Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 2 Block Plan 座向圖 第二座 E3 E4 E2 E5 E1 Tower 2 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立

Size: px
Start display at page:

Download "Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 2 Block Plan 座向圖 第二座 E3 E4 E2 E5 E1 Tower 2 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立"

Transcription

1 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 1 Block Plan 座向圖 第一座 E3 E4 E5 E2 E1 Tower 1 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Elevation 5 立面圖 5 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 405

2 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 2 Block Plan 座向圖 第二座 E3 E4 E2 E5 E1 Tower 2 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立面圖 4 Elevation 5 立面圖 5 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 406

3 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 3 Block Plan 座向圖 第三座 E3 E2 E4 E1 Tower 3 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 407

4 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 5 Block Plan 座向圖 第五座 E3 E4 E2 E1 Tower 5 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 408

5 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 6 Block Plan 座向圖 第六座 E3 E2 E4 E1 Tower 6 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 409

6 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 7 Block Plan 座向圖 第七座 E3 E4 E2 E1 Tower 7 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 410

7 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 8 Block Plan 座向圖 第八座 E3 E2 E4 E1 Tower 8 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 411

8 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 9 Block Plan 座向圖 第九座 E3 E4 E2 E1 Tower 9 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 412

9 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 10 Block Plan 座向圖 第十座 E3 E4 E2 E1 Tower 10 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 413

10 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 11 Block Plan 座向圖 第十一座 E4 E3 E2 E5 E1 Tower 11 Elevation 1 立面圖 1 Elevation 3 立面圖 3 Elevation 2 立面圖 2 Elevation 4 立面圖 4 Elevation 5 立面圖 5 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 414

11 Elevation Plan 立面圖 THE LAGUNA 滿庭 Tower 12 Block Plan 座向圖 第十二座 E4 E3 E2 E5 E1 Tower 12 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Elevation 5 立面圖 5 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 415

12 Elevation Plan 立面圖 THE TERRACE 名庭 Tower 1 Block Plan 座向圖 第一座 E2 E1 Tower 1 Elevation 1 立面圖 1 THE TERRACE 名庭 Elevation 2 立面圖 2 Tower 2 Block Plan 座向圖 第二座 E2 E1 Tower 2 Elevation 1 立面圖 1 Elevation 2 立面圖 2 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年3月24日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 24th March 2016; and 2. are in general accordance with the outward appearance of the Development. 416

13 Elevation Plan 立面圖 THE TERRACE 名庭 Tower 3 Block Plan 座向圖 第三座 E2 E1 Tower 3 Elevation 1 立面圖 1 THE TERRACE 名庭 Elevation 2 立面圖 2 Tower 5 Block Plan 座向圖 第五座 E2 E1 Tower 5 Elevation 1 立面圖 1 Elevation 2 立面圖 2 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年3月24日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 24th March 2016; and 2. are in general accordance with the outward appearance of the Development. 417

14 Elevation Plan 立面圖 THE TERRACE 名庭 Tower 6 Block Plan 座向圖 第六座 E2 E1 Tower 6 Elevation 1 立面圖 1 THE TERRACE 名庭 Elevation 2 立面圖 2 Tower 7 Block Plan 座向圖 第七座 E2 E1 Tower 7 Elevation 1 立面圖 1 Elevation 2 立面圖 2 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年3月24日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 24th March 2016; and 2. are in general accordance with the outward appearance of the Development. 418

15 Elevation Plan 立面圖 THE TERRACE 名庭 Tower 8&9 Block Plan 座向圖 第八及第九座 E2 E1 Tower 8&9 Elevation 1 立面圖 1 THE TERRACE 名庭 Elevation 2 立面圖 2 Tower 10 Block Plan 座向圖 第十座 E2 E1 Tower 10 Elevation 1 立面圖 1 Elevation 2 立面圖 2 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年3月24日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 24th March 2016; and 2. are in general accordance with the outward appearance of the Development. 419

16 Elevation Plan 立面圖 THE TERRACE 名庭 HOUSE H1-H2 H1 號 -H2 號洋房 Block Plan 座向圖 E2 E3 E4 E1 House H1-H2 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 420

17 Elevation Plan 立面圖 THE TERRACE 名庭 HOUSE H3-H10 H3 號 -H10 號洋房 Block Plan 座向圖 E2 E4 E3 E1 House H3-H10 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 421

18 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H1-H3, H5-H6, H8-H12, H15-H17 H21-H22 Block Plan 座向圖 H1號-H3號 H5號-H6號 H8號-H12號 H15號-H17號 及 H21號-H22號洋房 E1 E3 E4 E2 House H1-H17 & H21-H22 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 422

19 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H7 Block Plan 座向圖 H7號洋房 E1 E3 E4 E2 House H7 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 1. 以2016年9月22日的情況為準的發展項目的經批准的建築圖則 為基礎擬備 及 2. 大致上與發展項目的外觀一致 423

20 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H18-H19 H18 號 -H19 號洋房 Block Plan 座向圖 E1 E4 E2 E3 House H18-H19 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 424

21 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H20 H20 號洋房 Block Plan 座向圖 E1 E4 E2 E3 House H20 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 425

22 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H23, H25-H33 & H35-H38 H23 號 H25 號 -H33 號及 H35 號 -H38 號洋房 Block Plan 座向圖 E3 E2 E4 E1 House H23-H38 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 426

23 Elevation Plan 立面圖 THE HIGHLAND 山庭 HOUSE H39 H39 號洋房 Block Plan 座向圖 E3 E2 E4 E1 House H39 Elevation 1 立面圖 1 Elevation 2 立面圖 2 Elevation 3 立面圖 3 Elevation 4 立面圖 4 Authorized Person for the Development certified that the elevations shown on these plans: 1. are prepared on the basis of the approved building plans for the Development as of 22nd September 2016; and 2. are in general accordance with the outward appearance of the Development. 發展項目的認可人士證明本立面圖所顯示的立面 : 1. 以 2016 年 9 月 22 日的情況為準的發展項目的經批准的建築圖則為基礎擬備 ; 及 2. 大致上與發展項目的外觀一致 427

24 Information on common facilities In The Development 發展項目中的公用設施的資料 Recreational Facilities 康樂設施 Covered 有蓋 Uncovered 無蓋 Total Area 總面積 Residents clubhouse (including any recreational facilities for residents use) 住客會所 ( 包括供住客使用的任何康樂設施 ) sq.ft 平方呎 sq.m. 平方米 32,886 27,888 60,774 3, , , Communal garden or play area for residents use on the roof, or on any floor between the roof and the lowest residential floor, of a building in the development (whether known as a communal sky garden or otherwise) 位於發展項目中的建築物的天台或在天台和最低一層住宅樓層之間的任何一層的 供住客使用的公用花園或遊樂地方 ( 不論是稱為公用空中花園或其他名稱 ) sq.ft 平方呎 sq.m. 平方米 Not Applicable 不適用 Not Applicable 不適用 Not Applicable 不適用 Not Applicable 不適用 Not Applicable 不適用 Not Applicable 不適用 Communal garden or play area for residents use below the lowest residential floor of a building in the development (whether known as a covered and landscaped play area or otherwise) 位於發展項目中的建築物的最低一層住宅樓層以下的 供住客使用的公用花園或遊樂地方 ( 不論是稱為有蓋及園景的遊樂場或有其他名稱 ) sq.ft 平方呎 sq.m. 平方米 1, , Not Applicable 不適用 Not Applicable 不適用 1, , Note: 附註 : Areas in square feet are converted at a rate of 1 square metre to square feet and rounded to the nearest integer. 以平方呎顯示之面積均依據 1 平方米 = 平方呎換算, 並四捨五入至整數 Inspection Of Plans And Deed Of Mutual Covenant 閱覽圖則及公契 1. A copy of each of the Outline Zoning Plans relating to the Development is available at 2. A copy of the latest draft deed of mutual covenant in respect of the specified residential property as at the date on which the specified residential property is offered to be sold is available for inspection free of charge at the place at which the specified residential property is offered to be sold. 1. 備有關於發展項目的每份分區計劃大綱圖的副本供閱覽的網址為 2. 指明住宅物業的公契在將指明住宅物業提供出售的日期的最新擬稿的文本存放於指明住宅物業的售樓處以供免費閱覽 428

25 THE LAGUNA Tower 1 to Tower 3, Tower 5 to Tower Exterior Finishes Item (a) External Wall (b) Window (c) Bay Window (d) Planter (e) Verandah or Balcony (f) Drying Facilities for Clothing 2. Interior Finishes Item (a) Lobby Passenger Lift Lobby (B/F) Entrance Lobby (G/F) Public Lift Lobby (b) Internal Wall and Ceiling (c) Internal Floor Description External wall of tower finished with ceramic tiles, artifical granite tile, curtain wall, glass cladding, natural stone cladding, aluminium cladding, aluminium grill and aluminium architectural feature at major facade. Aluminium window frame finished with fluorocarbon coating. Coloured monolithic glass and coloured insulated glass unit (IGU) for all windows and curtain wall (if provided) in living rooms, dining rooms, living/dining rooms, bedrooms, kitchens, utility and stores. Acid etched glass for window (if provided) in bathrooms and lavatories. N/A N/A (i) Balconies are fitted with glass balustrade with aluminium top rail. Wall: ceramic tiles. Ceiling: external paint, and acoustic ceiling (if applicable). Floor: homogeneous tiles. (ii) Balconies are covered. (iii) There is no verandah. N/A Description Floor finished with natural stone. Wall finished with natural stone, plastic laminated panel, stainless steel panel. Ceiling finished with wood veneered panel. Floor finished with natural stone. Wall finished with natural stone, wood veneered panel, stainless steel panel. Ceiling finished with wood veneered panel, suspended gypsum board ceiling and emulsion paint. Floor finished with reconstituted stone. Wall finished with reconstituted stone and wood veneered panel and stainless steel panel. Ceiling finished with suspended gypsum board ceiling and emulsion paint. Living rooms, dining rooms, living/dining rooms and bedrooms walls and ceilings are painted with emulsion paint to exposed surfaces. Partial areas are equipped with suspended gypsum board false ceiling and bulkhead and painted with emulsion paint. Living rooms, dining rooms, living/dining rooms and bedrooms finished with oak engineered timber flooring with wood veneer skirting. Reconstituted stone border next to glass sliding door and glass swing door.(the following units excepted) For the following units, internal flooring in living rooms, dining rooms, living/dining rooms and bedrooms finished with homogeneous tiles with wood veneer skirting: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 - Unit C on 2/F to 12/F of Tower Interior Finishes Item Description Wall finished with porcelain tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with homogeneous tiles on exposed surface. (The following units excepted) For the following units, wall finished with porcelain tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with porcelain tiles on exposed surface: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 (d) Bathroom - Unit C on 2/F to 12/F of Tower 10 For the following units, wall finished with ceramic tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Master bathroom floor finished with natural stone, bathrooms floor finished with porcelain tiles on exposed surface: - Unit A on 20/F of Tower 1 - Unit A on 20/F of Tower 2 - Unit A and C on 20/F of Tower 3 - Unit A on G/F, Unit A and D on 20/F of Tower 5 - Unit A on G/F, Unit A on 20/F of Tower 6 - Unit A and D on 15/F of Tower 7 - Unit A and E on 15/F of Tower 8 - Unit A on G/F, Unit A and D on 15/F of Tower 9 - Unit A and C on 15/F of Tower 10 - Unit A on 15/F of Tower 11 - Unit A on 15/F of Tower 12 Wall finished with ceramic tiles and glass on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with homogeneous tiles on exposed surface. Cooking bench finished with solid surface material. (The following units excepted) For the following units, wall finished with porcelain tiles exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with porcelain tiles on exposed surface. Cooking bench finished with solid surface material: - Unit A on 20/F of Tower 1 - Unit A on 20/F of Tower 2 - Unit C on 2/F to 19/F, Unit A and C on 20/F of Tower 3 - Unit A on G/F, Unit B and C on 1/F to 19/F, Unit D (e) Kitchen and E on 2/F to 19/F, Unit G and H on 2/F to 20/F, Unit A and D on 20/F of Tower 5 - Unit A on G/F, Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F, Unit A on 20/F of Tower 6 - Unit D on 2/F to 12/F, Unit A and D on 15/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F, Unit A and E on 15/F of Tower 8 - Unit A on G/F, Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F, Unit A and D on 15/F of Tower 9 - Unit C on 2/F to 12/F, Unit A and C on 15/F of Tower 10 - Unit A on 15/F of Tower 11 - Unit A on 15/F of Tower 12 Note : No designation of 4/F, 13/F and 14/F

26 THE LAGUNA Tower 1 to Tower 3, Tower 5 to Tower Interior Fittings Item (a) Doors (b) Bathroom Description Entrance door: solid core fire rated timber door finished with wood veneer panel, fitted with lockset, eye viewer, concealed door closer, door stopper and security door guard (Except the following units). For the following units, entrance door finished with solid core fire rated timber door finished with wood veneer panel, fitted with lockset, eyeviewer, concealed door closer, door stopper and security door chain: - Unit A on 20/F of Tower 1 - Unit A on 20/F of Tower 2 - Unit A and C on 20/F of Tower 3 - Unit A on G/F, Unit A and D on 20/F of Tower 5 - Unit A on G/F and Unit A on 20/F of Tower 6 - Unit A and D on 15/F of Tower 7 - Unit A and E on 15/F of Tower 8 - Unit A on G/F, Unit A and D on 15/F of Tower 9 - Unit A and C on 15/F of Tower 10 - Unit A on 15/F of Tower 11 - Unit A on 15/F of Tower 12 Bedroom door, Store door and Utility door: hollow core timber door finished with wood veneer panel, fitted with lockset and door stopper. Bathroom door: hollow core timber door finished with wood veneer panel, fitted with lockset and door stopper. Bathroom door fitted with louver (for bathroom without window only). Kitchen door: solid core fire rated timber door finished with wood veneer panel, fitted with lockset, door closer, door stopper and fire-rated vision panel. Garden Door and Store door (at Flat Roof): Metal door fitted with lockset. Door to Flat Roof, Roof, Balcony, Utility Platform and Garden: Glass door with aluminium door frame, fitted with lockset. Lavatory Door: Aluminium sliding folding door, fitted with lockset. Fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enameled steel bathtub 1600(L)x700(W)x420(D)mm), chrome plated bath mixer, chrome plated shower set, chrome plated robe hook, chrome plated towel rail, chrome plated paper holder. Copper water pipes with thermal insulation are used for both cold water and hot water supply. (The following units excepted) For the bathroom 1 of the following units, fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, shower cubicle, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit B on 1/F to 19/F of Tower 2 - Unit E on 15/F of Tower 8 - Unit B on 1/F to 12/F of Tower 11 - Unit B on G/F of Tower Interior Fittings Item Description For the master bathroom of the following units, fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L) x700(w)x420(d)mm), chrome plated bath mixer, shower cubicle, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit B on G/F of Tower 2 - Unit A on G/F of Tower 7 - Unit B on G/F of Tower 11 For the master bathroom of the following units, fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L)x700(W)x420(D)mm), chrome plated bath mixer, chrome plated bath spout, shower cubicle, chrome plated overhead rain shower and shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit A on 20/F of Tower 1 (b) Bathroom - Unit A on 20/F of Tower 2 - Unit A on 20/F of Tower 3 - Unit A and D on 20/F of Tower 5 - Unit A on G/F and Unit A on 20/F of Tower 6 - Unit A and D on 15/F of Tower 7 - Unit A on 15/F of Tower 8 - Unit A on G/F and Unit A on 15/F of Tower 9 For the master bathroom of the following units, fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L)x700(W)x420(D)mm), chrome plated bath mixer, chrome plated bath spout, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit C on 20/F of Tower 3 - Unit A on G/F of Tower 5 - Unit E on 15/F of Tower 8 - Unit D on 15/F of Tower 9 - Unit C on 15/F of Tower 10 - Unit A on 15/F of Tower 12 For appliances and their brand names and model numbers, please refer to Appliances Schedule. Note : No designation of 4/F, 13/F and 14/F 430

27 THE LAGUNA Tower 1 to Tower 3, Tower 5 to Tower Interior Fittings 3. Interior Fittings Item Description Fitted with wooden kitchen cabinet of plastic laminated panel, high gloss lacquer panel, melamine faced chipboard and solid surface material countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. (The following units excepted) For the following units, fitted with wooden kitchen cabinet of plastic laminated panel, high gloss lacquer panel and solid surface material countertop, stainless steel sink with chrome plated sink mixer. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 (c) Kitchen - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 - Unit C on 2/F to 12/F of Tower 10 For the following units, fitted with wooden kitchen cabinet of melamine faced chipboard, high gloss lacquer panel and solid surface material countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit A on 20/F of Tower 1 - Unit A on 20/F of Tower 2 - Unit A and C on 20/F of Tower 3 - Unit A on G/F, Unit A and D on 20/F of Tower 5 - Unit A on G/F, Unit A on 20/F of Tower 6 - Unit A and D on 15/F of Tower 7 - Unit A and E on 15/F of Tower 8 - Unit A on G/F, Unit A and D on 15/F of Tower 9 - Unit A and C on 15/F of Tower 10 - Unit A on 15/F of Tower 11 - Unit A on 15/F of Tower 12 For appliances and their brand names and model numbers, please refer to Appliances Schedule. Note : No designation of 4/F, 13/F and 14/F Item (d) Bedroom (e) Telephone (f) Aerials (g) Electrical Installations (h) Gas Supply Description N/A Telephone connection points are installed for living rooms, dining rooms, living/dining room and bedroom. For location and number of connection points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. TV/FM outlets for local TV/FM radio programs are installed for living rooms, dining rooms, living/ dining room and bedroom. For location and number of connection points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Concealed conduit wiring for lighting and power points are installed. Single phase electricity supply with miniature circuit breaker distribution board is provided. (The following units excepted) For the following units, three phase electricity supply with miniature circuit breaker distribution board is provided: - Unit A on 20/F of Tower 1 - Unit A on 20/F of Tower 2 - Unit C on 2/F to 19/F, Unit A and C on 20/F of Tower 3 - Unit A on G/F, Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F, Unit A and D on 20/F of Tower 5 - Unit A on G/F, Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F, Unit A on 20/F of Tower 6 - Unit D on 2/F to 12/F, Unit A and D on 15/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F, Unit A and E on 15/F of Tower 8 - Unit A on G/F, Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F, Unit A and D on 15/F of Tower 9 - Unit C on 2/F to 12/F, Unit A and C on 15/F of Tower 10 - Unit A on 15/F of Tower 11 - Unit A on 15/F of Tower 12 For location and number of power points and airconditioner points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Towngas supply pipes are provided and connected to gas cooking hob and gas water heater. (The followings units excepted.) For the following units, no towngas supply is provided: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 - Unit C on 2/F to 12/F of Tower 10 For the location of towngas supply point, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. 431

28 THE LAGUNA Tower 1 to Tower 3, Tower 5 to Tower Interior Fittings Item (i) Washing Machine Connection Point (j) Water Supply 4. Miscellaneous Item (a) Lifts (b) Letter Box (c) Refuse Collection Description Water point of a design of 15mm in diameter and drain point of a design of 40mm in diameter for washing machine are located in kitchens. For location of connection points for washing machine, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Copper water pipes with thermal insulation are used for both cold water and hot water supply. Copper water pipes are concealed in non-structural wall and enclosed in false ceilings, bulkheads and cabinets. Hot water supply to kitchen and bathroom is provided by gas water heater. (The following units excepted) For the following units, hot water supply to kitchen and bathroom are provided by electric water heater: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 - Unit C on 2/F to 12/F of Tower 10 For the following units, hot water supply to kitchen and bathroom are provided by gas and electric water heater: - Unit A on 20/F of Tower 5 - Unit A on G/F, Unit A on 20/F of Tower 6 - Unit A and D on 15/F of Tower 7 - Unit E on 15/F of Tower 8 - Unit A on G/F, Unit A and D on 15/F of Tower 9 For location of gas and electrical water heaters, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Description Residential Tower Lifts: Two Mitsubushi lifts (model no. Nexway-S) are provided for each tower serving B/F to 20/F for Tower 1 to Tower 6 and B/F to 15/F for Tower 7 to Tower 12. Stainless steel letter box is provided for each residential unit at G/F entrance lobby of each tower. Refuse storage and material recovery room is provided in the common area on each residential floor of towers. Refuse will be centrally handled in refuse storage and material recovery chamber on B/F. Note : No designation of 4/F, 13/F and 14/F 4. Miscellaneous Item (d) Water Meter, Electricity Meter and Gas Meter 5. Security Facilities Description Separate water meter for individual residential unit is provided at water meters cabinet at residential floor of towers. Separate electricity meter for individual residential unit is provided at electrical meter cabinet and electrical meter room at residential floor of towers. Separate gas meter for individual residential unit is provided in the kitchen of individual residential unit. (The following units excepted) For the following units, gas meter is provided on the roof floor: - Unit A on 20/F of Tower 1 and Tower 3 - Unit D on 20/F of Tower 5 - Unit A on 15/F of Tower 7, Tower 9 and Tower 10 - Unit E on 15/F of Tower 8 For the following units, no gas meter is provided: - Unit C on 2/F to 19/F of Tower 3 - Unit B and C on 1/F to 19/F, Unit D and E on 2/F to 19/F, Unit G and H on 2/F to 20/F of Tower 5 - Unit B and C on 1/F to 19/F, Unit E, F, G and H on 2/F to 20/F of Tower 6 - Unit D on 2/F to 12/F of Tower 7 - Unit B on 1/F to 12/F, Unit E and F on 2/F to 12/F of Tower 8 - Unit B and C on 1/F to 12/F, Unit F and G on 2/F to 15/F of Tower 9 - Unit C on 2/F to 12/F of Tower 10 CCTV cameras are provided at passenger lift lobby (B/F), entrance lobby (G/F), car park, driveway and lift cars. Video door phone with panic alarm button is provided at the living rooms, dining rooms and living/dining room for each residential unit. Proximity card access system is provided at passenger lift lobby (B/F) and entrance lobby (G/F). For location of glass break sensors, door/window contacts, Passive Infrared Sensor (PIR sensors), visitor panel and video door phone with panic alarm button, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. 6. Appliances For provision and brand name of appliances, please refer to the Appliance Schedule. The vendor undertakes that if lifts or appliances of the specified brand name or model number are not installed, lifts or appliances of comparable quality will be installed. 432

29 THE TERRACE Tower 1 to Tower 3, Tower 5 to Tower Exterior Finishes Item (a) External Wall (b) Window (c) Bay Window (d) Planter (e) Verandah or Balcony (f) Drying Facilities for Clothing 2. Interior Finishes Item (a) Lobby Passenger Lift Lobby (B/F) Entrance Lobby (1/F for Tower 1 and Tower 2, G/F for Tower 3, Tower 5 to Tower 10) Private Lift Lobby Passenger Lift Lobby Description External wall of tower finished with ceramic tiles, artifical granite tile, curtain wall, natural stone cladding, aluminium cladding, aluminium grill and aluminium architectural feature at major facade. Aluminium window frame finished with fluorocarbon coating. Coloured monolithic glass and coloured insulated glass unit (IGU) for all windows and curtain wall (if provided) in living rooms, dining rooms, bedrooms and utilities. (The following units excepted) For the following units, acid etched glass for window in dining rooms. - Unit A and B on 2/F of Tower 1 and Tower 2 - Unit A and B on 1/F of Tower 3, Tower 5 to Tower 10 Acid etched glass for window (if provided) in bathrooms and lavatories. N/A N/A (i) Balconies are fitted with glass balustrade with aluminium top rail. Wall: ceramic tiles. Ceiling: external paint. Floor: homogeneous tiles. (ii) Balconies are covered. (iii) There is no verandah. N/A Description Floor finished with natural stone. Wall finished with natural stone, plastic laminated panel, stainless steel panel. Ceiling finished with plastic laminated panel. Floor finished with natural stone. Wall finished with natural stone, wood veneered panel, aluminium and stainless steel panel. Ceiling finished with wood veneered panel, aluminium and stainless steel panel. Floor finished with reconstituted stone. Wall finished with porcelain tiles, wood veneered panel, plastic laminated panel and stainless steel panel. Ceiling finished with suspended gypsum board ceiling and emulsion paint. (The following units excepted) For the following units, floor finished with natural stone. Wall finished with wood veneered panel, stainless steel panel and natural stone. Ceiling finished with suspended gypsum board ceiling and emulsion paint: - Unit B on 1/F of Tower 1 - Unit A on 1/F of Tower 2 - Unit B on G/F of Tower 3 - Unit A on G/F of Tower 5 to Tower 10 Floor finished with homogeneous tiles. Wall finished with ceramic tiles. Ceiling finished with suspended gypsum board ceiling and emulsion paint. 2. Interior Finishes Item (b) Internal Wall and Ceiling (c) Internal Floor (d) Bathroom (e) Kitchen 3. Interior Fittings Item (a) Doors Description Living rooms, dining rooms and bedrooms walls and ceiling are painted with emulsion paint to exposed surfaces. Partial areas are equipped with suspended gypsum board false ceiling and bulkhead and painted with emulsion paint. Living rooms, dining rooms and bedrooms finished with oak engineered timber flooring with wood veneer skirting. Reconstituted stone border next to glass sliding door and glass swing door. Wall finished with ceramic tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with porcelain tiles on exposed surface. (The following units excepted) For the master bathroom of the following units, wall finished with ceramic tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with natural stone on exposed surface. - Unit A and B on 7/F of Tower 1 - Unit A and B on 7/F of Tower 2 - Unit A and B on 7/F of Tower 3 - Unit A and B on 7/F of Tower 5 - Unit A on 7/F of Tower 6 - Unit A on 7/F of Tower 7 - Unit A on 7/F of Tower 8 - Unit A on 7/F of Tower 9 - Unit A on 7/F of Tower 10 Wall finished with ceramic tiles on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with porcelain tiles on exposed surface. Cooking bench finished with solid surface material. (The following units excepted) For the following units, wall finished with reconstituted stone up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with natural stone on exposed surface. Cooking bench finished with reconstituted stone: - Unit A on 7/F of Tower 6 - Unit A on 7/F of Tower 7 - Unit A on 7/F of Tower 8 - Unit A on 7/F of Tower 9 - Unit A on 7/F of Tower 10 Description Entrance door: solid core fire rated timber door finished with wood veneer panel, fitted with lockset, eye viewer, concealed door closer, door stopper and security door chain. Bedroom door and Utility door: hollow core timber door finished with wood veneer panel, fitted with lockset and door stopper. Bathroom door: hollow core timber door finished with wood veneer panel, fitted with lockset and door stopper. Bathroom door fitted with louver (for bathroom without window only). Kitchen door: solid core fire rated timber door finished with wood veneer panel, fitted with lockset, door closer, door stopper and fire-rated vision panel. Garden Door: metal door fitted with lockset. Doors to Flat Roof, Roof, Balcony, Utility Platform and Garden: glass door with aluminium door frame, fitted with lockset. 433

30 THE TERRACE Tower 1 to Tower 3, Tower 5 to Tower Interior Fittings 3. Interior Fittings Item Description Lavatory door: aluminium sliding folding door, fitted with lockset. Door between Private lift lobby and Public Lift Lobby: solid core fire rated timber door finished with plastic laminate, fitted with lockset, eye viewer, door closer, door stopper and security door chain. Door between Kitchen and Public Lift Lobby: solid core fire rated timber door finished with wood veneer panel, fitted with lockset, eye viewer, door closer, door stopper and security door guard. Master bathroom: Fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L)x700(W)x420(D)mm), chrome plated bath mixer, chrome plated bath spout, shower cubicle, chrome plated overhead rain shower and shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. Bathroom 1 and Bathroom 2: Fitted with solid surface material countertop. Sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L)x700(W)x420(D) mm), chrome plated bath mixer, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. For appliances and their brand names and model numbers, please refer to Appliances Schedule. Fitted with wooden kitchen cabinet of plastic laminated panel, high gloss lacquer panel and solid surface material countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan and air-conditioning unit are provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply.(the following unit excepted) For the following units, fitted with wooden kitchen cabinet of melamine faced chipboard, high gloss lacquer panel and solid surface material countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan and air-conditioning unit are provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit A and B on 7/F of Tower 1 - Unit A and B on 7/F of Tower 2 - Unit A and B on 7/F of Tower 3 - Unit A and B on 7/F of Tower 5 Item Description For the following units, fitted with wooden kitchen cabinet of melamine faced chipboard, wood veneer panel, high gloss lacquer panel and reconstituted stone countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan and air-conditioning unit are provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply: - Unit A on 7/F of Tower 6 - Unit A on 7/F of Tower 7 - Unit A on 7/F of Tower 8 - Unit A on 7/F of Tower 9 - Unit A on 7/F of Tower 10 For appliances and their brand names and model numbers, please refer to Appliances Schedule. N/A Telephone connection points are installed for living rooms, dining rooms and bedroom. For location and number of connection points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. TV/FM outlets for local TV/FM radio programs are installed for living rooms, dining rooms and bedroom. TV/FM outlets for local TV/FM radio programs are installed for living/dining room and bedroom. Concealed conduit wiring for lighting and power points are installed. Three phase electricity supply with miniature circuit breaker distribution board is provided. For location and number of power points and air-conditioner points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Towngas supply pipes are provided and connected to gas cooking hob and gas water heaters. For the location of towngas supply point, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Water point of a design of 15mm in diameter and drain point of a design of 40mm in diameter for washing machine in kitchens. (The following units excepted) For the following units, water point of a design of 15mm in diameter and drain point of a design of 40mm in diameter for washing machine are located in utilities: - Unit A on 7/F of Tower 6 - Unit A on 7/F of Tower 7 - Unit A on 7/F of Tower 8 - Unit A on 7/F of Tower 9 - Unit A on 7/F of Tower 10 For location of connection points for washing machine, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Copper water pipes with thermal insulation are used for both cold water and hot water supply. Copper water pipes are concealed in non-structural wall and enclosed in false ceilings, bulkheads and cabinets. Hot water supply to kitchen and bathroom is provided by gas water heaters. For location of water heaters, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. (a) Doors (b) Bathroom (c) Kitchen (c) Kitchen (d) Bedroom (e) Telephone (f) Aerials (g) Electrical Installations (h) Gas Supply (i) Washing Machine Connection Point (j) Water Supply 434

31 THE TERRACE Tower 1 to Tower 3, Tower 5 to Tower Miscellaneous Item (a) Lifts (b) Letter Box (c) Refuse Collection (d) Water Meter, Electricity Meter and Gas Meter 5. Security Facilities Description Residential Tower Lifts: Two Mitsubushi lift (model no. Nexway-S and Nexiez-MR) are provided for each tower serving B/F to 7/F (No designation of 4/F). Stainless steel letter box is provided for each residential unit at the entrance lobby of each tower. Refuse storage and material recovery room is provided in the common area on each residential floor of towers. Refuse will be centrally handled in refuse storage and material recovery chamber on B/F. Separate water meter for individual residential unit is provided in water meter cabinet at B/F of towers. Separate electricity meter for individual residential unit is provided at electric meter cabinet and electric meter room at residential floor of towers. Seperate gas meter for individual residential unit is provided in A/C plant room of each residential unit. (The following unit excepted) For the following units, seperate gas meter is provided in kitchen of individual residential unit: - Unit A and B on G/F, 1/F and 2/F of Tower 1 - Unit A and B on G/F, 1/F and 2/F of Tower 2 - Unit A and B on G/F and 1/F of Tower 3 - Unit A and B on G/F and 1/F of Tower 5 - Unit A and B on G/F and 1/F of Tower 6 - Unit A and B on G/F and 1/F of Tower 7 - Unit A and B on G/F and 1/F of Tower 8 - Unit A and B on G/F and 1/F of Tower 9 - Unit A and B on G/F and 1/F of Tower 10 CCTV cameras are provided at passenger lift lobby (B/F), entrance lobby (1/F for Tower 1 and Tower 2, G/F for Tower 3, Tower 5 to Tower 10), car park, driveway and lift cars. Video door phone with panic alarm button is provided for each residential unit. Proximity card access system is provided at passenger lift lobby (B/F) and entrance lobby (1/F for Tower 1 and Tower 2, G/F for Tower 3, Tower 5 to Tower 10). For the following units, glass break sensors, door/window contacts and Passive Infrared Sensor (PIR sensors) are provided: - Unit A and B on G/F of Tower 1 - Unit A and B on G/F of Tower 2 - Unit A and B on G/F of Tower 3 - Unit A and B on G/F of Tower 5 - Unit A and B on G/F of Tower 6 - Unit A and B on G/F of Tower 7 - Unit A and B on G/F of Tower 8 - Unit A and B on G/F of Tower 9 - Unit A and B on G/F of Tower 10 For the following units, Passive Infrared Sensor (PIR sensors) are provided: - Unit A and B on 1/F of Tower 1 - Unit A and B on 1/F of Tower 2 For location of glass break sensors, door/window contacts, Passive Infrared Sensor (PIR sensors), visitor panel and video door phone with panic alarm button, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. THE TERRACE House H1-H3, H5-H10 THE HIGHLAND House H1-H3, H5-H12, H15-H23, H25-H33, H35-H39 1. Exterior Finishes Item (a) External Wall (b) Window (c) Bay Window (d) Planter (e) Verandah or Balcony (f) Drying Facilities for Clothing 2. Interior Finishes Description Finished with tiles, aluminium cladding, aluminium grille, aluminium architectural feature, glass cladding and natural stone cladding. Aluminium window frame finished with fluorocarbon coating. The Terrace Houses: Coloured monolithic glass and coloured insulated glass unit (IGU) for windows (if provided) in living rooms, dining rooms, bedrooms and kitchens. The Highland Houses: Coloured monolithic glass for all windows (if provided) in living rooms, dining rooms, bedrooms, kitchens and family room (if provided). Acid etched tinted glass for window (if provided) in bathrooms and lavatories. N/A Finished with homogeneous tiles. (i) Balconies are fitted with glass balustrade with aluminium top rail. Floor: porcelain tiles. Ceiling: aluminium cladding. (ii) Balconies are covered. (iii) There is no verandah. N/A Item Description (a) Lobby Shuttle lift Floor are finished with natural stone. Wall are lobby finished with natural stone, stainless steel panel (LG1/F - LG2/F, and wood veneer panel. Ceiling finished with The Highland) wood veneered panel. (b) Internal Wall and Ceiling (c) Internal Floor (d) Bathroom (e) Kitchen Living rooms, dining rooms and bedrooms walls and ceilings are painted with emulsion paint to exposed surfaces. Partial areas are equipped with suspended gypsum board false ceiling and bulkhead and painted with emulsion paint. Living rooms, dining rooms and bedrooms finished with oak engineered timber flooring with wood veneer skirting. Reconstituted stone next to glass sliding door and glass swing door. Wall finished with natural stone on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with natural stone on exposed surface. Wall finished with reconstituted stone on exposed surface and up to false ceiling level. Suspended gypsum board ceiling with emulsion paint. Floor finished with natural stone on exposed surface. Cooking bench finished with reconstituted stone. 6. Appliances For provision and brand name of appliances, please refer to the Appliance Schedule. The vendor undertakes that if lifts or appliances of the specified brand name or model number are not installed, lifts or appliances of comparable quality will be installed. 435

32 THE TERRACE House H1-H3, H5-H10 THE HIGHLAND House H1-H3, H5-H12, H15-H23, H25-H33, H35-H39 3. Interior Fittings 3. Interior Fittings Item Description Entrance door: Inner door - Timber veneered solid core timber door, fitted with lockset, eye viewer, concealed door closer, security door chain and door stopper. Outer door - Glass door with aluminium frame is provided, fitted with handle and lockset. Bedroom door and doors leading to both bedroom 3 and bathroom 3: Timber veneered hollow core timber door, fitted with lockset and door stopper. Bathroom door and powder room door: Timber veneered hollow core timber door, fitted with lockset and door stopper. Bathroom door and powder room door, fitted with louver (for bathroom and powder room without window only). Kitchen door: Timber veneered solid core fire rated timber door, fitted with lockset, door closer, door stopper and fire-rated vision panel. Store door and utility door : Timber veneered hollow core timber door, fitted with lockset and door stopper. Lavatory door: Aluminium sliding folding door, fitted with lockset. Internal staircase door (LG1/F, The Highland and B/F, The Terrace): Timber veneered solid core fire rated timber door, fitted with lockset, door closer and door stopper. Carpark door (LG1/F, The Highland and B/F, The Terrace): Plastic laminated finish solid core fire rated timber door, fitted with lockset, eye viewer, concealed door closer, security door guard and door stopper. Doors to Flat Roof, Roof, Balcony, Utility Platform and Garden: Glass door with aluminium door frame, fitted with lockset. A/C plant room door: Plastic laminated finish solid core fire rated timber door, fitted with lockset and door stopper. Door to Pipe duct (LG1/F, The Highland): Tile door with G.M.S. angle frame support fitted with lockset. Garden Door: Metal door fitted with lockset. Master bathroom: fitted with natural stone countertop and sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1800(L)x800(W)x420(D)mm), chrome plated bath mixer, chrome plated bath spout, shower cubicle, chrome plated overhead rain shower and shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. Bathroom 1, Bathroom 2 and Bathroom 3: fitted with natural stone countertop and sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, enamelled steel bathtub (1600(L)x700(W) x420(d)mm), chrome plated bath mixer, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. The above except Bathroom 3 of House H3, The Terrace. Bathroom 3 of House H3, The Terrace: fitted with natural stone countertop and sanitary wares and fittings include vitreous china toilet bowl, vitreous china wash basin, chrome plated basin mixer, shower cubicle, chrome plated shower set, chrome plated robe hook, chrome plated towel rail and chrome plated paper holder. Exhaust fan is provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. For appliances and their brand names and model numbers, please refer to Appliances Schedule. Item Description Fitted with wooden kitchen cabinet of high gloss lacquer panel, timber veneer panel and reconstituted stone countertop, stainless steel sink with chrome plated sink mixer. Exhaust fan and air-conditioning unit are provided. Copper water pipes with thermal insulation are used for both cold water and hot water supply. For appliances and their brand names and model numbers, please refer to Appliances Schedule. N/A Telephone connection points are installed for living rooms, dining rooms, bedroom and family room. For location and number of connection points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. TV/FM outlets for local TV/FM radio programs are installed for living rooms, dining rooms, bedroom and family room. For location and number of connection points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Concealed conduit wiring for lighting and power points are installed. Three phase electricity supply with miniature circuit breaker distribution board is provided. For location and number of power points and air-conditioner points, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Towngas supply pipes are provided and connected to gas cooking hob and gas water heater. For the location of towngas supply point, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Water point of a design of 15mm diameter and drain point of a design of 40mm in diameter for washing machine in utilities. For location of connection points for washing machine, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. Copper water pipes with thermal insulation are used for both cold water and hot water supply. Copper water pipes are concealed in walls and enclosed in false ceilings and bulkheads and cabinets. Hot water supply to kitchen and bathroom is provided by gas water heaters. For the following Houses, hot water supply to Lavatory is provided by electric water heater: The Terrace: House H1 to House H3, House H5 to House H10 The Highland: House H18 to House H20. For the following Houses, hot water supply to Bathroom 3 and Lavatory is provided by electric water heater: The Highland: House H1 to House H3, House H5 to House H12, House H15 to House H17 and House H21 to House H22. For location of water heaters, please refer to Schedule of Mechanical and Electrical Provisions of Residential Units. (a) Doors (b) Bathroom (c) Kitchen (d) Bedroom (e) Telephone (f) Aerials (g) Electrical Installations (h) Gas Supply (i) Washing Machine Connection Point (j) Water Supply 436

A/C PLATFORM = AIR-CONDITIONING PLATFORM = A.D. = AIR DUCT = BALCONY ABOVE = BATH = BATHROOM = BEDROOM = B.W. = BAY WINDOW = B.W. ABOVE = BAY

A/C PLATFORM = AIR-CONDITIONING PLATFORM = A.D. = AIR DUCT = BALCONY ABOVE = BATH = BATHROOM = BEDROOM = B.W. = BAY WINDOW = B.W. ABOVE = BAY FLOOR PLANS OF RESIDENTIAL PROPERTIES IN THE DEVELOPMENT 發展項目的住宅物業的樓面平面圖 6/F Floor Plan 6樓單位平面圖 Note : For the as-built foyer window, the interior sides of the uneven structural 附註 上圖顯示位於前廊窗口的結構牆身內側 的凹處已作裝飾性填平

More information

The floor-to-floor height of each residential property on the 5th 12th, 15th 23rd, 25th & 26th Floor is 3.040m. The internal areas of the residential

The floor-to-floor height of each residential property on the 5th 12th, 15th 23rd, 25th & 26th Floor is 3.040m. The internal areas of the residential FLAT ROOF = 平台 U.P. ABOVE = Utility Platform Above 上層工作平台覆蓋部分 The floor-to-floor height of each residential property on the 3rd Floor is 3.040m. The internal areas of the residential properties on the

More information

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor

68 2012 11 the requirements of load - bearing rescue and turning of the large fire engine can be served as an outdoor safety area. 5 The second floor 2012 11 11 170 JOURNAL OF RAILWAY ENGINEERING SOCIETY Nov 2012 NO. 11 Ser. 170 1006-2106 2012 11-0067 - 06 1 2 ( 1. 苏 州 设 计 研 究 院 股 份 有 限 公 司, 江 苏 苏 州 215021; 2. 苏 州 市 消 防 支 队, 江 苏 苏 州 215021) 1 2 3 4

More information

物 業 設 計 Property esign Name of the evelopment Lions Rise rchitect & uthorized Person Mr. Ma Kim See of ML rchitects (HK) Limited Postal ddress 8 Muk L

物 業 設 計 Property esign Name of the evelopment Lions Rise rchitect & uthorized Person Mr. Ma Kim See of ML rchitects (HK) Limited Postal ddress 8 Muk L 發 展 項 目 基 本 資 料 SI INFORMION OF HE EVELOPMEN 發 展 項 目 基 本 資 料 發 展 項 目 名 稱 現 崇 山 郵 寄 地 址 九 龍 黃 大 仙 睦 鄰 街 8 號 地 段 編 號 新 九 龍 內 地 段 第 6309 號 土 地 面 積 約 9,502 平 方 米 每 年 地 租 按 每 年 當 其 時 應 課 差 餉 租 值 百 分 之 三 用 途

More information

现代酒店家具设计与鉴赏.indd

现代酒店家具设计与鉴赏.indd 现 代 酒 店 家 具 设 计 与 鉴 赏.indd 8-9 01 序 言 家 具 承 载 着 社 会, 承 载 着 传 统, 承 载 着 技 术 艺 术 生 活, 家 具 是 一 种 典 型 的 物 质 文 明 成 果, 更 是 一 种 特 殊 的 文 化 形 态 家 具 虽 然 都 是 与 人 们 的 生 活 相 伴 相 随, 但 它 出 现 在 不 同 的 场 合 时, 如 居 家 办 公 城

More information

公共租赁住房建设与评价标准_征求意见稿2015-10-28.doc

公共租赁住房建设与评价标准_征求意见稿2015-10-28.doc UG 北 京 市 地 方 标 准 DB 编 号 :DB 11/X X X X-201X 备 案 号 :J -201 公 共 租 赁 住 房 建 设 与 评 价 标 准 Standard for Public Rental Housing Construction and Performance Assessment ( 征 求 意 见 稿 ) 201 - - 发 布 201 - - 实 施 北 京

More information

A68b v13 PFL0116 066 CO

A68b v13 PFL0116 066 CO 火 險 保 單 請 詳 細 參 閱 本 保 單 閣 下 有 權 改 變 主 意 15 行 使 取 消 保 單 權 益 須 遵 守 以 下 規 定 : 15 (852) 2867 8678 安 盛 保 險 有 限 公 司 90918 (852) 2867 8678 收 集 個 人 資 料 的 聲 明 本 公 司 486 條 例 目 的 : 有 關 目 的 1. 安 盛 關 聯 方 在 直 接 促 銷

More information

School Library 263

School Library 263 LIBRARY OF CONGRESS PACKARD CAMPUS FOR AUDIO-VISUAL CONSERVATION 国 会 帕 卡 德 校 园 视 听 保 护 图 书 馆 设 计 公 司 Design company: BAR Architects (Consulting Design Architect) 地 点 Location:Culpeper, Virginia, USA 面

More information

( CIP ) /. :, ISBN D CIP ( 2004 ) ( ) ( 010 ) ( ) ( ) ( 010 )

( CIP ) /. :, ISBN D CIP ( 2004 ) ( ) ( 010 ) ( ) ( ) ( 010 ) ( CIP ) /. :, 2004. 4 ISBN 7-80161 - 711-8... - - -. D923. 405 CIP ( 2004 ) 005811 9 ( 100101 ) ( 010 ) 65290566 ( ) 65290516 ( ) ( 010 ) 65290558 65290556 ( ) www. courtpress. com E - mail cour tpress@sohu.

More information

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社

122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 122 Projects Domus China 104 December 2015 建 筑 并 不 属 于 个 人 / ARCHITECTURE DOES NOT BELONG TO INDIVIDUALS 法 国 AS 建 筑 工 作 室 将 建 筑 和 城 市 规 划 定 义 为 : 与 社 会 密 切 关 联 的 艺 术, 同 时 也 是 建 设 人 类 生 活 的 构 架, 而 这 一 切

More information

Microsoft Word - (web)_F.1_Notes_&_Application_Form(Chi)(non-SPCCPS)_16-17.doc

Microsoft Word - (web)_F.1_Notes_&_Application_Form(Chi)(non-SPCCPS)_16-17.doc 聖 保 羅 男 女 中 學 學 年 中 一 入 學 申 請 申 請 須 知 申 請 程 序 : 請 將 下 列 文 件 交 回 本 校 ( 麥 當 勞 道 33 號 ( 請 以 A4 紙 張 雙 面 影 印, 並 用 魚 尾 夾 夾 起 : 填 妥 申 請 表 並 貼 上 近 照 小 學 五 年 級 上 下 學 期 成 績 表 影 印 本 課 外 活 動 表 現 及 服 務 的 證 明 文 件 及

More information

林绍宽

林绍宽 福 建 省 工 程 建 设 地 方 标 准 工 程 建 设 地 方 标 准 编 号 : DBJ/T13-187-2014 住 房 和 城 乡 建 设 部 备 案 号 : J 1 2 6 3 3-2 0 1 4 住 宅 区 和 住 宅 建 筑 内 有 线 广 播 电 视 设 施 工 程 设 计 施 工 和 验 收 规 程 Specification for design,installation and

More information

--------------------------------------------------------------------------------------------- --------------------------------------------------------

--------------------------------------------------------------------------------------------- -------------------------------------------------------- http://210.69.121.61/bulletin/ Index.asp ------------------------------------------------------------------------------------------------------------ ---------------------------------------------------------------------------------------------------

More information

Microsoft Word - J. 被印材料-台.doc

Microsoft Word - J. 被印材料-台.doc J1 被 印 材 料 J1 Q: 何 谓 被 印 材 料 (material to be printed)? A: 能 接 受 油 墨 并 能 表 现 出 复 制 印 纹 的 任 何 物 体, 例 如 : 纸 张 纸 板 铁 皮 塑 料 皮 木 板 等 J1.1 Q: 被 印 材 料 分 几 大 类? A:1. 非 金 属 ;2. 金 属 类 共 两 大 类 J1.2 Q: 何 谓 非 金 属 材

More information

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行

通 过 厂 变 带 电, 这 种 设 计 减 少 了 机 组 自 带 厂 用 电 负 荷 能 力, 降 低 了 锅 炉 满 足 FCB 时 最 低 稳 燃 工 况, 同 时 造 成 燃 烧 调 整 量 加 大 本 电 厂 在 FCB 试 验 时, 电 泵 不 联 启, 始 终 保 持 汽 泵 运 行 火 电 机 组 小 岛 运 行 工 况 分 析 刘 伟 东 方 电 气 股 份 有 限 公 司, 成 都 610036 摘 要 : 目 前 执 行 的 对 外 火 电 工 程 合 同 中, 不 管 装 机 大 小, 大 部 分 都 要 求 机 组 验 收 时 完 成 小 岛 运 行 试 验 ( 即 FCB 或 House load operation), 并 作 为 重 要 的 验 收 条 件 基

More information

CHINESE $WaP Vincent booklet

CHINESE $WaP Vincent booklet ELECTRICITY, GAS and WATER How to save money and help the environment 电, 天 然 气 和 水 如 何 省 钱 和 帮 助 改 善 环 境 CONTENTS Reach for the Stars Saving Energy Hot Water Heating & Cooling Refrigeration Lighting Cooking

More information

Collection of 2012 Examination Certificates

Collection of 2012 Examination Certificates 本 局 檔 號 領 取 香 港 年 考 度 試 及 評 通 核 告 局 請 各 與 考 學 校 委 派 職 員 中 學 文 憑 年 考 試 月 / 高 級 日 第 程 四 度 號 會 月 考 證 書 附 外 ), 夾 的 於 領 辦 取 公 單 時 到 間 本 ( 局 星 辦 期 事 一 處 ( 至 地 五 址 :: 上 香 港 )/ 灣 時 香 仔 港 軒 高 分 尼 級 至 詩 程 下 道 度

More information

1. 請 先 檢 查 包 裝 內 容 物 AC750 多 模 式 無 線 分 享 器 安 裝 指 南 安 裝 指 南 CD 光 碟 BR-6208AC 電 源 供 應 器 網 路 線 2. 將 設 備 接 上 電 源, 即 可 使 用 智 慧 型 無 線 裝 置 進 行 設 定 A. 接 上 電 源

1. 請 先 檢 查 包 裝 內 容 物 AC750 多 模 式 無 線 分 享 器 安 裝 指 南 安 裝 指 南 CD 光 碟 BR-6208AC 電 源 供 應 器 網 路 線 2. 將 設 備 接 上 電 源, 即 可 使 用 智 慧 型 無 線 裝 置 進 行 設 定 A. 接 上 電 源 1. 請 先 檢 查 包 裝 內 容 物 AC750 多 模 式 無 線 分 享 器 安 裝 指 南 安 裝 指 南 CD 光 碟 BR-6208AC 電 源 供 應 器 網 路 線 2. 將 設 備 接 上 電 源, 即 可 使 用 智 慧 型 無 線 裝 置 進 行 設 定 A. 接 上 電 源 B. 啟 用 智 慧 型 裝 置 的 無 線 Wi-Fi C. 選 擇 無 線 網 路 名 稱 "edimax.setup"

More information

LTTH-product-bro

LTTH-product-bro 海 南 海 航 汉 莎 技 术 培 训 有 限 公 司 培 训 课 程 介 绍 飞 机 维 修 培 训 课 程 海 航 汉 莎 培 训 产 品 产 品 选 择 培 训 目 标 海 南 海 航 汉 莎 技 术 培 训 有 限 公 司 是 于 2007 年 由 德 国 汉 莎 技 术 培 训 和 海 航 集 团 共 同 出 资 建 立 的 一 家 专 门 从 事 民 用 航 空 维 修 培 训 的 中

More information

2 目 录 CONTENTS 福 建 旅 游 饭 店 2015 年 7 月 总 第 13 期 编 委 会 主 任 : 邹 子 平 编 委 :( 以 下 按 姓 氏 笔 划 排 列 ) 朱 庆 添 乔 刚 刘 开 荣 许 毅 忠 轩 焰 吴 健 敏 宋 勇 张 峰 张 永 东 张 信 荣 陈 淑 婷

2 目 录 CONTENTS 福 建 旅 游 饭 店 2015 年 7 月 总 第 13 期 编 委 会 主 任 : 邹 子 平 编 委 :( 以 下 按 姓 氏 笔 划 排 列 ) 朱 庆 添 乔 刚 刘 开 荣 许 毅 忠 轩 焰 吴 健 敏 宋 勇 张 峰 张 永 东 张 信 荣 陈 淑 婷 旅 游 饭 店 协 会 专 业 省 委 N 会 福 建 员 N H A IA T J IO FU 福建旅游饭店 O FUZHOU HOTEL 福 州 大 饭 店 TE S LS AS O C I 福建省旅游协会饭店分会主办 2015 年 7 月 总第 13 期 月度简报 内部资料 会员交流 2 目 录 CONTENTS 福 建 旅 游 饭 店 2015 年 7 月 总 第 13 期 编 委 会 主

More information

<28B8D5C5AA29B0EABBDAB14DB77EB6BAA9B1AB65C269AD5EBB795FA743B6A5C0C E616C292E706466>

<28B8D5C5AA29B0EABBDAB14DB77EB6BAA9B1AB65C269AD5EBB795FA743B6A5C0C E616C292E706466> Unit 1 Making eservations Chapter 1 Accepting a Booking Chapter 2 Describing the Views Chapter 3 ooms Not Available Chapter 4 Explaining oom ates Chapter 5 A Caller eserving a oom for Others Chapter 6

More information

Lorem ipsum dolor sit amet, consectetuer adipiscing elit

Lorem ipsum dolor sit amet, consectetuer adipiscing elit English for Study in Australia 留 学 澳 洲 英 语 讲 座 Lesson 3: Make yourself at home 第 三 课 : 宾 至 如 归 L1 Male: 各 位 朋 友 好, 欢 迎 您 收 听 留 学 澳 洲 英 语 讲 座 节 目, 我 是 澳 大 利 亚 澳 洲 广 播 电 台 的 节 目 主 持 人 陈 昊 L1 Female: 各 位

More information

LSC操作说明

LSC操作说明 1 C H R I S T A L P H A 1-4 LSC 型 Part. No. 102041 A L P H A 2-4 LSC 型 Part. No. 10204 冷 冻 干 燥 机 操 作 说 明 新 研 制 的 LSC-8 控 制 器, 具 备 图 形 显 示 功 能, 能 以 数 据 表 形 式 显 示 参 数, 并 可 选 配 控 制 软 件 LSC-8 1/4 VGA 大 屏 幕

More information

关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 1 水 质 : 瓶 装 的, 不 一 定 就 是 更 好 的 2 生 产 : 监 管 缺 位, 消 费 者 暴 露 于 风 险 之 中 人 们 往 往 假 定 瓶 装 水 是

关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 1 水 质 : 瓶 装 的, 不 一 定 就 是 更 好 的 2 生 产 : 监 管 缺 位, 消 费 者 暴 露 于 风 险 之 中 人 们 往 往 假 定 瓶 装 水 是 关 于 瓶 装 水, 你 不 得 不 知 的 件 事 情 关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 关 于 瓶 装 水, 你 不 得 不 知 的 8 件 事 情 1 水 质 : 瓶 装 的, 不 一 定 就 是 更 好 的 2 生 产 : 监 管 缺 位, 消 费 者 暴 露 于 风 险 之 中 人 们 往 往 假 定 瓶 装 水 是 干 净 安 全 健 康 的, 广 告 传 递

More information

8016_2_1page

8016_2_1page VARICONTM PART NUMBERING SYSTEM 00 NO. NUMBER OF CONTACTS 20=020, 38=038, 56=056, 90=090, 120=120 CONTACT CODE INSULATOR V=Standard Type HV=For High Voltage ( ) ( NO. OF CONTACTS) 20,38,56,90,120 (PITCH

More information

Earthquake_Ch

Earthquake_Ch ARE YOU PREPARED FOR AN EARTHQUAKE? (CHINESE) 您 为 地 震 做 好 准 备 了 吗? Prepared for residents of University Family Housing, as part of the Program for Earthquake Preparedness (PREP). 大 学 家 庭 住 房 的 防 震 准 备

More information

研究問題與研究目的表

研究問題與研究目的表 迎 頭 趕 上 - 提 升 英 語 低 成 就 學 生 拼 字 能 力 之 研 究 劍 潭 國 小 陳 書 郁 張 蘇 美 黃 小 青 吳 忠 訓 1 摘 要 詞 彙 多 寡 關 係 到 語 言 學 習 的 四 大 能 力 : 聽 說 寫 讀, 單 字 數 量 多 寡 是 決 定 英 語 能 力 的 關 鍵, 中 年 級 是 培 養 學 生 良 好 學 習 策 略 的 關 鍵 時 期 學 校 英 語

More information

中 华 人 民 共 和 国 家 知 识 产 公 报 2012 4 整 合 优 势 培 训 资 源 搭 建 人 才 培 养 平 台 全 国 知 识 产 权 培 训 基 地 工 作 迈 上 新 台 阶 (35 ) 甘 绍 宁 副 局 长 在 国 家 知 识 产 权 培 训 基 地 研 讨 班 上 的 讲

中 华 人 民 共 和 国 家 知 识 产 公 报 2012 4 整 合 优 势 培 训 资 源 搭 建 人 才 培 养 平 台 全 国 知 识 产 权 培 训 基 地 工 作 迈 上 新 台 阶 (35 ) 甘 绍 宁 副 局 长 在 国 家 知 识 产 权 培 训 基 地 研 讨 班 上 的 讲 中 华 人 民 共 和 国 国 家 知 识 产 公 报 GAZETTE OF STATE INTELLECTUAL PROPERTY OFFICE OF THE PEOPLE S REPUBLIC OF CHINA 2012 年 第 四 期 ( 总 第 16 期 ) 目 录 主 办 单 位 : 中 华 人 民 共 和 国 国 家 知 识 产 办 公 室 编 辑 者 : 中 华 人 民 共 和 国 国

More information

TAITRA SEMI TPVIA ITRI 10 20 7 6 10 21 7 8 10 22 10 24 ~ 9 5 10 24 5 7 10 25 10 6 1. 12 150 2. 3. AD 5 5 / HCPV DSSCBIPV / 1 1. 2. 1. 2. 3. 4. 5. 6. 7. 8. 2014 5 20 3 3 NT$ 89,000 NT$ 66,000 3 3 NT$ 104,000

More information

T

T 页 码,1/121 中 国 人 民 共 和 国 国 家 标 准 建 筑 给 水 排 水 设 计 规 范 Code for design of building water supply and drainage GB 50015-2003 (2009 年 版 ) 主 编 部 门 : 上 海 市 城 乡 建 设 和 交 通 委 员 会 批 准 部 门 : 中 华 人 民 共 和 国 住 房 和 城 乡

More information

綠色產業、生活風格與健康論述:有機食品消費之社會文化分析

綠色產業、生活風格與健康論述:有機食品消費之社會文化分析 國 立 台 灣 大 學 建 築 與 城 鄉 研 究 學 報 第 十 九 期 民 國 一 百 零 一 年 六 月 研 究 論 文 第 43 頁 64 頁 Journal of Building and Planning, National Taiwan University Number 19, Jun. 2012, Research, pp. 43-64 消 失 的 理 想 住 宅 方 案 劉 欣

More information

CANVIO_AEROCAST_CS_EN.indd

CANVIO_AEROCAST_CS_EN.indd 简 体 中 文...2 English...4 SC5151-A0 简 体 中 文 步 骤 2: 了 解 您 的 CANVIO AeroCast CANVIO AeroCast 无 线 移 动 硬 盘 快 速 入 门 指 南 欢 迎 并 感 谢 您 选 择 TOSHIBA 产 品 有 关 您 的 TOSHIBA 产 品 的 详 情, 请 参 阅 包 含 更 多 信 息 的 用 户 手 册 () 安

More information

A dissertation for Master s degree Metro Indoor Coverage Systems Analysis And Design Author s Name: Sheng Hailiang speciality: Supervisor:Prof.Li Hui,

A dissertation for Master s degree Metro Indoor Coverage Systems Analysis And Design Author s Name: Sheng Hailiang speciality: Supervisor:Prof.Li Hui, 中 国 科 学 技 术 大 学 工 程 硕 士 学 位 论 文 地 铁 内 移 动 通 信 室 内 覆 盖 分 析 及 应 用 作 者 姓 名 : 学 科 专 业 : 盛 海 亮 电 子 与 通 信 导 师 姓 名 : 李 辉 副 教 授 赵 红 媛 高 工 完 成 时 间 : 二 八 年 三 月 十 日 University of Science and Technology of Ch A dissertation

More information

期末報告-小便斗.doc

期末報告-小便斗.doc 1 ..3..4..4..8.10.13.15.17.18.18.20 23 28 29 39 2 urinal OED urinal a glass of vessel or phial employed to receive urine for medical examination 2006:30 chamber-pot 2006:39 urinal a building, erection,

More information

预 算 : 18.3 million 摄 影 :Peter Cook

预 算 : 18.3 million 摄 影 :Peter Cook 荷 兰, 阿 姆 斯 特 丹,Solid 11 大 厦 / Tony Fretton Architects 建 筑 师 :Tony Fretton Architects 地 点 : 荷 兰 阿 姆 斯 特 丹 设 计 组 :Tony Fretton, Jim McKinney, Sandy Rendel, Laszlo Csutoras, Clemens Nuyken, Chris Neve, Donald

More information

02 轻钢构架固模剪力墙结构技术规程(修订) - 征求意见稿.doc

02 轻钢构架固模剪力墙结构技术规程(修订) - 征求意见稿.doc 中 国 工 程 建 设 协 会 标 准 轻 钢 构 架 固 模 剪 力 墙 结 构 技 术 规 程 Technical specification for shearwall structures with lightweight-steel framework and fixed-form CECS 283 : 2016 ( 征 求 意 见 稿 ) 主 编 单 位 : 清 华 大 学 建 筑 设

More information

5001787 The Gaggenau Magazine. 嘉 格 纳 杂 志 嘉 格 纳 展 厅 上 海 上 海 市 南 京 西 路 1266 号 恒 隆 广 场 二 期 4710 室 邮 政 编 码 :200040 电 话 号 码 :+86 (21) 3229 0368 传 真 号 码 :+86 (21) 3229 0366 嘉 格 纳 展 厅 北 京 北 京 市 朝 阳 区 建 外 大 街

More information

Microsoft Word - 建筑设计防火规范GB_50016

Microsoft Word - 建筑设计防火规范GB_50016 中 华 人 民 共 和 国 国 家 标 准 建 筑 设 计 防 火 规 范 GB 50016--2006 主 编 部 门 : 中 华 人 民 共 和 国 公 安 部 批 准 部 门 : 中 华 人 民 共 和 国 建 设 部 施 行 日 期 :2006 年 12 月 1 日 中 华 人 民 共 和 国 建 设 部 公 告 第 450 号 建 设 部 关 于 发 布 国 家 标 准 建 筑 设 计 防

More information

自然辩证法索引

自然辩证法索引 自 然 与 科 学 技 术 哲 学 名 词 索 引 上 海 交 通 大 学 可 信 任 数 字 技 术 实 验 室 制 Copyright 2009 Trust Digital Technology Laboratory, Shanghai Jiao Tong University. Permission is hereby granted, free of charge, to any person

More information

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the

水 土 保 持 學 報 47 (3): 1449 1464 (2015) Journal of Soil and Water Conservation, 47 (3): 1449 1464 (2015) ABSTRACT In this research, it is focused on the 中 苗 農 村 再 生 社 區 農 村 建 設 設 施 體 檢 之 評 估 (1) 黃 隆 明 (2) 林 芸 暄 摘 要 (3) 徐 森 彥 本 研 究 蒐 集 民 國 90 年 至 103 年, 中 苗 地 區 88 個 農 再 社 區 中, 以 往 災 害 通 報 較 頻 繁 之 農 村 建 設 設 施, 作 為 辦 理 體 檢 評 估 之 對 象 ; 除 了 運 用 GIS 掌 握 農 村

More information

FILTRON 1. DC AC AC 220V 50HZ 2. 1 1 1 3. / / / / 4. 1) 2 3 4 5 6 5. 6. 7. 8. 9. / 10. 1. 2. 3. 4. 5. 6. 7. DC AC FILTRON DC AC FILTRON DC 12V 12VDC D

FILTRON 1. DC AC AC 220V 50HZ 2. 1 1 1 3. / / / / 4. 1) 2 3 4 5 6 5. 6. 7. 8. 9. / 10. 1. 2. 3. 4. 5. 6. 7. DC AC FILTRON DC AC FILTRON DC 12V 12VDC D 2006 4 27 1 JY FILTRON 1. DC AC AC 220V 50HZ 2. 1 1 1 3. / / / / 4. 1) 2 3 4 5 6 5. 6. 7. 8. 9. / 10. 1. 2. 3. 4. 5. 6. 7. DC AC FILTRON DC AC FILTRON DC 12V 12VDC DC FILTRON AC 24VAC 24VAC AC 24VAC AC

More information

Microsoft Word - F&E List for KG-cum-CCC (for uploading to SWD Webpage)

Microsoft Word - F&E List for KG-cum-CCC (for uploading to SWD Webpage) 家 具 及 設 備 表 為 二 至 六 歲 兒 童 提 供 的 全 日 制 幼 稚 園 暨 幼 兒 中 心 (100 個 名 額 計 ) List of Furniture and Equipment Kindergarten-cum-Child Care Centre for full-day children aged 2 to 6 (for 100 Places) (2015 年 8 月 August

More information

Abstract Since 1980 s, the Coca-Cola came into China and developed rapidly. From 1985 to now, the numbers of bottlers has increased from 3 to 23, and

Abstract Since 1980 s, the Coca-Cola came into China and developed rapidly. From 1985 to now, the numbers of bottlers has increased from 3 to 23, and Abstract Since 1980 s, the Coca-Cola came into China and developed rapidly. From 1985 to now, the numbers of bottlers has increased from 3 to 23, and increases ulteriorly. When the Coca-Cola company came

More information

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D>

<4D6963726F736F667420506F776572506F696E74202D20C6F3D2B5BCB0B2FAC6B7BCF2BDE92DD6D0D3A2CEC420C1F5B9FAD3B1205BBCE6C8DDC4A3CABD5D> 企 业 及 产 品 简 介 COMPANY & PRODUCTS INTRODUCTION 山 东 泗 水 康 得 新 复 合 材 料 有 限 公 司 SHANDONG SISHUI KANGDE XIN COMPOSITE MATERIAL CO., LTD. 集 团 概 况 KDXGROUP OVERVIEW 1 拥 有 两 大 产 业 群 : 预 涂 膜 和 光 学 膜 1. GROUP HAS

More information

<4D6963726F736F667420576F7264202D20BDA8D6FEC9E8BCC6B7C0BBF0B9E6B7B6205F325F2E646F63>

<4D6963726F736F667420576F7264202D20BDA8D6FEC9E8BCC6B7C0BBF0B9E6B7B6205F325F2E646F63> 中 华 人 民 共 和 国 国 家 标 准 GB 50016-2006 建 筑 设 计 防 火 规 范 Code of Design on Building Fire Protection and Prevention 2006-07-12 发 布 2006-12-01 实 施 中 华 人 民 共 和 国 建 设 部 中 华 人 民 共 和 国 国 家 质 量 监 督 检 验 检 疫 总 局 联 合

More information

Microsoft PowerPoint - RestaurantFolder vQG3 chinese [Compatibility Mode]

Microsoft PowerPoint - RestaurantFolder vQG3 chinese [Compatibility Mode] 执 照 许 可 检 查 餐 厅 开 业 指 南 City of Chicago www.cityofchicago.org/restaurant 亲 爱 的 朋 友 : 芝 加 哥 是 一 座 世 界 一 流 的 城 市, 有 着 一 大 批 丰 富 多 样 的 餐 厅 咖 啡 厅 和 面 包 店 这 座 城 市 的 餐 厅 也 是 主 要 的 就 业 机 会 创 造 者, 负 责 将 近 芝 加

More information

2

2 40 2 3 4 5 ^ ^ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PLEASE AFFIX STAMP HERE Diabetes Hongkong Unit 1802, 18/F., Tung Hip Commercial Bldg., 244-252 Des Voeux Rd C, HK. Diabetes Hongkong membership

More information

Microsoft Word - Atmel-45136A-Pick-Best-Microcontroller-Strom-Eiland-Flodell_Article_CS

Microsoft Word - Atmel-45136A-Pick-Best-Microcontroller-Strom-Eiland-Flodell_Article_CS 如 何 为 您 的 下 一 款 设 计 选 出 最 好 的 8 位 或 32 位 微 控 制 器 作 者 : Atmel 产 品 营 销 高 级 总 监 Oyvind Strom Atmel 产 品 营 销 总 监 Andreas Eieland Atmel 研 发 工 具 部 门 高 级 产 品 营 销 经 理 Henrik Flodell 不 久 之 前, 嵌 入 式 系 统 还 是 既 昂 贵

More information

Microsoft PowerPoint - CPSIA Tracking label (with simplified chinese) [Read-Only] [Compatibility Mode]

Microsoft PowerPoint - CPSIA Tracking label (with simplified chinese) [Read-Only] [Compatibility Mode] CPSIA Tracking Labels for children s products CPSIA 儿 童 产 品 溯 源 标 签 Confidentiality Copyright 2009 Bureau Veritas Consumer Products Services, Inc. Proprietary to Bureau Veritas Consumer Products Services,

More information

西部人居环境学刊2016年第1期.indd

西部人居环境学刊2016年第1期.indd 2016年第1期 / 西部人居环境学刊 / 095 风景园林设计与研究 DOI: 10.13791/j.cnki.hsfwest.20160116 金云峰, 杨玉鹏. 数字化设计与建造技术在景观中的应用研究[J]. 西部人居环境学刊, 2016, 31(01): 95-100. 数字化设计与建造技术在景观中的应用研究* The Application of Digital Design and Fabrication

More information

NIKE NIKE adidas UNDER ARMOUR Lululemon PUMA THE NORTH FACE Silicone Silicone Silicone / / Silicone Outdoor Sportswear Sportswear Si

NIKE NIKE adidas UNDER ARMOUR Lululemon PUMA THE NORTH FACE Silicone Silicone Silicone / / Silicone Outdoor Sportswear Sportswear Si 130 (Silicone Screen Printing) (Dow Corning) (Silicone Screen Printing) 130 1943 45 2004 Silicone Silicone 42 223 ... 2010 NIKE NIKE adidas UNDER ARMOUR Lululemon PUMA THE NORTH FACE......... Silicone

More information

untitled

untitled VOL 18 NO 4 (Supplement 1) Oct - Dec 2011 ISSN 1727-2874 The Pharmaceutical Society of Hong Kong The Practising Pharmacists Association of Hong Kong The Society of Hospital Pharmacists of Hong Kong HK$80.00

More information

Applied Biosystems StepOne™ Real-Time PCR System Quick Reference Card for Installation

Applied Biosystems StepOne™ Real-Time PCR System Quick Reference Card for Installation Applied Biosystems StepOne Real-Time PCR System StepOne 系统安装 快速参考卡 本文档提供在并置布局中安装 StepOne 系统的简明指导 有关 完整步骤或独立安装步骤 请参阅 Applied Biosystems StepOne Real-Time PCR System 安装 联网和维护指南 目录 1. 安装准备........................................

More information

输电线路智能监测系统通信技术应用研究

输电线路智能监测系统通信技术应用研究 Smart Grid 智 能 电 网, 2014, 4, 11-15 http://dx.doi.org/10.12677/sg.2014.41003 Published Online February 2014 (http://www.hanspub.org/journal/sg.html) Application Research of Communication Technology for

More information

Microsoft Word - SMT2016中文通知-苏

Microsoft Word - SMT2016中文通知-苏 钢 协 国 2016 009 号 关 于 参 加 第 十 四 届 钢 材 市 场 和 贸 易 国 际 研 讨 会 的 通 知 各 有 关 单 位 : 由 中 国 钢 铁 工 业 协 会 主 办 中 国 贸 促 会 冶 金 行 业 分 会 和 广 东 乐 从 钢 铁 世 界 有 限 公 司 承 办 的 第 十 四 届 钢 材 市 场 和 贸 易 国 际 研 讨 会 将 于 2016 年 3 月 23

More information

附件1.1

附件1.1 附 件 1.1 第 九 届 中 国 东 北 亚 博 览 会 特 装 布 展 资 质 单 位 名 单 排 名 不 分 先 后 单 位 名 称 联 系 人 联 系 电 话 手 机 北 京 福 展 国 际 展 览 有 限 公 司 牟 晓 丽 010-66210788 18701261104 北 京 美 索 拓 展 国 际 展 览 展 示 有 限 公 司 汤 远 涛 010-60539325 13718378564

More information

第8 期 胡发宗: 市域铁路概算编制原则建议 城 晋城 昆阳方向的快速出行 温州市 S1 线为双 线电气化铁路 设计时速 120 km / h 一期工程线路全 长 51 9 正线 km 设置车站 14 座( 地下车站 4 座 高架 站 7 座 地面站 3 座 ) ; 昆明市东西线铁路为双线电气 化铁

第8 期 胡发宗: 市域铁路概算编制原则建议 城 晋城 昆阳方向的快速出行 温州市 S1 线为双 线电气化铁路 设计时速 120 km / h 一期工程线路全 长 51 9 正线 km 设置车站 14 座( 地下车站 4 座 高架 站 7 座 地面站 3 座 ) ; 昆明市东西线铁路为双线电气 化铁 第 8 期( 总 167) Aug 2012 NO 8( Ser 167) 铁 道 工 程 学 报 JOURNAL OF RAILWAY ENGINEERING SOCIETY 文章编号: 1006 2106( 2012) 08 0094 05 市域铁路概算编制原则建议 胡发宗 ( 中铁第四勘察设计院集团有限公司 武汉 430063) 摘要: 研究目的: 专长于解决城市中心区与远郊区县的市域铁路 对于城市公共交通系统具有较强的补充性

More information

Microsoft PowerPoint - Eisenstein_ABET_Presentation_Beijing_Oct_2007-Chinese.ppt [兼容模式]

Microsoft PowerPoint - Eisenstein_ABET_Presentation_Beijing_Oct_2007-Chinese.ppt [兼容模式] Bruce Eisenstein 博 士 是 Drexel 大 学 电 气 和 计 算 机 工 程 系 的 Arthur J. Rowland 教 授, 同 时 是 电 气 和 计 算 机 工 程 系 的 前 任 系 主 任 (1980-1995) 他 是 一 个 受 尊 敬 的 IEEE 的 领 导 者, 在 2000 年 担 任 IEEE 的 主 席 在 担 任 主 席 以 前,Eisenstein

More information

WFC40810

WFC40810 9000086873 (PD 85 05 10) Operating and Installation Instructions Please read this specification carefully before you use the product. Any failure and losses caused by ignoring the above mentioned items

More information

BDERO100-TWZZ manual V3

BDERO100-TWZZ manual V3 1 4 5 2 3 A B 8 7 6 C D Oscillations 2.4mm 空載轉速 震動幅度 2.4mm 請注意! 各地區上市產品/配件不盡相同, 請依台灣 繁體中文說明書的內容為主 Warning! Attachments and accessories are not the same in each region, please only refer to Taiwan Traditional

More information

untitled

untitled Employment Information 職 業 資 料 Employment Status 職 業 狀 況 + Self-Employed 自 僱 (S) + Full-time Employed 全 職 (F) + Part-time Employed 兼 職 (P) Student 學 生 (T) Housewife 主 婦 (H) Retired 退 休 (R) Not Currently

More information

建 議 (A) 具 體 的 管 理 和 維 修 標 準 3. 條 例 第 18(1) 條 特 別 訂 明 業 主 法 團 對 管 理 和 維 修 建 築 物 的 公 用 部 分, 負 有 若 干 責 任, 但 條 例 卻 沒 有 具 體 訂 明 管 理 和 維 修 的 標 準 4. 我 們 建 議

建 議 (A) 具 體 的 管 理 和 維 修 標 準 3. 條 例 第 18(1) 條 特 別 訂 明 業 主 法 團 對 管 理 和 維 修 建 築 物 的 公 用 部 分, 負 有 若 干 責 任, 但 條 例 卻 沒 有 具 體 訂 明 管 理 和 維 修 的 標 準 4. 我 們 建 議 檔 號 :S/F(3) in HAB/CR/8/10/12 立 法 會 參 考 資 料 摘 要 建 築 物 管 理 條 例 ( 第 344 章 ) 2000 年 建 築 物 管 理 ( 修 訂 ) 條 例 草 案 前 言 在 二 零 零 零 年 一 月 十 一 日 的 會 議 上, 行 政 會 議 建 議, 行 政 長 官 指 令 2000 年 建 築 物 管 理 ( 修 訂 ) 條 例 草 案 (

More information

Gassama Abdoul Gadiri University of Science and Technology of China A dissertation for master degree Ordinal Probit Regression Model and Application in Credit Rating for Users of Credit Card Author :

More information

16 WANG FUNG TERRACE 售樓說明書部份 住宅物業的樓面平面圖

16 WANG FUNG TERRACE 售樓說明書部份 住宅物業的樓面平面圖 GLOSSARY 詞彙表 ACCESS CHAMBER A/C PLATFORM = AIR CONDITIONING PLATFORM 喉管入口冷氣機平台 ARCH. FEATURE = ARCHITECTURAL FEATURE 建築裝飾 BALCONY 露台 BALCONY ABOVE 上層露台 BATH = BATHROOM 浴室 BEDROOM 睡房 C.D. = CABLE DUCT 電線槽

More information

游戏攻略大全(三十六).doc

游戏攻略大全(三十六).doc I...1...4...5...16...25...26...56...71...72 (METAL GEAR SOLID)...72...75...76...78...78...80...82 (METAL GEAR SOLID)...85...86...87...89...91...92...94 A...96 B...97...98...99 :... 101 :... 103... 106...

More information

樓宇水管裝置手冊

樓宇水管裝置手冊 樓 宇 水 管 裝 置 手 冊 水 務 署 目 錄 1. 概 言... 2 1.1. 釋 義... 2 1.2. 不 適 用... 3 1.3. 常 用 配 件... 3 2. 水 務 監 督 及 用 戶 / 代 理 人 的 責 任... 5 2.1. 責 任 的 劃 分... 5 2.2. 用 戶 / 代 理 人 的 責 任... 5 2.3. 水 管 敷 設 工 程 須 符 合 的 一 般 原

More information

<B4BCBC7ABC70A9D0A1C4313032312E696E6464>

<B4BCBC7ABC70A9D0A1C4313032312E696E6464> about us historical timeline wood slate print pure SmartClean automatic speciality hidden.bed system furniture stainless steel bathroom furniture anti-cockroach system panel options 2 3 AIKitchen, a Taiwan-based

More information

Microsoft Word - 105碩博甄簡章.doc

Microsoft Word - 105碩博甄簡章.doc 淡 江 大 105 年 度 博 甄 試 招 生 簡 章 104 年 9 月 16 日 本 校 招 生 委 員 會 105 年 度 第 1 次 會 議 決 議 通 過 淡 江 大 網 址 :http://www.tku.edu.tw 淡 江 大 105 年 度 博 甄 試 招 生 簡 章 目 錄 壹 報 考 資 格 及 相 關 規 定 1 貳 報 名 與 注 意 事 項 1 參 考 試 日 期 地 點

More information

pdf

pdf CENTRO 花 甲 老 人 的 for 交 the over 60s 通 travel 证 passes for the over 60s travel passes for the over 60s travel 谢 谢 发 给 我 这 个 交 通 证, travel passes for the over 60s 我 travel 今 passes 年 for 66 the over 岁 60s

More information

<4D6963726F736F667420576F7264202D20D7A1D5ACCEEFD2B5B7FECEF1B1EAD7BCA3A8B1A8C5FAB8E5A3A92E646F63>

<4D6963726F736F667420576F7264202D20D7A1D5ACCEEFD2B5B7FECEF1B1EAD7BCA3A8B1A8C5FAB8E5A3A92E646F63> 北 京 市 地 方 标 准 住 宅 物 业 服 务 标 准 Residential Property Service Standard 编 号 :DB11/T 751-2010 主 编 单 位 : 北 京 市 物 业 服 务 指 导 中 心 批 准 部 门 : 北 京 市 住 房 和 城 乡 建 设 委 员 会 北 京 市 质 量 技 术 监 督 局 实 施 日 期 :2010 年 10 月 1 日

More information

Microsoft Word - 國慶問卷09簡報 _2_.doc

Microsoft Word - 國慶問卷09簡報 _2_.doc 國 慶 活 動 及 國 情 教 育 教 師 問 卷 調 查 簡 報 ( 二 零 零 九 年 十 一 月 十 日 ) 適 逢 今 年 為 中 華 人 民 共 和 國 成 立 六 十 周 年, 為 了 瞭 解 現 時 本 港 學 校 在 國 慶 期 間 進 行 慶 祝 活 動 的 情 況 和 教 師 對 國 情 教 育 的 看 法, 本 會 於 零 九 年 十 月 展 開 是 次 問 卷 調 查, 此

More information

WVT new

WVT new Operating and Installation Instructions 5120 004601 (PD 84 09 25) Please read this specification carefully before you use the product. Any failure and losses caused by ignoring the above mentioned items

More information

6-7 6-8 6-9 Process Data flow Data store External entity 6-10 Context diagram Level 0 diagram Level 1 diagram Level 2 diagram 6-11 6-12

6-7 6-8 6-9 Process Data flow Data store External entity 6-10 Context diagram Level 0 diagram Level 1 diagram Level 2 diagram 6-11 6-12 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-9 Process Data flow Data store External entity 6-10 Context diagram Level 0 diagram Level 1 diagram Level 2 diagram 6-11 6-12 6-13 6-14 6-15 6-16 6-17 6-18 6-19 6-20 6-21

More information

入學考試網上報名指南

入學考試網上報名指南 入 學 考 試 網 上 報 名 指 南 On-line Application Guide for Admission Examination 16/01/2015 University of Macau Table of Contents Table of Contents... 1 A. 新 申 請 網 上 登 記 帳 戶 /Register for New Account... 2 B. 填

More information

2015年4月11日雅思阅读预测机经(新东方版)

2015年4月11日雅思阅读预测机经(新东方版) 2015 年 5 月 9 日 雅 思 口 语 回 忆 版 ( 全 国 场 ) 2015 年 5 月 9 日 雅 思 口 语 回 忆 网 友 版 ( 华 北 & 东 北 区 ) 1 5.09 北 外 R9 p1 home apartment 以 后 想 住 个 什 么 样 的 房 子 还 有 几 个 忘 了 p2 a person u disagree sth p3 你 坚 持 不 同 意 别 人 吗

More information

2012 年 4 月 至 6 月 活 動 一 覽 月 份 計 劃 / 項 目 活 動 4 月 竹 園 中 心 活 動 竹 園 中 心 開 放 日 暨 沒 有 巴 掌 日 嘉 年 華 :4 月 28 日 v 迎 新 會 :4 月 21 日 童 歡 部 落 v 義 工 服 務 :5 月 27 日 v 小

2012 年 4 月 至 6 月 活 動 一 覽 月 份 計 劃 / 項 目 活 動 4 月 竹 園 中 心 活 動 竹 園 中 心 開 放 日 暨 沒 有 巴 掌 日 嘉 年 華 :4 月 28 日 v 迎 新 會 :4 月 21 日 童 歡 部 落 v 義 工 服 務 :5 月 27 日 v 小 八 月 通 訊 在 多 名 熱 心 青 年 的 參 與 及 香 港 救 助 兒 童 會 贊 助 下, 本 會 推 出 兒 童 專 網, 透 過 互 動 遊 戲 及 討 論 區, 讓 兒 童 及 青 少 年 認 識 更 多 保 護 兒 童 的 知 識, 包 括 虐 待 兒 童 的 種 類 家 居 安 全 及 自 我 保 護 在 過 去 數 個 月, 兒 童 專 網 的 點 擊 次 數 已 累 積 至

More information

伦敦大众时报 第 2 版 广告 2015年8月 28 日 星期五 合理规划 增值创收; 防范风险, 平安幸福 保险,投资, 房贷, 税务, 退休,教育,遗产规划 全方位一站式服务 保险: Canada Life, Great-West Life, Manulife 及Sun Life 大型保险公司人

伦敦大众时报 第 2 版 广告 2015年8月 28 日 星期五 合理规划 增值创收; 防范风险, 平安幸福 保险,投资, 房贷, 税务, 退休,教育,遗产规划 全方位一站式服务 保险: Canada Life, Great-West Life, Manulife 及Sun Life 大型保险公司人 伦敦 大众时报 Aug 28 8月 London Chinese Press (ISSN 1912-8959) ( 下 ) 2015年8月28日 星期五 电话(TEL):(519)777-4098 第149期 创刊于2005年 302 WoodHolme ask 799k SOLD 2378 Meadowland ask 599K SOLD 1085 Oakcrossing Rd ask 390k

More information

<4D6963726F736F667420576F7264202D20A3A8D3A1CBA2A3A932303135C4EAB1BEBFC6D7A8D2B5BDE9C9DC5FD6D0CEC45FA3A831313035A3A9>

<4D6963726F736F667420576F7264202D20A3A8D3A1CBA2A3A932303135C4EAB1BEBFC6D7A8D2B5BDE9C9DC5FD6D0CEC45FA3A831313035A3A9> 本 科 留 学 生 招 生 专 业 简 介 建 筑 学 专 业 (Architecture): 建 筑 学 是 一 门 综 合 性 较 强 的 学 科, 具 有 科 学 与 艺 术 理 工 与 人 文 结 合 的 特 点, 要 求 学 生 知 识 面 广 泛, 有 较 强 的 形 象 思 维 能 力 色 盲 者 不 能 报 考 本 专 业 主 要 课 程 有 数 学 计 算 机 基 础 建 筑 技

More information

PERSONAL PARTICULARS 个 人 资 料 ( 续 ) Citizenship (Please tick and attach a certified true copy pf your birth certificate, NRIC, Passport or Citizenship

PERSONAL PARTICULARS 个 人 资 料 ( 续 ) Citizenship (Please tick and attach a certified true copy pf your birth certificate, NRIC, Passport or Citizenship 南 洋 公 共 管 理 研 究 生 院 Master of Public Administration Programme 公 共 管 理 硕 士 学 位 项 目 Application For Admission 入 学 申 请 表 格 Admission Year 2012/13 入 学 年 份 2012/2013 Passport-sized photograph 请 贴 上 护 照 型 近

More information

A

A 本 章 描 述 了 AU400 自 动 生 化 分 析 仪 的 安 装 使 用 环 境 标 准 附 件 注 意 事 项 及 其 他 相 关 的 要 求 请 在 使 用 仪 器 前 阅 读 此 部 分 为 安 全 高 效 的 使 用 自 动 生 化 分 析 仪 必 须 遵 守 使 用 须 知 目 录 1. 安 全 事 项 A-02 2. 使 用 须 知 A-04 3. 安 装 环 境 A-05 4.

More information

基本 CMYK

基本 CMYK Congratulations Units List 15 Exhibition Schedule Location Map Floor Plan Exhibitior Index Zone A 17 18 19 20 23 Zone B 54 List of Safety Technology Prevention Constructors Approved 98 in Shhanghai 111

More information

2011第1期第二部分

2011第1期第二部分 中 国 农 学 通 报 2011,27(01):466-470 Chinese Agricultural Science Bulletin 关 于 农 业 信 息 化 与 农 村 信 息 化 关 系 的 探 讨 高 万 林, 张 港 红, 李 桢, 赵 佳 宁 ( 中 国 农 业 大 学 信 息 与 电 气 工 程 学 院, 北 京 100083) 摘 要 : 文 章 通 过 分 析 农 业 农 村

More information

EMC® VNX® Series VNX8000™ Block 安装指南

EMC® VNX® Series VNX8000™ Block 安装指南 EMC VNX Series VNX8000 Block 安 装 指 南 300-999-791 REV 05 版 权 所 有 2014-2015 EMC Corporation 保 留 所 有 权 利 中 国 印 刷 发 布 日 期 : 2015 年 2 月 EMC 确 信 本 出 版 物 在 发 布 之 日 内 容 准 确 无 误 本 出 版 物 中 的 信 息 可 随 时 更 改 而 不 另

More information

經濟部智慧財產局

經濟部智慧財產局 經 濟 部 智 慧 財 產 局 我 國 著 作 權 合 理 使 用 實 務 見 解 之 研 究 期 末 報 告 書 執 行 單 位 益 思 科 技 法 律 事 務 所 中 華 民 國 一 一 年 十 二 月 八 日 I 我 國 著 作 權 合 理 使 用 實 務 見 解 之 研 究 期 末 報 告 書 計 畫 主 持 人 賴 文 智 : 益 思 科 技 法 律 事 務 所 所 長 臺 灣 大 學 法

More information

OTES TO PURCHASERS OF FIRST-HAD RESIDETIAL PROPERTIES You are advised to take the following steps before purchasing first-hand residential properties.

OTES TO PURCHASERS OF FIRST-HAD RESIDETIAL PROPERTIES You are advised to take the following steps before purchasing first-hand residential properties. OTES TO PURCHASERS OF FIRST-HAD RESIDETIAL PROPERTIES You are advised to take the following steps before purchasing first-hand residential properties. FOR ALL FIRST-HAD RESIDETIAL PROPERTIES 1. IMPORTAT

More information

境外投资快报

境外投资快报 境 外 投 资 快 报 第 七 期 2015/02/11 中 国 ( 上 海 ) 自 由 贸 易 试 验 区 境 外 投 资 服 务 平 台 WWW.SHFTZ.CN 1 / 12 目 录 优 质 稀 缺 伦 敦 市 中 心 住 宅 开 发 项 目... 3 法 国 四 星 级 酒 店, 紧 邻 法 国 波 尔 多 玛 歌 酒 庄... 4 中 资 企 业 投 资 英 国 的 场 面 与 门 道...

More information

Microsoft Word - Form 3 Page 3 _Chi_.doc

Microsoft Word - Form 3 Page 3 _Chi_.doc 收 表 時 間 星 期 一 至 五 上 午 八 時 四 十 五 分 至 下 午 十 二 時 三 十 分 下 午 二 時 至 五 時 表 格 3 旅 行 代 理 商 條 例 ( 第 218 章 ) 法 人 團 體 提 交 的 牌 照 申 請 書 現 根 據 旅 行 代 理 商 條 例 第 II 部 向 旅 行 代 理 商 註 冊 主 任 申 請 牌 照 1. (a) 公 司 或 其 他 法 人 團 體

More information

CACV

CACV 上 午 9 時 35 分 恢 復 聆 訊 出 席 人 士 : 石 永 泰 資 深 大 律 師 許 偉 強 大 律 師 及 鄭 欣 琪 大 律 師, 為 外 聘 律 師, 代 表 王 鳴 峰 資 深 大 律 師 陳 樂 信 大 律 師 及 羅 頌 明 大 律 師, 由 律 政 司 延 聘, 代 表 水 務 署 署 長 李 柱 銘 資 深 大 律 師 譚 俊 傑 大 律 師 吳 思 諾 大 律 師 及

More information

建國科大 許您一個海闊天空的未來 建國科大本著術德兼修五育並重的教育方針 持續努力的朝向專業教學型大學邁進 期許建國的學生能成為企業所樂用的人才 建國科大多元性發展與延伸觸角 如 教學卓越計畫 產官學合作 國際交流活動等等 讓師生能充實基礎實力 更提升競爭力 不管將來是要升學或是就業 都能一帆風順

建國科大 許您一個海闊天空的未來 建國科大本著術德兼修五育並重的教育方針 持續努力的朝向專業教學型大學邁進 期許建國的學生能成為企業所樂用的人才 建國科大多元性發展與延伸觸角 如 教學卓越計畫 產官學合作 國際交流活動等等 讓師生能充實基礎實力 更提升競爭力 不管將來是要升學或是就業 都能一帆風順 校刊 Chienkuo Monthly 224 2 0 11.4.1 6 出刊 學 力 實 力 願 力 建國科技大學辦學 卓越 優質 傑出 奉准101年起以公立標準招收繁星計畫學生 焦 點 報 導 建國科技大學奉准招收繁星計畫學生 學力實力願力 自動化工程系參加 2011臺灣無人飛機設計競賽 脫穎而出 獲得五座獎盃 兩 岸 交 流 華中科技大學武昌分校金國華董事長蒞校參訪 策略聯盟計畫 建國科技大學美容系舉辦新娘造型專題競賽活動

More information

傾銷事實分析報告

傾銷事實分析報告 對 自 中 國 大 陸 產 製 進 口 之 卜 特 蘭 水 泥 及 其 熟 料 申 請 繼 續 課 徵 反 傾 銷 稅 ( 公 開 版 ) 謹 呈 財 政 部 關 務 署 經 濟 部 貿 易 調 查 委 員 會 台 灣 區 水 泥 工 業 同 業 公 會 代 理 人 : 理 律 法 律 事 務 所 林 鳳 律 師 / 林 靖 苹 律 師 / 詹 凱 惟 律 師 日 期 :2016 年 5 月 3 日

More information

带 为 重 要 或 必 填 表 格, 请 在 截 止 日 期 之 前 回 传, 为 方 便 您 填 写 以 下 各 表, 请 至 模 展 馆 网 www.dmcexpo.com 登 录 并 填 写 以 下 备 表.............................. 1 : 贵 单 位 要 求 参 加 第 十 六 届 中 国 国 际 模 具 技 术 和 设 备 展 览 会 展 出 的 回 执

More information

76 34 2. 1. 1 Fig. 1 1 a-a b-b a-a σ ma = 74. 4 MPa σ a = 15. 74 MPa σ 0a =90. 15 MPa 0. 9 σ t =135 MPa b-b σ mb = 21. 77 MPa τ b = 13. 789 MPa σ 0b =

76 34 2. 1. 1 Fig. 1 1 a-a b-b a-a σ ma = 74. 4 MPa σ a = 15. 74 MPa σ 0a =90. 15 MPa 0. 9 σ t =135 MPa b-b σ mb = 21. 77 MPa τ b = 13. 789 MPa σ 0b = 34 11 2012 11 SHIP SCIENCE AND TECHNOLOGY Vol. 34 No. 11 Nov. 2012 0 430064 GB150-98 ASME THR3 +. 4 A 1672-7649 2012 11-0075 - 07 doi 10. 3404 /j. issn. 1672-7649. 2012. 11. 017 Stress and fatigue analysis

More information

<4D F736F F D20CFFBB7C0B8F8CBAEBCB0CFFBBBF0CBA8CFB5CDB3BCBCCAF5B9E6B7B E31322E32377A782E646F63>

<4D F736F F D20CFFBB7C0B8F8CBAEBCB0CFFBBBF0CBA8CFB5CDB3BCBCCAF5B9E6B7B E31322E32377A782E646F63> UDC GB 中 华 人 民 共 和 国 国 家 标 准 P GB50974-2014 消 防 给 水 及 消 火 栓 系 统 技 术 规 范 ( 报 批 稿 ) Technical code for fire protection water supply and hydrant systems 2014 01 19 发 布 2014 10 01 实 施 中 华 人 民 共 和 国 住 房 和 城

More information

HKG_ICSS_FTO_sogobrilingual_100_19Feb2016_31837_tnc

HKG_ICSS_FTO_sogobrilingual_100_19Feb2016_31837_tnc Terms and conditions: 1. The extra 5 Membership Rewards points promotion at SOGO ( the Promotion Offer ) is valid for spending only at SOGO Department Store at Causeway Bay and Tsim Sha Tsui within the

More information

园林概预算常识.doc

园林概预算常识.doc ...1...9...22...33...40...50...51...55...57...59...66...68...70 ( )...71...86...91...99... 110... 117 I ... 124 99... 127... 159 [... 160 [ ]... 162... 165... 166... 168 [ ]... 176 [ ]... 180 II 1 2 3

More information

(Microsoft PowerPoint - 2015A UPEC IR ppt \(cn\) \(NDR\)4.8 [\317\340\310\335\304\243\312\275])

(Microsoft PowerPoint - 2015A UPEC IR ppt \(cn\) \(NDR\)4.8 [\317\340\310\335\304\243\312\275]) 股 票 代 號 :1216 TT 2015 全 年 度 業 績 發 佈 (2016.4.11 更 新 ) Disclaimers The information contained in this presentation is intended solely for your personal reference. Such information is subject to change without

More information

(Microsoft PowerPoint - Glass - Briefing PPT \(Hotel BLG\)_v.3 [\254\333\256e\274\322\246\241])

(Microsoft PowerPoint - Glass - Briefing PPT \(Hotel BLG\)_v.3 [\254\333\256e\274\322\246\241]) 飲 品 玻 璃 樽 生 產 者 責 任 計 劃 公 眾 諮 詢 Public consultation: A new producer responsibility scheme on glass beverage bottles 每 日 產 生 廢 玻 璃 的 數 量 ( 公 噸 ) Daily generation of waste glass (tonne) 46 全 部 廢 玻 璃 All

More information

本研究主要关注的是中国内地东北地区一个省会城市中的中低收入社区内居民使用手机的情况,廓清手机这种信息沟通技术对于社区居民的影响

本研究主要关注的是中国内地东北地区一个省会城市中的中低收入社区内居民使用手机的情况,廓清手机这种信息沟通技术对于社区居民的影响 手 机 的 人 类 学 研 究 以 中 国 东 北 地 区 都 市 社 区 为 例 中 山 大 学 人 类 学 系 ( 广 州,510275) 姬 广 绪 摘 要 本 文 基 于 笔 者 2008 年 9 10 月 近 两 个 月 的 田 野 调 查, 对 中 国 东 北 地 区 辽 宁 省 沈 阳 市 的 一 个 中 低 收 入 社 区 居 民 使 用 手 机 的 情 况 进 行 了 调 查 笔

More information

<453A5CD7CAC1CF5CCDF8D5BED7CAC1CF5CB1A1C4A4B5E7C8DDC6F75CBEDBB1FBCFA9B1A1C4A4B5E7C8DDC6F75C BAD0CABDD7E8C8DDBDB5D1B9B5E7C8DDC6F75C F4D50505F4D4B502E646F63>

<453A5CD7CAC1CF5CCDF8D5BED7CAC1CF5CB1A1C4A4B5E7C8DDC6F75CBEDBB1FBCFA9B1A1C4A4B5E7C8DDC6F75C BAD0CABDD7E8C8DDBDB5D1B9B5E7C8DDC6F75C F4D50505F4D4B502E646F63> 金 属 化 聚 丙 烯 膜 阻 容 降 压 电 容 器 ( 盒 式 ) Metallized Polypropylene AC Capacitor for Capacitive Power Supply Circuit 外 形 图 Outline Drawing 特 性 Features 用 于 100VAC 240VAC 电 源 串 联 的 电 容 降 压 Designed for application

More information

untitled

untitled 度 1 1.1 1.2 度 樓 例 123 例 立 樓 樓 不 降 樓 樓 利 樓 料 樓 易 量 量 ( 量 () 樓 ( ) 列 列 (a) (b) (c) (d) (e) 利 便 力 (a) (d) 力 樓 5588 5 1991 2 8.4(a) (b) (h) 樓 樓 樓 更 廊 廊 ( 降 廊 ) 樓 2 例 老 留 樓 不 類 1.3 不 樓 更 樓 更 樓 ( 令 ) 更 樓 度 樓

More information