07 中 图 分 类 号 :TM 754 文 献 标 志 码 :A 学 科 代 码 :470 4051 输 电 线 路 钢 管 塔 的 推 广 与 应 用 孙 竹 森 1, 程

More information

热设计网

热设计网 例 例 Agenda Popular Simulation software in PC industry * CFD software -- Flotherm * Advantage of Flotherm Flotherm apply to Cooler design * How to build up the model * Optimal parameter in cooler design

More information

Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song

Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song Research of numerical simulation of high strength steel welding residual stress and fatigue life By Chen Song I ABSTRACT They are very necessary and important to carry on the research on the welding residual

More information

Shanghai International Studies University A STUDY ON SYNERGY BUYING PRACTICE IN ABC COMPANY A Thesis Submitted to the Graduate School and MBA Center I

Shanghai International Studies University A STUDY ON SYNERGY BUYING PRACTICE IN ABC COMPANY A Thesis Submitted to the Graduate School and MBA Center I 上 海 外 国 语 大 学 工 商 管 理 硕 士 学 位 论 文 ABC 中 国 食 品 公 司 的 整 合 采 购 研 究 学 科 专 业 : 工 商 管 理 硕 士 (MBA) 作 者 姓 名 :0113700719 指 导 教 师 : 答 辩 日 期 : 2013 年 12 月 上 海 外 国 语 大 学 二 一 四 年 一 月 Shanghai International Studies

More information

BC04 Module_antenna__ doc

BC04 Module_antenna__ doc http://www.infobluetooth.com TEL:+86-23-68798999 Fax: +86-23-68889515 Page 1 of 10 http://www.infobluetooth.com TEL:+86-23-68798999 Fax: +86-23-68889515 Page 2 of 10 http://www.infobluetooth.com TEL:+86-23-68798999

More information

Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditio

Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditio Building Technology Experience Center concept air conditioning concept heat pump special energy-saving techniques in hydraulics Concrete core conditioning Initial situation Passive House Technology Experience

More information

致 谢 开 始 这 篇 致 谢 的 时 候, 以 为 这 是 最 轻 松 最 愉 快 的 部 分, 而 此 时 心 头 却 充 满 了 沉 甸 甸 的 回 忆 和 感 恩, 一 时 间 竟 无 从 下 笔 虽 然 这 远 不 是 一 篇 完 美 的 论 文, 但 完 成 这 篇 论 文 要 感 谢

致 谢 开 始 这 篇 致 谢 的 时 候, 以 为 这 是 最 轻 松 最 愉 快 的 部 分, 而 此 时 心 头 却 充 满 了 沉 甸 甸 的 回 忆 和 感 恩, 一 时 间 竟 无 从 下 笔 虽 然 这 远 不 是 一 篇 完 美 的 论 文, 但 完 成 这 篇 论 文 要 感 谢 中 国 科 学 技 术 大 学 博 士 学 位 论 文 论 文 课 题 : 一 个 新 型 简 易 电 子 直 线 加 速 器 的 关 键 技 术 研 究 学 生 姓 名 : 导 师 姓 名 : 单 位 名 称 : 专 业 名 称 : 研 究 方 向 : 完 成 时 间 : 谢 家 麟 院 士 王 相 綦 教 授 国 家 同 步 辐 射 实 验 室 核 技 术 及 应 用 加 速 器 物 理 2006

More information

WTO

WTO 10384 200015128 UDC Exploration on Design of CIB s Human Resources System in the New Stage (MBA) 2004 2004 2 3 2004 3 2 0 0 4 2 WTO Abstract Abstract With the rapid development of the high and new technique

More information

m 3 m m 84 m m m m m m m

m 3 m m 84 m m m m m m m 2011 8 8 155 JOURNAL OF RAILWAY ENGINEERING SOCIETY Aug 2011 NO. 8 Ser. 155 1006-2106 2011 08-0096 - 06 430063 1 2 3 U231 +. 4 A Design of Underground Space of Furong Square Station of Urban Rail Transit

More information

Shanghai International Studies University THE STUDY AND PRACTICE OF SITUATIONAL LANGUAGE TEACHING OF ADVERB AT BEGINNING AND INTERMEDIATE LEVEL A Thes

Shanghai International Studies University THE STUDY AND PRACTICE OF SITUATIONAL LANGUAGE TEACHING OF ADVERB AT BEGINNING AND INTERMEDIATE LEVEL A Thes 上 海 外 国 语 大 学 硕 士 学 位 论 文 对 外 汉 语 初 中 级 副 词 情 境 教 学 研 究 与 实 践 院 系 : 国 际 文 化 交 流 学 院 学 科 专 业 : 汉 语 国 际 教 育 姓 名 : 顾 妍 指 导 教 师 : 缪 俊 2016 年 5 月 Shanghai International Studies University THE STUDY AND PRACTICE

More information

A dissertation for Master s degree Metro Indoor Coverage Systems Analysis And Design Author s Name: Sheng Hailiang speciality: Supervisor:Prof.Li Hui,

A dissertation for Master s degree Metro Indoor Coverage Systems Analysis And Design Author s Name: Sheng Hailiang speciality: Supervisor:Prof.Li Hui, 中 国 科 学 技 术 大 学 工 程 硕 士 学 位 论 文 地 铁 内 移 动 通 信 室 内 覆 盖 分 析 及 应 用 作 者 姓 名 : 学 科 专 业 : 盛 海 亮 电 子 与 通 信 导 师 姓 名 : 李 辉 副 教 授 赵 红 媛 高 工 完 成 时 间 : 二 八 年 三 月 十 日 University of Science and Technology of Ch A dissertation

More information

<4D6963726F736F667420576F7264202D203338B4C12D42A448A4E5C3C0B34EC3FE2DAB65ABE1>

<4D6963726F736F667420576F7264202D203338B4C12D42A448A4E5C3C0B34EC3FE2DAB65ABE1> ϲ ฯ र ቑ ጯ 高雄師大學報 2015, 38, 63-93 高雄港港史館歷史變遷之研究 李文環 1 楊晴惠 2 摘 要 古老的建築物往往承載許多回憶 也能追溯某些歷史發展的軌跡 位於高雄市蓬 萊路三號 現為高雄港港史館的紅磚式建築 在高雄港三號碼頭作業區旁的一片倉庫 群中 格外搶眼 這棟建築建成於西元 1917 年 至今已將近百年 不僅躲過二戰戰 火無情轟炸 並保存至今 十分可貴 本文透過歷史考證

More information

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel

successful and it testified the validity of the designing and construction of the excavation engineering in soft soil. Key words subway tunnel 2011 11 11 158 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2011 NO. 11 Ser. 158 1006-2106 2011 11-0104 - 08 1 2 1. 200048 2. 200002 < 20 mm 2 1 788 TU470 A Design and Construction of Deep Excavation Engineering

More information

BIBLID 0254-4466(2001)19:1 pp. 249-276 19 1 90 6 ** * ** 88 I 2000 8 249 250 19 1 251 1873-1929 1900 1 1902 1 35 1900 1960 7-12 252 19 1 2 3 2 1900 1902 3 2000 129-197 253 4 5 6 4 1902 1962 103 5 Joseph

More information

~ ~ Y 3 X / / mm 400 ~ 700 C40 ~ C ~ 400 C40 ~ C ~

~ ~ Y 3 X / / mm 400 ~ 700 C40 ~ C ~ 400 C40 ~ C ~ 43 7 2013 4 Building Structure Vol. 43 No. 7 Apr. 2013 518038 TU398 +. 2 A 1002-848X 2013 07-0059-06 Discussion on inclined column design of a super high-rise building Zhang Lin Zhang Delong Shenzhen CAPOL

More information

HCD0174_2008

HCD0174_2008 Reliability Laboratory Page: 1 of 5 Date: December 23, 2008 WINMATE COMMUNICATION INC. 9 F, NO. 111-6, SHING-DE RD., SAN-CHUNG CITY, TAIPEI, TAIWAN, R.O.C. The following merchandise was submitted and identified

More information

33 4-67 Fig. 1 1 Plan of typical floor 2 Fig. 2 Analysis model - 1 0. 85 4 1 Table 1 Period results s SATWE ETABS SAP2000 ABAQUS T 1 4. 681 4. 679 4.

33 4-67 Fig. 1 1 Plan of typical floor 2 Fig. 2 Analysis model - 1 0. 85 4 1 Table 1 Period results s SATWE ETABS SAP2000 ABAQUS T 1 4. 681 4. 679 4. 33 4 2011 8 Earthquake Resistant Engineering and Retrofitting Vol. 33 No. 4 Aug. 2011 1002-8412 2011 04-0066-07-1 2 2 2 3 1. 100084 2. 518029 3 523808-215m 11. 2 - TU973 +. 17 A Summarization of Structural

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 i ii Abstract The most important task in human resource management is to encourage and help employees to develop their potential so that they can fully contribute to the organization s goals. The main

More information

2005 Research on the Lucre, Risk, and Development of Native Bankcard Business 2005 3 2003 6.5 45 18, WTO SWOT I Abstract Research on the Lucre, Risk, and Development of Native Bankcard Business Research

More information

T K mm mm Q345B 600 mm 200 mm 50 mm 600 mm 300 mm 50 mm 2 K ~ 0. 3 mm 13 ~ 15 mm Q345B 25

T K mm mm Q345B 600 mm 200 mm 50 mm 600 mm 300 mm 50 mm 2 K ~ 0. 3 mm 13 ~ 15 mm Q345B 25 23 4 2018 8 Vol. 23 No. 4 JOURNAL OF HARBIN UNIVERSITY OF SCIENCE AND TECHNOLOGY Aug. 2018 Q345B 1 " 1 2 2 2 1. 150040 2. 200125 Q345B 536. 47 MPa 281 HV Q345B DOI 10. 15938 /j. jhust. 2018. 04. 021 TG444

More information

pdf

pdf THE INSTLLING INSTRUCTION FOR CONCELED TNK Important instuction:.. Please confirm the structure and shape before installing the toilet bowl. Meanwhile measure the exact size H between outfall and infall

More information

Microsoft Word - HC20138_2010.doc

Microsoft Word - HC20138_2010.doc Page: 1 of 7 Date: April 26, 2010 WINMATE COMMUNICATION INC. 9 F, NO. 111-6, SHING-DE RD., SAN-CHUNG CITY, TAIPEI, TAIWAN, R.O.C. The following merchandise was submitted and identified by the vendor as:

More information

Preface This guide is intended to standardize the use of the WeChat brand and ensure the brand's integrity and consistency. The guide applies to all d

Preface This guide is intended to standardize the use of the WeChat brand and ensure the brand's integrity and consistency. The guide applies to all d WeChat Search Visual Identity Guidelines WEDESIGN 2018. 04 Preface This guide is intended to standardize the use of the WeChat brand and ensure the brand's integrity and consistency. The guide applies

More information

压 缩 分 散 型 预 应 力 锚 索 近 年 来 有 了 较 多 的 应 用, 并 取 得 了 良 好 的 加 固 效 果 软 弱 岩 土 体 的 主 要 特 性 是 无 论 其 峰 值 强 度 还 是 残 余 强 度 都 是 很 低 的, 其 承 载 力 低 稳 定 性 差 压 缩 分 散 型

压 缩 分 散 型 预 应 力 锚 索 近 年 来 有 了 较 多 的 应 用, 并 取 得 了 良 好 的 加 固 效 果 软 弱 岩 土 体 的 主 要 特 性 是 无 论 其 峰 值 强 度 还 是 残 余 强 度 都 是 很 低 的, 其 承 载 力 低 稳 定 性 差 压 缩 分 散 型 第 8 卷 第 2 期 中 国 水 利 水 电 科 学 研 究 院 学 报 Vol.8 No.2 年 6 月 Journal of China Institute of Water Resources amd Hydropower Research June, 文 章 编 号 :1672-3031()02-0121-07 压 缩 分 散 型 锚 索 在 软 弱 岩 土 中 的 应 用 与 试 验 研

More information

<4D6963726F736F667420576F7264202D20B5DAC8FDB7BDBE57C9CFD6A7B8B6D6AEB7A8C2C98696EE7DCCBDBEBF2E646F63>

<4D6963726F736F667420576F7264202D20B5DAC8FDB7BDBE57C9CFD6A7B8B6D6AEB7A8C2C98696EE7DCCBDBEBF2E646F63> 題 目 : 第 三 方 網 上 支 付 之 法 律 問 題 探 究 Title:A study on legal issues of the third-party online payment 姓 名 Name 學 號 Student No. 學 院 Faculty 課 程 Program 專 業 Major 指 導 老 師 Supervisor 日 期 Date : 王 子 瑜 : 1209853J-LJ20-0021

More information

标题

标题 第 48 卷 第 6 期 2 1 6 年 6 月 哈 尔 滨 工 业 大 学 学 报 JOURNAL OF HARBIN INSTITUTE OF TECHNOLOGY Vol 48 No 6 Jun. 216 doi:1.11918 / j.issn.367 6234.216.6.1 大 跨 度 楼 盖 结 构 在 运 动 荷 载 下 的 振 动 性 能 杨 维 国 1, 马 伯 涛 2, 宋 毛

More information

% % % % % % ~

% % % % % % ~ 1001-5558 2015 03-0021-16 2010 C91 A 2014 5 2010 N. W. Journal of Ethnology 2015 3 86 2015.No.3 Total No.86 2010 2010 2181.58 882.99 40.47% 1298.59 59.53% 2013 2232.78 847.29 37.95% 1385.49 62.05% 1990

More information

I

I The Effect of Guided Discovery on The Learning Achievement and Learning Transfer of Grade 5 Students in Primary Schools I II Abstract The Effect of Guided Discovery on The Learning Achievement And Learning

More information

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行 火 电 机 组 小 岛 运 行 工 况 分 析 刘 伟 东 方 电 气 股 份 有 限 公 司, 成 都 610036 摘 要 : 目 前 执 行 的 对 外 火 电 工 程 合 同 中, 不 管 装 机 大 小, 大 部 分 都 要 求 机 组 验 收 时 完 成 小 岛 运 行 试 验 ( 即 FCB 或 House load operation), 并 作 为 重 要 的 验 收 条 件 基

More information

10384 200115009 UDC Management Buy-outs MBO MBO MBO 2002 MBO MBO MBO MBO 000527 MBO MBO MBO MBO MBO MBO MBO MBO MBO MBO MBO Q MBO MBO MBO Abstract Its related empirical study demonstrates a remarkable

More information

Microsoft Word - ChineseSATII .doc

Microsoft Word - ChineseSATII .doc 中 文 SAT II 冯 瑶 一 什 么 是 SAT II 中 文 (SAT Subject Test in Chinese with Listening)? SAT Subject Test 是 美 国 大 学 理 事 会 (College Board) 为 美 国 高 中 生 举 办 的 全 国 性 专 科 标 准 测 试 考 生 的 成 绩 是 美 国 大 学 录 取 新 生 的 重 要 依

More information

2 79 1. 2 1 1. 1 27 15 1 1 / OA FAS /BAS /ACS /AFC 1. 3 1. 4 2 2. 1

2 79 1. 2 1 1. 1 27 15 1 1 / OA FAS /BAS /ACS /AFC 1. 3 1. 4 2 2. 1 2012 2 2 161 JOURNAL OF RAILWAY ENGINEERING SOCIETY Feb 2012 NO. 2 Ser. 161 1006-2106 2012 02-0078 - 08 430063 U121 A Discussion on Project Interface Management of Vechile Base of Urban Rail Transit LIU

More information

Microsoft PowerPoint _代工實例-1

Microsoft PowerPoint _代工實例-1 4302 動態光散射儀 (Dynamic Light Scattering) 代工實例與結果解析 生醫暨非破壞性分析團隊 2016.10 updated Which Size to Measure? Diameter Many techniques make the useful and convenient assumption that every particle is a sphere. The

More information

( ) ( ) ( ) ( )

( ) ( ) ( ) ( ) 95 7 89-114 * ( ) 600 544 * E-mailyingdear@gmail.com Tel0937-597234 90 95 7 1200 894 ( ) ( ) ( ) 501-1000 ( ) 91 1980 1989 ( 2001 ) 1 2004 1992 1 1994 212,254 151,989 6,020 2,344 38,473 105,152 0 1995

More information

HC50246_2009

HC50246_2009 Page: 1 of 7 Date: June 2, 2009 WINMATE COMMUNICATION INC. 9 F, NO. 111-6, SHING-DE RD., SAN-CHUNG CITY, TAIPEI, TAIWAN, R.O.C. The following merchandise was submitted and identified by the vendor as:

More information

发 展 战 略 油 机 关 机 构 如 何 进 行 调 整, 无 论 是 在 石 油 工 业 部 时 期, 还 是 在 总 公 司 集 团 公 司 时 期, 战 略 和 政 策 研 究 一 直 得 到 领 导 重 视 中 国 石 油 总 部 机 关 始 终 明 确 有 战 略 和 政 策 研 究 归

发 展 战 略 油 机 关 机 构 如 何 进 行 调 整, 无 论 是 在 石 油 工 业 部 时 期, 还 是 在 总 公 司 集 团 公 司 时 期, 战 略 和 政 策 研 究 一 直 得 到 领 导 重 视 中 国 石 油 总 部 机 关 始 终 明 确 有 战 略 和 政 策 研 究 归 加 强 中 国 石 油 战 略 和 政 策 研 究 的 若 干 思 考 1 周 敬 成 1 许 萍 2 杜 一 博 1. 中 国 石 油 天 然 气 集 团 公 司 政 策 研 究 室 ;2. 中 国 石 油 华 北 油 田 公 司 第 一 采 油 厂 摘 要 : 在 现 代 企 业 发 展 和 竞 争 中, 战 略 处 于 核 心 地 位 中 国 石 油 作 为 国 有 骨 干 企 业 和 特 大

More information

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip

Fig. 1 1 The sketch for forced lead shear damper mm 45 mm 4 mm 200 mm 25 mm 2 mm mm Table 2 The energy dissip * - 1 1 2 3 1. 100124 2. 100124 3. 210018 - ABAQUS - DOI 10. 13204 /j. gyjz201511033 EXPERIMENTAL STUDY AND THEORETICAL MODEL OF A NEW TYPE OF STEEL-LEAD DAMPING Shen Fei 1 Xue Suduo 1 Peng Lingyun 2 Ye

More information

WTO OEM

WTO OEM 10384 200115142 UDC A Study on the Developing Strategy of Xiamen Evere Sports Goods Co., Ltd. A Case Study based on the Theory of Value Chain (MBA) 2005 5 2005 6 2005 5 2005 5 WTO OEM Abstract Abstract

More information

Yuandong-hawks Ball valve cdr

Yuandong-hawks Ball valve cdr Yuandong 奉化市远东车辆部件有限公司 Fenghua Yuandong Auto Parts imited Company 奉化市哈克斯自动化设备有限公司 Fenghua awks Automatic Equipment imited Company igh Pressure Ball Valve igh pressure Ball valve is mainly used in the hydraulic

More information

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [

1556 地 理 科 学 进 展 30 卷 他 关 于 农 村 住 房 结 构 与 抗 震 性 能 的 研 究, 则 多 是 从 工 程 抗 灾 的 角 度, 研 究 某 种 构 造 类 型 的 房 屋, 力 图 找 到 传 统 房 屋 的 结 构 失 误 和 新 建 房 屋 中 存 在 的 问 [ 第 30 卷 第 12 期 2011 年 12 月 地 理 科 学 进 展 PROGRESS IN GEOGRAPHY Vol.30, No.12 Dec., 2012 中 国 农 村 地 区 住 房 结 构 的 区 域 差 异 及 其 影 响 因 素 1, 2, 李 方 一 3 1,, 高 晓 路 2 2, 王 英 杰 (1. 中 国 科 学 院 区 域 可 持 续 发 展 分 析 与 模 拟 重

More information

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代

Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化, 鼓 励 替 代 Chinese oil import policies and reforms SINOPEC EDRI 2014.8 Chinese oil import policies and reforms 随 着 经 济 的 发 展, 目 前 中 国 石 油 消 费 总 量 已 经 跃 居 世 界 第 二 作 为 一 个 负 责 任 的 大 国, 中 国 正 在 积 极 推 进 能 源 进 口 多 元 化,

More information

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut

Revit Revit Revit BIM BIM 7-9 3D 1 BIM BIM 6 Revit 0 4D 1 2 Revit Revit 2. 1 Revit Revit Revit Revit 2 2 Autodesk Revit Aut 60 2 2016 2 RAILWAY STANDARD DESIGN Vol. 60 No. 2 Feb. 2016 1004-2954201602-0071-06 BIM 1 1 2 2 1 1. 7140992. 710054 BIM BIM 3D 4D nd BIM 1 3D 4D Revit BIM BIM U442. 5TP391. 72 A DOI10. 13238 /j. issn.

More information

114 鄭國雄 陳俊宏 臺北捷運的新材料 新工法與新技術 累積四分之一世紀的若干標竿分享 一 前言 臺北都會區大眾捷運系統目前已完工通車的路網包括文山內湖線 淡水線 中和線 新店線 南港線 板橋線 土城線 小南門線 南港線東延段 新莊線及蘆洲線等 長度 約 120 公里 計 104 座車站 平常每日

114 鄭國雄 陳俊宏 臺北捷運的新材料 新工法與新技術 累積四分之一世紀的若干標竿分享 一 前言 臺北都會區大眾捷運系統目前已完工通車的路網包括文山內湖線 淡水線 中和線 新店線 南港線 板橋線 土城線 小南門線 南港線東延段 新莊線及蘆洲線等 長度 約 120 公里 計 104 座車站 平常每日 捷運技術半年刊 第 48 期 113 臺北捷運的新材料 新工法與新技術 累積四分之一世紀的若干標竿分享 鄭國雄 1 陳俊宏 2 摘要 臺北捷運系統自開始規劃至今已長達 25 年 從木柵線 85 年 3 月通車及 86 年淡水線之分 段通車 至目前 120 公里之通車路線 提供民眾享受快速 便捷之現代大眾運輸方式之交通生 活 回想過去 捷運工程為一具技術密集 資金密集性 為規模龐大且複雜之系統工程 當初

More information

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal

Fig. 1 Layout of Zipingpu Concrete Face Rock-fill Dam Fig. 2 Typical section of Zipingpu Concrete Face Rock-fill Dam gal 5.12 5.12 100 cm 60 cm 5.12 TV641.4P631.4 A 10004548(2008)06079507 1962 E-mail: sschen@nhri.cn Analysis of effects of 5.12 Wenchuan Earthquake on Zipingpu Concrete Face Rock-fill Dam CHEN Sheng-shuiHUO

More information

中山大學學位論文典藏

中山大學學位論文典藏 -- IEMBA 3 ii 4W2H Who( ) When( ) What( ) Why( ) How much( ) How to do( ) iii Abstract Pharmaceutical industry can be regard as one of the knowledge-intensive industries. Designing a sales promotion for

More information

Tenure-track Tenure-track WTO Peer Effect 46

Tenure-track Tenure-track WTO Peer Effect 46 2004 ~ 2014 * 21 Tenure-track 2004 2004 Tenure-track * 45 2015 1 3 21 2003 Tenure-track Tenure-track WTO 2004 985 Peer Effect 46 2007 Tenure-track Tenure AAUP 1915 12 31 1 1940 7 1 Tenure-track 2 Tenure

More information

A study on the Fire Safety of Interior Finishes: Residential Buildings in Kaohsiung City taken as Examples between the interior design of safety and skill tests of Scholastic. A Thesis Submitted to Institute

More information

A Study on the Relationships of the Co-construction Contract A Study on the Relationships of the Co-Construction Contract ( ) ABSTRACT Co-constructio in the real estate development, holds the quite

More information

STEAM STEAM STEAM ( ) STEAM STEAM ( ) 1977 [13] [10] STEM STEM 2. [11] [14] ( )STEAM [15] [16] STEAM [12] ( ) STEAM STEAM [17] STEAM STEAM STEA

STEAM STEAM STEAM ( ) STEAM STEAM ( ) 1977 [13] [10] STEM STEM 2. [11] [14] ( )STEAM [15] [16] STEAM [12] ( ) STEAM STEAM [17] STEAM STEAM STEA 2017 8 ( 292 ) DOI:10.13811/j.cnki.eer.2017.08.017 STEAM 1 1 2 3 4 (1. 130117; 2. + 130117; 3. 130022;4. 518100) [ ] 21 STEAM STEAM STEAM STEAM STEAM STEAM [ ] STEAM ; ; [ ] G434 [ ] A [ ] (1970 ) E-mail:ddzhou@nenu.edu.cn

More information

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the 中 苗 農 村 再 生 社 區 農 村 建 設 設 施 體 檢 之 評 估 (1) 黃 隆 明 (2) 林 芸 暄 摘 要 (3) 徐 森 彥 本 研 究 蒐 集 民 國 90 年 至 103 年, 中 苗 地 區 88 個 農 再 社 區 中, 以 往 災 害 通 報 較 頻 繁 之 農 村 建 設 設 施, 作 為 辦 理 體 檢 評 估 之 對 象 ; 除 了 運 用 GIS 掌 握 農 村

More information

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C

0 1 / m m 2 ~ 3. 9m 3. 2m 1 / m 23. 6m mm 3 300mm 32. 1% 38. 1% 250mm C60 ~ C50 ~ C40 C Journal of Building Structures 1000-6869 2011 06-0010-08 32 6 2011 6 Vol. 32 No. 6 June 2011 002 200092 14 1 /15 7 7 7 8 MIDAS 7 TU973 TU317. 1 A Seismic performance of multi-tower structure with large

More information

國家圖書館典藏電子全文

國家圖書館典藏電子全文 A Study on the Job Stress and the Ways of Coping for the Director of Elementary School in the Middle Area of Taiwan Abstract This study aims at probing the subject current status as related to stress and

More information

世新稿件end.doc

世新稿件end.doc Research Center For Taiwan Economic Development (RCTED) 2003 8 1 2 Study of Operational Strategies on Biotechnology Pharmaceutical Products Industry in Taiwan -- Case Study on Sinphar Pharmaceutical Company

More information

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified

~ 4 mm h 8 60 min 1 10 min N min 8. 7% min 2 9 Tab. 1 1 Test result of modified 30 1 2013 1 Journal of Highway and Transportation Research and Development Vol. 30 No. 1 Jan. 2013 doi 10. 3969 /j. issn. 1002-0268. 2013. 01. 004 1 2 2 2 2 1. 400074 2. 400067 240 U416. 217 A 1002-0268

More information

認可人士、註冊結構工程師及註冊岩土工程師作業備考 APP-142

認可人士、註冊結構工程師及註冊岩土工程師作業備考 APP-142 2009 年 8 月 按 新 分 類 方 法 重 新 發 布 的 認 可 人 士 註 冊 結 構 工 程 師 及 註 冊 岩 土 工 程 師 作 業 備 考 APP-142 屋 宇 署 認 可 人 士 及 註 冊 結 構 工 程 師 作 業 備 考 296 2004 年 混 凝 土 的 結 構 使 用 作 業 守 則 2004 年 混 凝 土 的 結 構 使 用 作 業 守 則 ( 下 稱 守 則

More information

致 谢 本 人 自 2008 年 6 月 从 上 海 外 国 语 大 学 毕 业 之 后, 于 2010 年 3 月 再 次 进 入 上 外, 非 常 有 幸 成 为 汉 语 国 际 教 育 专 业 的 研 究 生 回 顾 三 年 以 来 的 学 习 和 生 活, 顿 时 感 觉 这 段 时 间 也

致 谢 本 人 自 2008 年 6 月 从 上 海 外 国 语 大 学 毕 业 之 后, 于 2010 年 3 月 再 次 进 入 上 外, 非 常 有 幸 成 为 汉 语 国 际 教 育 专 业 的 研 究 生 回 顾 三 年 以 来 的 学 习 和 生 活, 顿 时 感 觉 这 段 时 间 也 精 英 汉 语 和 新 实 用 汉 语 课 本 的 对 比 研 究 The Comparative Study of Jing Ying Chinese and The New Practical Chinese Textbook 专 业 : 届 别 : 姓 名 : 导 师 : 汉 语 国 际 教 育 2013 届 王 泉 玲 杨 金 华 1 致 谢 本 人 自 2008 年 6 月 从 上 海 外

More information

Microsoft Word - TIP006SCH Uni-edit Writing Tip - Presentperfecttenseandpasttenseinyourintroduction readytopublish

Microsoft Word - TIP006SCH Uni-edit Writing Tip - Presentperfecttenseandpasttenseinyourintroduction readytopublish 我 难 度 : 高 级 对 们 现 不 在 知 仍 道 有 听 影 过 响 多 少 那 次 么 : 研 英 究 过 文 论 去 写 文 时 作 的 表 技 引 示 巧 言 事 : 部 情 引 分 发 言 该 生 使 在 中 用 过 去, 而 现 在 完 成 时 仅 表 示 事 情 发 生 在 过 去, 并 的 哪 现 种 在 时 完 态 成 呢 时? 和 难 过 道 去 不 时 相 关? 是 所 有

More information

国土技術政策総合研究所 プロジェクト研究報告

国土技術政策総合研究所 プロジェクト研究報告 315 2006 6 YSK-N-115 i Technical Note of NILIM No. 315 June 2006 YSK-N-115 The characteristic of aircraft type about world airlines Natsuko SENDA * Tomoki ISHIKURA** Yoshihisa SUGIMURA** Masaki ISHII***

More information

我国原奶及乳制品安全生产和质量安全管理研究

我国原奶及乳制品安全生产和质量安全管理研究 密 级 论 文 编 号 中 国 农 业 科 学 院 硕 士 学 位 论 文 我 国 原 奶 及 乳 制 品 质 量 安 全 管 理 研 究 Study on Quality and Safety Management of Raw Milk and Dairy Products in China 申 请 人 : 段 成 立 指 导 教 师 : 叶 志 华 研 究 员 张 蕙 杰 研 究 员 申 请

More information

~ ~

~ ~ * 40 4 2016 7 Vol. 40 No. 4 July 2016 35 Population Research 2014 1 2016 2016 9101. 0 40 49. 6% 2017 ~ 2021 1719. 5 160 ~ 470 100872 Accumulated Couples and Extra Births under the Universal Tw o-child

More information

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva

LaDefense Arch Petronas Towers 2009 CCTV MOMA Newmark Hahn Liu 8 Heredia - Zavoni Barranco 9 Heredia - Zavoni Leyva 39 6 2011 12 Journal of Fuzhou University Natural Science Edition Vol 39 No 6 Dec 2011 DOI CNKI 35-1117 /N 20111220 0901 002 1000-2243 2011 06-0923 - 07 350108 105 m 14 69% TU311 3 A Seismic analysis of

More information

國立中山大學學位論文典藏.PDF

國立中山大學學位論文典藏.PDF I II III The Study of Factors to the Failure or Success of Applying to Holding International Sport Games Abstract For years, holding international sport games has been Taiwan s goal and we are on the way

More information

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378>

<4D6963726F736F667420576F7264202D20B8DFB9B0B0D3B0D3F5E0D3A6C1A6CAB5B2E2D3EBBCC6CBE3BDE1B9FBB2EED2ECD4ADD2F2B7D6CEF62DD5C5B9FAD0C22E646F6378> 高 拱 坝 坝 踵 应 力 实 测 与 计 算 结 果 差 异 原 因 分 析 张 国 新 周 秋 景 ( 中 国 水 利 水 电 科 学 研 究 院, 北 京 100038) 摘 要 : 坝 踵 应 力 是 关 系 到 混 凝 土 坝 是 否 开 裂 和 安 全 的 一 个 重 要 指 标, 不 管 是 用 结 构 力 学 法 还 是 有 限 元 法 都 能 计 算 出 坝 踵 有 一 定 的 拉

More information

A VALIDATION STUDY OF THE ACHIEVEMENT TEST OF TEACHING CHINESE AS THE SECOND LANGUAGE by Chen Wei A Thesis Submitted to the Graduate School and Colleg

A VALIDATION STUDY OF THE ACHIEVEMENT TEST OF TEACHING CHINESE AS THE SECOND LANGUAGE by Chen Wei A Thesis Submitted to the Graduate School and Colleg 上 海 外 国 语 大 学 SHANGHAI INTERNATIONAL STUDIES UNIVERSITY 硕 士 学 位 论 文 MASTER DISSERTATION 学 院 国 际 文 化 交 流 学 院 专 业 汉 语 国 际 教 育 硕 士 题 目 届 别 2010 届 学 生 陈 炜 导 师 张 艳 莉 副 教 授 日 期 2010 年 4 月 A VALIDATION STUDY

More information

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y

~ 10 2 P Y i t = my i t W Y i t 1000 PY i t Y t i W Y i t t i m Y i t t i 15 ~ 49 1 Y Y Y 15 ~ j j t j t = j P i t i = 15 P n i t n Y * 35 4 2011 7 Vol. 35 No. 4 July 2011 3 Population Research 1950 ~ 1981 The Estimation Method and Its Application of Cohort Age - specific Fertility Rates Wang Gongzhou Hu Yaoling Abstract Based on the

More information

國立臺灣藝術大學

國立臺灣藝術大學 國 立 臺 灣 藝 術 大 學 藝 術 與 人 文 教 學 研 究 所 碩 士 學 位 論 文 本 論 文 獲 國 家 教 育 研 究 院 博 ( 碩 ) 士 論 文 研 究 獎 助 課 外 讀 物 對 於 國 小 低 年 級 國 語 科 教 科 書 輔 助 性 之 研 究 - 以 新 北 市 100 年 度 國 民 小 學 推 動 閱 讀 計 畫 優 良 圖 書 為 例 指 導 教 授 : 張 純

More information

31 17 www. watergasheat. com km 2 17 km 15 km hm % mm Fig. 1 Technical route of p

31 17 www. watergasheat. com km 2 17 km 15 km hm % mm Fig. 1 Technical route of p 31 17 215 9 CHINA WATER & WASTEWATER Vol. 31 No. 17 Sep. 215 < > 232 SUSTAIN BMP SUSTAIN TU992 C 1-462 215 17-111 - 8 Planning and Design of Sponge City Case Study of Beijing Yongding River Ecological

More information

01-0982.doc

01-0982.doc 第 32 卷 第 7 期 岩 土 工 程 学 报 Vol.32 No.7 2010 年 7 月 Chinese Journal of Geotechnical Engineering July 2010 沿 海 碎 石 回 填 地 基 上 高 能 级 强 夯 系 列 试 验 对 比 研 究 年 廷 凯 1,2, 水 伟 厚 3, 李 鸿 江 4, 杨 庆 1,2, 王 玉 立 (1. 大 连 理 工

More information

2005 4,,,,,,,,,,,,, (2001 ) ;() ( 1997 ) ; ( 1997 ) ; () (1996 ) ;,: ( 1995 ) ; (1995 ),,,, (J13) (J9) (J10), (J19) (J17) 58

2005 4,,,,,,,,,,,,, (2001 ) ;() ( 1997 ) ; ( 1997 ) ; () (1996 ) ;,: ( 1995 ) ; (1995 ),,,, (J13) (J9) (J10), (J19) (J17) 58 ,,,, 44 %,,,,,,,,,,,, 57 2005 4,,,,,,,,,,,,, (2001 ) ;() ( 1997 ) ; ( 1997 ) ; () (1996 ) ;,: ( 1995 ) ; (1995 ),,,, (J13) (J9) (J10), (J19) (J17) 58 ,,,,,,,,,,, 1945 11 5,, ( ) : ; 1945 11,,,,,:, 1987,802,

More information

162 方 忠 明 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 一 香 港 鐵 路 有 限 公 司 (MTR) 與 港 鐵 路 網 1975 年 香 港 政 府 鑑 於 都 市 交 通 的 日 益 繁 忙, 成

162 方 忠 明 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 一 香 港 鐵 路 有 限 公 司 (MTR) 與 港 鐵 路 網 1975 年 香 港 政 府 鑑 於 都 市 交 通 的 日 益 繁 忙, 成 捷 運 技 術 半 年 刊 第 46 期 161 香 港 辦 理 以 大 眾 運 輸 導 向 之 開 發 與 我 國 辦 理 臺 北 都 會 區 捷 運 土 地 開 發 之 探 討 1 方 忠 明 摘 要 TOD 模 式 是 捷 運 建 設 開 發 規 劃 的 理 念 趨 勢, 沿 著 捷 運 廊 道 進 行 高 密 度 的 土 地 開 發, 配 合 其 他 大 眾 運 輸 工 具 和 行 人 網

More information

國立屏東師範學院國民教育研究所碩士論文

國立屏東師範學院國民教育研究所碩士論文 國 立 屏 東 大 學 不 動 產 經 營 學 系 碩 士 班 碩 士 論 文 指 導 教 授 : 鄭 博 文 博 士 台 灣 與 大 陸 住 宅 政 策 之 法 律 保 障 研 究 生 : 呂 芳 雄 撰 中 華 民 國 一 四 年 六 月 台 灣 與 大 陸 住 宅 政 策 之 保 障 謝 誌 名 師 指 導 片 刻, 勝 君 苦 讀 終 日 對 於 離 開 學 校 相 當 多 年 又 坐 五

More information

WTO

WTO 10384 X0115018 UDC MBA 2004 5 14 2004 6 1 WTO 2004 2006 7 2 Abstract According to the promise after our country enter into WTO, our country will open the readymade oil retail market in the end of 2004

More information

南華大學數位論文

南華大學數位論文 南 華 大 學 ( 文 學 所 ) 碩 士 論 文 論 文 題 目 ( 陳 千 武 小 說 活 著 回 來 及 其 相 關 事 例 研 究 ) 論 文 題 目 (Chen Chien Wu Return Alive And Some Research About It) 研 究 生 : 朱 妍 淩 指 導 教 授 : 林 葉 連 中 華 民 國 一 0 一 年 6 月 8 日 陳 千 武 小 說

More information

1對外華語文詞彙教學的策略研究_第三次印).doc

1對外華語文詞彙教學的策略研究_第三次印).doc 37 92 1 16 1 2 3 4 5 6 7 8????? 9????????? 10???????????????????? 11? 12 13 14 15 16 The Strategy Research of Teaching Chinese as a Second Language Li-Na Fang Department of Chinese, National Kaohsiung

More information

OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) ( ) CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 (

OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) ( ) CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 ( 35 1 2006 48 35-46 OncidiumGower Ramsey ) 2 1(CK1) 2(CK2) 1(T1) 2(T2) (93 5 28 95 1 9 ) 94 1-2 5-6 8-10 94 7 CK1 43 (A 44.2 ) CK2 66 (A 48.5 ) T1 40 (A 47.5 ) T2 73 (A 46.6 ) 3 CK2 T1 T2 CK1 2006 8 16

More information

HC20131_2010

HC20131_2010 Page: 1 of 8 Date: April 14, 2010 WINMATE COMMUNICATION INC. 9 F, NO. 111-6, SHING-DE RD., SAN-CHUNG CITY, TAIPEI, TAIWAN, R.O.C. The following merchandise was submitted and identified by the vendor as:

More information

79 PKPM2010 /SATWE Midas Civil 7. 80 2 3 K 5-7 2 mm 1 15 32 12 m 2 1 2 3 135 kn / m 24. 3 kn /m 2 ZK 4 1 200 kn /1. 6 m 200 /1. 6 /5. 55 = 22. 52 kn /

79 PKPM2010 /SATWE Midas Civil 7. 80 2 3 K 5-7 2 mm 1 15 32 12 m 2 1 2 3 135 kn / m 24. 3 kn /m 2 ZK 4 1 200 kn /1. 6 m 200 /1. 6 /5. 55 = 22. 52 kn / 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0078 - 04 ( 中 信 建 筑 设 计 研 究 总 院 有 限 公 司, 武 汉 430014) 1 2 U24 A Comparison between Railway Codes and Building

More information

Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial

Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial Public Projects A Thesis Submitted to Department of Construction Engineering National Kaohsiung First University of Science and Technology In Partial Fulfillment of the Requirements For the Degree of Master

More information

P P99

P P99 11 3 2 0 1 8 5 JOURNAL OF CHINA EXECUTIVE LEADERSHIP ACADEMY JINGGANGSHAN VOL. 11 NO. 3 Jul. 25. 2018 100013 C962 A 1674-0599 2018 03-0010 - 14 210 439. 6 1951 1950 2018-02 - 26 1954 3 11 1950 1951 1953

More information

601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999 2010 20082008 2000 197

601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999 2010 20082008 2000 197 BANK OF CHINA LIMITED 3988 2010 8 26 ** ** *** # Alberto TOGNI # # # * # 1 601988 2010 040 113001 2010 8 26 2010 8 12 2010 8 26 15 15 2010 15 0 0 15 0 0 6035 20022007 20012002 19992001 200720081974 1999

More information

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 会 密 切 关 联 的 艺 术, 同 时 也 是 建 设 人 类 生 活 的 构 架, 而 这 一 切

More information

一次辽宁暴雨过程的诊断及风场反演分析

一次辽宁暴雨过程的诊断及风场反演分析 Climate Change Research Letters 气 候 变 化 研 究 快 报, 2013, 2, 139-146 http://dx.doi.org/10.12677/ccrl.2013.24024 Published Online October 2013 (http://www.hanspub.org/journal/ccrl.html) Analysis of the Diagnosis

More information

8 2013 2. 2 3 2 20 8 42m 45m 12 ~ 65m 8 800 400 ~ 400 400 19 20 4 6 19 20 5 12 H800 400 16 25 400 110mm 1. 0m 150 45mm 0. 88 4 5 19 20

8 2013 2. 2 3 2 20 8 42m 45m 12 ~ 65m 8 800 400 ~ 400 400 19 20 4 6 19 20 5 12 H800 400 16 25 400 110mm 1. 0m 150 45mm 0. 88 4 5 19 20 43 14 2013 7 Building Structure Vol. 43 No. 14 Jul. 2013 215021 214. 8m PERFORM-3D 3 TU973 +. 14 A 1002-848X 2013 14-0007-07 Structure design and analysis of Suzhou Modern Media Square Office Zhang JinTan

More information

案例正文:(幼圆、小三、加粗)(全文段前与段后0

案例正文:(幼圆、小三、加粗)(全文段前与段后0 案 例 正 文 : 1 中 国 农 业 银 行 FMIS 系 统 开 发 摘 要 : 本 案 例 描 述 一 家 大 型 商 业 银 行 自 主 开 发 战 略 性 管 理 信 息 系 统 的 过 程 该 系 统 不 仅 规 模 大, 而 且 业 务 类 型 复 杂, 项 目 启 动 时 的 系 统 目 标 具 有 高 度 不 确 定 性 项 目 独 特 之 处 是 业 务 专 家 在 项 目 中

More information